Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 112 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300052114 THERMOWELL,DWG.923-2339,FOR BF-112-DUCT0 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300036741 IMPELLER,DWG.608-2170,FOR PP-1157 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300036758 IMPELLER,DWG.699-1693,FOR PP-1157 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300027680 IMPELLER,DWG.840-1575,FOR PP-118B | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100007852 IMPELLER,TYPE KX150,A105 | B | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4300027714 IMPELLER,DWG.506-9560,FOR PP-118B | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300027731 IMPELLER,DWG.980-4262,FOR PP-118B | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300025498 IMPELLER,DWG.525-7420,FOR PP-128C | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300025499 IMPELLER,DWG.798-2329,FOR PP-128C | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300025512 IMPELLER,DWG.714-9938,FOR PP-128C | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300019007 IMPELLER,DWG.469-4621,FOR PP-1872B | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300071355 IMPELLER,DWG.174-9525,FOR PP-301C | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100007375 IMPELLER,TYPE CR852,VITON | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300069233 IMPELLER,DWG.653-7863,FOR PP-362B | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300035373 IMPELLER,DWG.386-8327,FOR PP-374A | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100008666 IMPELLER,MODEL JL242,SS304 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100021308 O-RING,EPDM,256MM ID,3.5MM CS | S | Reduce | Potentially obsolete | 81 EA | – | 1 / 2 | 0 / 0 / 3 | – | 0% | −Rp 3.1M |
| 4100104353 TAPE,PTFE,19MMX15M | C | Monitor | Slow-moving | 1 RL | – | 1 / 2 | 0 / 0 / 4 | reorder ~16 Sept 2028 | 1% | – |
| 4300025593 THERMOWELL,DWG.866-5161,FOR TEL-389-47A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4200008195Long-lead CABLE,INSTRUMENT,1PR X 0.75MM2,ARMOURED | B | Monitor | Critical insurance spare | 13 M | – | 5 / 15 | 0 / 0 / 50 | reorder ~19 Mar 2039 | 0% | – |
| 4100042229 TUBING,SIZE LS165,PTFE | B | Monitor | Critical insurance spare | 6 M | – | 1 / 3 | 0 / 0 / 50 | reorder ~15 Nov 2029 | 0% | – |
| 4100108222 OIL,LUBRICANT,ISO VG 100,MINERAL,20L | B | Monitor | Critical insurance spare | 4 L | – | 2 / 6 | 0 / 0 / 11 | reorder ~30 Dec 2032 | 0% | – |
| 4100094145 TUBE PLUG,EXCHANGER,MODEL XU734,MONEL | C | Reduce | Potentially obsolete | 7 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 3.0M |
| 4100093981 TUBE PLUG,EXCHANGER,SIZE VH752,CS | A | Reduce | Non-moving | 7 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 3.0M |
| 4100094361 TUBE PLUG,EXCHANGER,TYPE DW550,PTFE | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300023776 SEAT RING,VALVE,DWG.148-8526,FOR FCV-465 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300066829 TRAY VALVE,DWG.792-5721,FOR CL-1833 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4300016108 TRAY VALVE,DWG.516-5049,FOR CL-789 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4300016115 TRAY VALVE,DWG.778-9635,FOR CL-789 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4300065834 TRAY VALVE,DWG.521-3931,FOR CL-816 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4100105310 SCREEN,WIRE,TYPE HB424,A105 | A | Reduce | Non-moving | 11 SHT | – | 2 / 5 | 2 / 2 / 4 | – | 0% | −Rp 3.0M |
| 4100041257 CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316 | C | Reduce | Slow-moving | 25 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 2.9M |
| 4100041285 CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316 | S | Reduce | Potentially obsolete | 24 EA | – | 10 / 26 | don't stock | – | 0% | −Rp 2.9M |
| 4300028117 POSITIONER,VALVE,DWG.984-8172,FOR FCV-19 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300000278 VALVE,GOVERNOR,DWG.336-2904,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300000488 VALVE,GOVERNOR,DWG.303-3064,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300000728 VALVE,GOVERNOR,DWG.688-5839,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300000866 VALVE,GOVERNOR,DWG.325-8337,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300000897 VALVE,GOVERNOR,DWG.757-6104,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4100090443 VALVE,GOVERNOR,TYPE RV440,VITON | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4100090337 VALVE,GOVERNOR,TYPE PP361,A105 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4100090914 VALVE,GOVERNOR,MODEL BC773,A182F11 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300001267 VALVE,GOVERNOR,DWG.684-9710,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300001311 VALVE,GOVERNOR,DWG.534-2017,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300001338 VALVE,GOVERNOR,DWG.888-7989,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300001556 VALVE,GOVERNOR,DWG.232-9264,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300001638 VALVE,GOVERNOR,DWG.797-9819,FOR KT-202 | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4100027322 STUDBOLT,5/8INX45MM,B8M/8M | B | Monitor | Critical insurance spare | 13 EA | – | 10 / 14 | 0 / 0 / 27 | reorder ~06 Feb 2035 | 0% | – |
| 4300006657 SEAT RING,VALVE,DWG.473-1978,FOR FCV-638 | C | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 1% | – |
| 4300016979 BEARING,JOURNAL,DWG.759-6248,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |