Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 111 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300000362 BEARING,JOURNAL,DWG.124-1006,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300000679 BEARING,JOURNAL,DWG.640-3950,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100083333 BEARING,THRUST PAD,TYPE KZ300,PTFE | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300001045 BEARING,THRUST PAD,DWG.919-8589,FOR KT-2 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300001149 BEARING,THRUST PAD,DWG.658-9347,FOR KT-2 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300001232 BEARING,JOURNAL,DWG.851-6006,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100054056Safety-critical SWITCH,LIMIT,TYPE KM477,INCOLOY | A | Monitor | Insurance gap | 0 EA | 1 | 0 / 0 | 0 / 0 / 2 | reorder ~05 Aug 2063 | 0% | – |
| 4100042292 TUBING,SIZE TY925,VITON | C | Reduce | Potentially obsolete | 10 M | – | 4 / 6 | don't stock | – | 0% | −Rp 3.4M |
| 4100028563 PIPE,12IN,STD,P11,SMLS,6M LG | C | Reduce | Potentially obsolete | 2 LG | – | 1 / 3 | don't stock | – | 0% | −Rp 3.4M |
| 4100029379 PIPE,6IN,SCH40,P11,SMLS,6M LG | B | Reduce | Non-moving | 2 LG | – | 1 / 2 | don't stock | – | 0% | −Rp 3.4M |
| 4100028890 PIPE,1IN,STD,CS,SMLS,6M LG | C | Reduce | Potentially obsolete | 2 LG | – | 1 / 3 | don't stock | – | 0% | −Rp 3.4M |
| 4100028525 PIPE,1-1/2IN,STD,SS316,SMLS,6M LG | B | Reduce | Non-moving | 5 LG | – | 4 / 11 | 0 / 0 / 3 | – | 0% | −Rp 3.4M |
| 4300035370 TRIM SET,CONTROL VALVE,DWG.270-8942,FOR | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300037869 TRIM SET,CONTROL VALVE,DWG.889-9497,FOR | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300037911 TRIM SET,CONTROL VALVE,DWG.592-4767,FOR | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100091712 GREASE,POLYUREA,NLGI 2,180KG | A | Monitor | Critical insurance spare | 16 KG | – | 10 / 29 | 0 / 0 / 247 | reorder ~09 Oct 2026 | 0% | – |
| 4300024954 TRAY VALVE,DWG.143-6357,FOR CL-159 | A | Reduce | Non-moving | 42 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 3.4M |
| 4100105543 SCREEN,WIRE,SIZE BW802,SS304 | B | Reduce | Non-moving | 10 SHT | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 3.4M |
| 4100081716Long-lead BEARING,JOURNAL,SIZE RG734,NBR | A | Monitor | Stockout | 0 SET | 2 | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4300042686 SPRING,SAFETY VALVE,DWG.589-4655,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300042993 SPRING,SAFETY VALVE,DWG.845-3107,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300043765 SPRING,SAFETY VALVE,DWG.672-3722,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4100066571 SPRING,SAFETY VALVE,MODEL ZB766,PTFE | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300043871 SPRING,SAFETY VALVE,DWG.996-1507,FOR KT- | S | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300044152 SPRING,SAFETY VALVE,DWG.759-5916,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300044307 SPRING,SAFETY VALVE,DWG.290-7077,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300062078 SPRING,SAFETY VALVE,DWG.656-4268,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300062241 SPRING,SAFETY VALVE,DWG.509-5317,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300062324 SPRING,SAFETY VALVE,DWG.889-5371,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300024246 SEAL,LABYRINTH,DWG.771-5417,FOR KC-373 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300019198 SEAL,LABYRINTH,DWG.475-4765,FOR KC-383A | S | Maintain | No stock needed | 0 SET | – | 4 / 11 | don't stock | – | 2% | – |
| 4300059583 SEAL,LABYRINTH,DWG.625-8500,FOR KC-984C | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100044253 TRIM SET,CONTROL VALVE,TYPE NS177,VITON | B | Maintain | No stock needed | 0 SET | – | 4 / 13 | don't stock | – | 0% | – |
| 4300035693 BEARING,THRUST PAD,DWG.787-1351,FOR KC-4 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100084393 BEARING,THRUST PAD,MODEL KN364,NBR | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100081088 BEARING,JOURNAL,TYPE IG366,SS316 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100083988 BEARING,THRUST PAD,MODEL ZM806,CS | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300016401 BEARING,THRUST PAD,DWG.104-2099,FOR KC-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100108125 OIL,LUBRICANT,ISO VG 46,SYNTHETIC,20L | A | Monitor | Insurance gap | 0 L | – | 2 / 3 | 0 / 0 / 11 | – | 0% | – |
| 4200010481 FAN,COOLING MOTOR,DWG.521-8302,FOR KC-59 | B | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 2 | reorder ~25 Mar 2059 | 0% | – |
| 4200010925 FAN,COOLING MOTOR,DWG.881-3037,FOR KC-88 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4100064297 GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL | A | Reduce | Excess | 9 EA | – | 2 / 4 | 4 / 4 / 8 | – | 0% | −Rp 3.3M |
| 4100027176 STUDBOLT,5/8INX65MM,B16/4 | C | Monitor | Potentially obsolete | 8 EA | – | 3 / 8 | 0 / 0 / 27 | reorder ~05 May 2029 | 1% | – |
| 4100062712 THERMOWELL,TYPE FD416,PTFE | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100044453 TRIM SET,CONTROL VALVE,SIZE AH360,SS304 | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100023811 O-RING,NBR,177MM ID,2.5MM CS | A | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 3 / 3 / 6 | – | 0% | – |
| 4100032787 TEE,1/2IN,SCH40,A105,BW | C | Reduce | Potentially obsolete | 6 EA | – | 3 / 4 | don't stock | – | 0% | −Rp 3.2M |
| 4100031980 TEE,10IN,SCH80,A234WPB,SW | C | Reduce | Potentially obsolete | 6 EA | – | 4 / 8 | don't stock | – | 0% | −Rp 3.2M |
| 4100018630 GASKET,SW,12IN,600#,GRAPHITE | B | Monitor | Insurance gap | 0 EA | – | 10 / 30 | 0 / 0 / 4 | – | 0% | – |
| 4100087764 FILTER ELEMENT,FUEL GAS,3MICRON,P/N FE-8 | S | Monitor | Healthy | 1 EA | – | 1 / 2 | 0 / 0 / 2 | reorder ~25 Apr 2027 | 2% | – |