Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 108 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100107505 OIL,LUBRICANT,ISO VG 100,MINERAL,1L | A | Monitor | Insurance gap | 0 L | – | 10 / 25 | 0 / 0 / 11 | – | 0% | – |
| 4100017135 GASKET,SW,3IN,300#,GRAPHITE | A | Monitor | Insurance gap | 0 EA | – | 5 / 7 | 0 / 0 / 4 | – | 0% | – |
| 4100099672 SCREW,TAPPING,M6X25MM,CS ZN | S | Monitor | Insurance gap | 0 EA | – | 5 / 15 | 0 / 0 / 117 | – | 2% | – |
| 4100099548 SCREW,TAPPING,M3X16MM,SS304 | S | Monitor | Potentially obsolete | 2 EA | – | 2 / 6 | 0 / 0 / 117 | reorder ~17 Oct 2026 | 2% | – |
| 4100099295 SCREW,TAPPING,M4X10MM,CS ZN | S | Monitor | Potentially obsolete | 1 EA | – | 1 / 2 | 0 / 0 / 117 | reorder ~09 Oct 2026 | 2% | – |
| 4300026534 DEMISTER PAD,DWG.220-4907,FOR CL-1290 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300024953 DEMISTER PAD,DWG.659-9695,FOR CL-159 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300067063 DEMISTER PAD,DWG.246-2257,FOR CL-933 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100097655 DEMISTER PAD,MODEL TE811,MONEL | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300058167 DEMISTER PAD,DWG.932-2525,FOR CL-1481 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300059824 DEMISTER PAD,DWG.781-6773,FOR CL-454 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300025565 SLEEVE,SHAFT,DWG.715-2241,FOR PP-1892C | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100065331 GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL | B | Reduce | Excess | 4 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 4.2M |
| 4200010179 FAN,COOLING MOTOR,DWG.598-6022,FOR KC-36 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011542 FAN,COOLING MOTOR,DWG.141-9712,FOR KC-62 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4100002399 BEARING,ROLLER,CYL,1ROW,6219-2Z | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4200006499 FAN,COOLING MOTOR,SIZE XK244,PTFE | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4100018351 GASKET,SW,3/4IN,600#,GR/304 | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 4 | reorder ~31 Jan 2033 | 0% | – |
| 4100076106 CERAMIC FIBER,BLANKET,50T,128KG/M3,1430C | A | Monitor | Critical insurance spare | 2 RL | – | 0 / 0 | 3 / 3 / 5 | – | 0% | – |
| 4100098864 SCREW,TAPPING,M5X10MM,CS ZN | A | Reduce | Slow-moving | 13,587 EA | – | 139 / 370 | 2,565 / 3,000 / 10,952 | – | 0% | −Rp 4.1M |
| 4300030842 TRIM SET,CONTROL VALVE,DWG.327-2333,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4200005211 LAMP,LED,50W,220VAC,FLOOD | A | Reduce | Non-moving | 12 EA | – | 5 / 14 | 0 / 0 / 2 | – | 0% | −Rp 4.0M |
| 4300046165 COUPLING,DWG.639-4437,FOR PP-1869 | C | Reduce | Slow-moving | 2 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 4.0M |
| 4100034258 FLANGE,SO,1IN,600#,SS316,RF | B | Reduce | Slow-moving | 32 EA | – | 1 / 3 | 0 / 0 / 6 | – | 0% | −Rp 4.0M |
| 4100061486 THERMOCOUPLE,K-1ELMNT,6.4X1400LG | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 2 / 2 / 3 | – | 0% | – |
| 4100030557 ELBOW,90DEG,2IN,SCH80,A105,BW | C | Reduce | Potentially obsolete | 18 EA | – | 10 / 23 | don't stock | – | 0% | −Rp 4.0M |
| 4100003564 BEARING,BALL,1ROW,DEEP GROOVE,6318 C3 | S | Reduce | Potentially obsolete | 1 EA | 2 | 1 / 2 | don't stock | – | 0% | −Rp 4.0M |
| 4100080809Long-lead BEARING,JOURNAL,TYPE PW729,SS304 | A | Maintain | Healthy | 2 SET | 4 | 1 / 2 | 3 / 5 / 6 | – | 0% | – |
| 4100021314 O-RING,EPDM,92MM ID,2.5MM CS | S | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 3 | – | 2% | – |
| 4100084315 BEARING,THRUST PAD,MODEL XR42,PTFE | A | Monitor | Slow-moving | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100092863 GREASE,LITHIUM,NLGI 2,1KG | A | Reduce | Non-moving | 22 KG | – | 10 / 27 | don't stock | – | 0% | −Rp 3.9M |
| 4100093270 GREASE,POLYUREA,NLGI 3,1KG | C | Reduce | Potentially obsolete | 22 KG | – | 10 / 32 | don't stock | – | 0% | −Rp 3.9M |
| 4100053222 SOLENOID VALVE,SIZE BM442,PTFE | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300063402 SLEEVE,SHAFT,DWG.251-5452,FOR PP-743D | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300066136 THERMOWELL,DWG.794-8125,FOR BF-104-COIL0 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100042519 TUBING,SIZE XE564,CS | S | Monitor | No stock needed | 0 M | – | 4 / 10 | don't stock | – | 2% | – |
| 4300060072 IMPELLER,DWG.572-8405,FOR PP-1033 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300018438 IMPELLER,DWG.671-5251,FOR PP-1541 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300053146 IMPELLER,DWG.462-5992,FOR PP-1575A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100007175 IMPELLER,MODEL BZ614,INCOLOY | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300028842 IMPELLER,DWG.403-7730,FOR PP-1797 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300055009 IMPELLER,DWG.160-5816,FOR PP-1909A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100007833 IMPELLER,TYPE WZ326,SS304 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300018656 IMPELLER,DWG.690-5411,FOR PP-535A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300009219 IMPELLER,DWG.116-7832,FOR PP-638A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300025701 IMPELLER,DWG.543-4390,FOR PP-640A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300010251 IMPELLER,DWG.430-8732,FOR PP-641A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300065449 IMPELLER,DWG.840-9715,FOR PP-645C | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300045661 IMPELLER,DWG.562-4664,FOR PP-679C | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300060515 IMPELLER,DWG.997-7745,FOR PP-697A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |