Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 114 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100002983 BEARING,BALL,1ROW,DEEP GROOVE,7218-2Z | S | Reduce | Potentially obsolete | 2 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 2.8M |
| 4100004799 BEARING,BALL,ANGULAR,6310 C3 | B | Reduce | Non-moving | 4 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 2.8M |
| 4100002823 BEARING,ROLLER,CYL,1ROW,7208-2Z | A | Reduce | Non-moving | 4 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 2.8M |
| 4100040086 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | – |
| 4100032021 TEE,3IN,SCH40,A105,BW | B | Reduce | Excess | 14 EA | 5 | 6 / 17 | 1 / 1 / 2 | – | 0% | −Rp 2.8M |
| 4100077997 BURNER TIP,SIZE KB417,INCOLOY | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100040901 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | B | Reduce | Non-moving | 24 EA | – | 5 / 14 | 0 / 0 / 1 | – | 0% | −Rp 2.8M |
| 4300025652 SEAT RING,VALVE,DWG.216-8644,FOR PCV-114 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300014743 SEAT RING,VALVE,DWG.445-6401,FOR PCV-846 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300053846 BEARING,JOURNAL,DWG.281-8635,FOR KC-371B | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300053980 BEARING,JOURNAL,DWG.618-3875,FOR KC-371B | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300038854 BEARING,JOURNAL,DWG.760-2746,FOR KC-563B | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300038940 BEARING,JOURNAL,DWG.515-8641,FOR KC-563B | B | Maintain | No stock needed | 0 SET | – | 1 / 2 | don't stock | – | 0% | – |
| 4300038982 BEARING,JOURNAL,DWG.611-1397,FOR KC-563B | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300039022 BEARING,JOURNAL,DWG.117-7565,FOR KC-563B | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100033210 FLANGE,BLIND,12IN,600#,A105,RF | B | Reduce | Non-moving | 3 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 2.8M |
| 4100033287 FLANGE,WN,8IN,600#,SS316,RF | C | Reduce | Potentially obsolete | 3 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 2.8M |
| 4100034485 FLANGE,SO,6IN,300#,SS316,RF | B | Reduce | Slow-moving | 9 EA | – | 3 / 9 | 0 / 0 / 6 | – | 0% | −Rp 2.8M |
| 4100047519 DIAPHRAGM,ACTUATOR,SIZE KY61,NBR | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100086983 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-8 | A | Reduce | Non-moving | 3 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 2.8M |
| 4100087306 FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-5 | S | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 1% | −Rp 2.8M |
| 4100086520 FILTER ELEMENT,LUBE OIL,10MICRON,P/N FE- | S | Reduce | Non-moving | 1 EA | – | 1 / 2 | don't stock | – | 2% | −Rp 2.8M |
| 4100035109 VALVE,GATE,1/4IN,300#,CF8,RF | B | Reduce | Slow-moving | 2 EA | 3 | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 2.8M |
| 4100079098 ANCHOR,REFRACTORY,SIZE VH605,NBR | A | Monitor | Critical insurance spare | 1,410 EA | – | 0 / 0 | 1,423 / 1,750 / 2,545 | – | 0% | – |
| 4100024362Safety-criticalSign-off STUDBOLT,5/8INX30MM,B16/4 | A | Reduce | Excess | 571 EA | – | 188 / 503 | 98 / 122 / 459 | – | 0% | −Rp 2.7M |
| 4300073764 TRIM SET,CONTROL VALVE,DWG.996-8598,FOR | C | Monitor | Stockout | 0 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100027474Safety-critical STUDBOLT,3/4INX80MM,B16/4 | A | Monitor | Critical insurance spare | 10 EA | – | 2 / 5 | 0 / 0 / 27 | reorder ~31 Jul 2035 | 0% | – |
| 4100012149 COUPLING,MODEL SW742,MONEL | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300025540 COUPLING,DWG.375-7712,FOR PP-1892C | C | Maintain | No stock needed | 0 SET | – | 3 / 6 | don't stock | – | 1% | – |
| 4100075943 CERAMIC FIBER,BLANKET,25T,128KG/M3,1430C | A | Reduce | Non-moving | 7 RL | – | 5 / 10 | 3 / 3 / 5 | – | 0% | – |
| 4300020106 TRAY VALVE,DWG.661-4133,FOR CL-1165 | S | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100064943 GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 2.7M |
| 4100065509 GAUGE,PRESSURE,0-10KG/CM2,4IN DIAL | B | Reduce | Non-moving | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 2.7M |
| 4100064556 GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL | C | Reduce | Slow-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 2.7M |
| 4100032512 TEE,6IN,SCH80,A105,SW | B | Reduce | Non-moving | 5 EA | – | 5 / 9 | don't stock | – | 0% | −Rp 2.6M |
| 4100030664 ELBOW,90DEG,1/4IN,SCH40,A234WPB,SW | B | Reduce | Non-moving | 17 EA | – | 5 / 13 | 0 / 0 / 5 | – | 0% | −Rp 2.6M |
| 4100030074 ELBOW,90DEG,1/4IN,3000#,SS316,BW | S | Reduce | Potentially obsolete | 12 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 2.6M |
| 4100036655 VALVE,GLOBE,4IN,150#,A216WCB,RF | C | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 2.6M |
| 4100038844 VALVE,NEEDLE,1/2IN NPT,6000PSI,SS316 | B | Reduce | Slow-moving | 4 EA | – | 1 / 3 | 0 / 0 / 3 | – | 0% | – |
| 4100038932 VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316 | C | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 2.6M |
| 4100039346 VALVE,NEEDLE,1/4IN NPT,3000PSI,SS316 | B | Reduce | Non-moving | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 2.6M |
| 4100039270 VALVE,NEEDLE,1/4IN ODT,3000PSI,SS316 | B | Reduce | Non-moving | 1 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 2.6M |
| 4300054736 POSITIONER,VALVE,DWG.367-3367,FOR TCV-15 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100075872 CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C | A | Monitor | Critical insurance spare | 2 RL | – | 1 / 2 | 3 / 3 / 5 | – | 0% | – |
| 4300070956 POSITIONER,VALVE,DWG.162-6846,FOR LCV-63 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300070989 POSITIONER,VALVE,DWG.792-2645,FOR LCV-63 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100015255 GASKET,SHEET,1/2IN,600#,GR/304 | B | Reduce | Non-moving | 16 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | −Rp 2.6M |
| 4100018464 GASKET,RING,2IN,150#,PTFE | B | Reduce | Non-moving | 16 EA | – | 10 / 19 | 0 / 0 / 4 | – | 0% | −Rp 2.6M |
| 4300071325 POSITIONER,VALVE,DWG.798-9482,FOR FCV-17 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100019181 GASKET,SHEET,6IN,150#,GR/304 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | – |