Sparely
DU

Material List

One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.

Clear filters

7,481 spare parts

Order value Rp 123.8B · excess value Rp 5.62T · page 113 of 150

PartCrit.ActionHealthStockOn orderToday Min / MaxRec. SS / Min / MaxOrderStockout riskValue
4300017051
BEARING,JOURNAL,DWG.705-1272,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017056
BEARING,JOURNAL,DWG.307-5284,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017130
BEARING,JOURNAL,DWG.617-4892,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017195
BEARING,THRUST PAD,DWG.303-8822,FOR KT-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017235
BEARING,JOURNAL,DWG.261-8391,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017454
BEARING,JOURNAL,DWG.970-3116,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017498
BEARING,THRUST PAD,DWG.783-2395,FOR KT-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100083501
BEARING,THRUST PAD,MODEL GZ186,SS304
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017761
BEARING,JOURNAL,DWG.561-1549,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017934
BEARING,THRUST PAD,DWG.961-5752,FOR KT-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300017981
BEARING,THRUST PAD,DWG.426-4592,FOR KT-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300018075
BEARING,THRUST PAD,DWG.993-1188,FOR KT-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300018213
BEARING,JOURNAL,DWG.712-8894,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100083011
BEARING,THRUST PAD,TYPE BL452,NBR
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300018240
BEARING,JOURNAL,DWG.430-8970,FOR KT-264A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100082011
BEARING,JOURNAL,TYPE HD170,SS316
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100081469
BEARING,JOURNAL,TYPE CS339,VITON
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300032897
BEARING,THRUST PAD,DWG.691-5294,FOR KT-6
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100083942
BEARING,THRUST PAD,MODEL HY516,SS304
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300033364
BEARING,THRUST PAD,DWG.664-7129,FOR KT-6
S
Maintain
No stock needed0 SET–1 / 2don't stock–1%–
4300033434
BEARING,THRUST PAD,DWG.728-4986,FOR KT-6
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300033515
BEARING,THRUST PAD,DWG.538-9465,FOR KT-6
S
Maintain
No stock needed0 SET–2 / 4don't stock–1%–
4300033719
BEARING,THRUST PAD,DWG.244-6152,FOR KT-6
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100061031
THERMOCOUPLE,N-2ELMNT,6.4X3700LG
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4100022041
O-RING,NBR,111MM ID,5.3MM CS
A
Reduce
Slow-moving77 EA–1 / 22 / 2 / 4–0%−Rp 2.9M
4100026210
STUDBOLT,1INX100MM,B16/4
A
Monitor
Critical insurance spare1 EA–1 / 20 / 0 / 27reorder ~26 Jul 20270%–
4300061542
COUPLING,DWG.466-7251,FOR KC-890A
S
Monitor
No stock needed0 SET–0 / 0don't stock–1%–
4100046025
PACKING SET,VALVE,MODEL BX159,A182F11
A
Monitor
Insurance gap0 SET–0 / 00 / 0 / 2–0%–
4100026578
STUDBOLT,1INX60MM,B7/2H
B
Reduce
Slow-moving224 EA–42 / 11272 / 74 / 148–0%−Rp 2.9M
4100065777
GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL
C
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–1%–
4100030691
ELBOW,45DEG,10IN,3000#,A234WPB,BW
C
Reduce
Potentially obsolete13 EA–4 / 9don't stock–0%−Rp 2.9M
4100013020
RING,WEAR,SIZE IB694,PTFE
C
Maintain
No stock needed0 EA–0 / 0don't stock–1%–
4300060090
SLEEVE,SHAFT,DWG.566-7434,FOR PP-1033
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300046007
SLEEVE,SHAFT,DWG.591-3098,FOR PP-1604A
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4100009798
SLEEVE,SHAFT,MODEL LJ658,MONEL
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300041228
SLEEVE,SHAFT,DWG.280-2546,FOR PP-1805A
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300035110
SLEEVE,SHAFT,DWG.652-9712,FOR PP-1977
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4100009887
SLEEVE,SHAFT,SIZE AG829,INCOLOY
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300009116
SLEEVE,SHAFT,DWG.860-6121,FOR PP-638A
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300010266
SLEEVE,SHAFT,DWG.720-6339,FOR PP-641A
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300053669
SLEEVE,SHAFT,DWG.591-5009,FOR PP-795D
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300010006
SLEEVE,SHAFT,DWG.223-9368,FOR PP-891C
A
Monitor
Insurance gap0 EA–3 / 70 / 0 / 1–0%–
4300042188
SLEEVE,SHAFT,DWG.182-1664,FOR PP-956A
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4100002438
BEARING,BALL,1ROW,DEEP GROOVE,6310BDB
A
Reduce
Non-moving6 EA–2 / 62 / 2 / 4–0%−Rp 2.8M
4100001251
BEARING,BALL,ANGULAR,NU315
A
Reduce
Slow-moving5 EA–1 / 32 / 2 / 3–0%−Rp 2.8M
4100005086
BEARING,ROLLER,CYL,1ROW,6310
A
Reduce
Non-moving6 EA–5 / 112 / 2 / 4–0%−Rp 2.8M
4100002325
BEARING,BALL,ANGULAR,NU313 C3
A
Reduce
Non-moving4 EA–1 / 30 / 0 / 2–0%−Rp 2.8M
4100001868
BEARING,ROLLER,CYL,1ROW,6210
B
Reduce
Non-moving4 EA–2 / 60 / 0 / 2–0%−Rp 2.8M
4100003789
BEARING,ROLLER,CYL,1ROW,NU314 C3
A
Reduce
Non-moving4 EA–2 / 50 / 0 / 2–0%−Rp 2.8M
4100002559
BEARING,BALL,ANGULAR,6319 C3
S
Reduce
Slow-moving2 EA–1 / 3don't stock–0%−Rp 2.8M
← PreviousPage 113 / 150Next →