Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 115 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100019318 GASKET,RING,1IN,600#,GRAPHITE | S | Monitor | Potentially obsolete | 1 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~18 Oct 2028 | 1% | – |
| 4300021407 IMPELLER,DWG.309-1170,FOR PP-148A | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300036770 TRIM SET,CONTROL VALVE,DWG.153-4362,FOR | C | Monitor | No stock needed | 0 SET | 2 | 0 / 0 | don't stock | – | 1% | – |
| 4100094104 TUBE PLUG,EXCHANGER,MODEL PY243,GRAPHITE | A | Reduce | Non-moving | 7 EA | – | 2 / 4 | 1 / 1 / 2 | – | 0% | −Rp 2.5M |
| 4100048926 POSITIONER,VALVE,MODEL OQ399,SS316 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100025458 STUDBOLT,7/8INX40MM,B7/2H | S | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~30 Dec 2027 | 1% | – |
| 4200010363 FAN,COOLING MOTOR,DWG.104-5136,FOR PP-11 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 2.5M |
| 4200010881 FAN,COOLING MOTOR,DWG.287-7457,FOR PP-16 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 2.5M |
| 4200006867 FAN,COOLING MOTOR,TYPE MF88,GRAPHITE | S | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 2.5M |
| 4200010401 FAN,COOLING MOTOR,DWG.799-4639,FOR PP-18 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 2.5M |
| 4200009896 FAN,COOLING MOTOR,DWG.207-5038,FOR PP-81 | B | Reduce | Non-moving | 4 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 2.5M |
| 4100061855 THERMOCOUPLE,J-2ELMNT,6.4X800LG | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300017630 VALVE,GOVERNOR,DWG.364-3652,FOR KT-264A | S | Maintain | No stock needed | 0 ASS | – | 1 / 3 | don't stock | – | 1% | – |
| 4100090601 VALVE,GOVERNOR,TYPE NO240,GRAPHITE | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300018124 VALVE,GOVERNOR,DWG.952-6885,FOR KT-264A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300018225 VALVE,GOVERNOR,DWG.682-5281,FOR KT-264A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300018294 VALVE,GOVERNOR,DWG.558-9306,FOR KT-264A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300018371 VALVE,GOVERNOR,DWG.380-7733,FOR KT-264A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300032255 VALVE,GOVERNOR,DWG.677-8043,FOR KT-624A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300032618 VALVE,GOVERNOR,DWG.611-6392,FOR KT-624A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300032847 VALVE,GOVERNOR,DWG.315-2276,FOR KT-624A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4300032874 VALVE,GOVERNOR,DWG.100-9550,FOR KT-624A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4100090617 VALVE,GOVERNOR,SIZE UD754,CS | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4100090460 VALVE,GOVERNOR,SIZE OH301,VITON | S | Maintain | No stock needed | 0 ASS | – | 1 / 2 | don't stock | – | 1% | – |
| 4100101882 ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B | C | Reduce | Slow-moving | 37 CAN | – | 1 / 2 | 0 / 0 / 3 | – | 0% | −Rp 2.5M |
| 4100015694Safety-critical GASKET,RING,1-1/2IN,600#,GR/304 | A | Maintain | Critical insurance spare | 3 EA | – | 2 / 4 | 0 / 0 / 4 | – | 0% | – |
| 4100041134 CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316 | C | Reduce | Potentially obsolete | 20 EA | – | 5 / 8 | don't stock | – | 0% | −Rp 2.5M |
| 4200007390Long-lead FAN,COOLING MOTOR,MODEL FH56,INCOLOY | A | Reduce | Excess | 6 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 2.4M |
| 4200004864 LAMP,LED,36W,220VAC,T8 | B | Reduce | Non-moving | 8 EA | – | 4 / 13 | 0 / 0 / 2 | – | 0% | −Rp 2.4M |
| 4200004818 LAMP,LED,50W,24VDC,E27 | A | Reduce | Non-moving | 8 EA | – | 4 / 9 | 0 / 0 / 2 | – | 0% | −Rp 2.4M |
| 4200005684 LAMP,LED,36W,220VAC,T8 | B | Reduce | Non-moving | 8 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 2.4M |
| 4100030725 ELBOW,90DEG,4IN,3000#,SS316,BW | B | Reduce | Non-moving | 11 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 2.4M |
| 4100030223 ELBOW,90DEG,1-1/2IN,SCH40,A234WPB,BW | C | Reduce | Potentially obsolete | 9 EA | – | 5 / 11 | don't stock | – | 0% | −Rp 2.4M |
| 4100026344 STUDBOLT,7/8INX95MM,B7/2H | B | Monitor | Critical insurance spare | 10 EA | – | 2 / 6 | 0 / 0 / 27 | reorder ~06 Apr 2035 | 0% | – |
| 4100041904 TUBING,SIZE VN866,GRAPHITE | A | Monitor | Critical insurance spare | 6 M | – | 10 / 31 | 0 / 0 / 50 | reorder ~25 Sept 2031 | 0% | – |
| 4100041961 TUBING,TYPE DY348,SS304 | B | Reduce | Non-moving | 7 M | – | 2 / 5 | don't stock | – | 0% | −Rp 2.4M |
| 4100024532 STUDBOLT,3/4INX85MM,B8M/8M | A | Reduce | Excess | 445 EA | – | 155 / 409 | 108 / 123 / 361 | – | 0% | −Rp 2.4M |
| 4200002502 GLAND,CABLE,TYPE VT91,VITON | B | Reduce | Non-moving | 15 EA | – | 10 / 18 | 0 / 0 / 2 | – | 0% | −Rp 2.4M |
| 4100046426 PACKING SET,VALVE,MODEL TU560,PTFE | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100016875 GASKET,SW,10IN,300#,PTFE | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~11 Nov 2037 | 0% | – |
| 4100005648Long-lead SEAL,MECHANICAL,SIZE UU499,NBR | B | Monitor | Slow-moving | 3 SET | – | 1 / 2 | 2 / 2 / 4 | reorder ~05 Oct 2027 | 0% | – |
| 4200001127 TERMINAL,LUG,RING,2X3MM,CRIMP | A | Monitor | Critical insurance spare | 14 EA | – | 3 / 9 | 0 / 0 / 162 | reorder ~18 Nov 2028 | 0% | – |
| 4100023178 O-RING,NBR,104MM ID,5.3MM CS | S | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 3 | – | 1% | – |
| 4100023343 O-RING,NBR,204MM ID,2.5MM CS | S | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 3 | – | 1% | – |
| 4100003005 BEARING,ROLLER,CYL,1ROW,NU306 C3 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4100001982 BEARING,ROLLER,CYL,1ROW,6208BDB | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4100019772 O-RING,EPDM,216MM ID,2.5MM CS | A | Reduce | Slow-moving | 126 EA | – | 1 / 3 | 7 / 7 / 14 | – | 0% | −Rp 2.3M |
| 4100009831 SLEEVE,SHAFT,TYPE HJ646,SS316 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300027701 SLEEVE,SHAFT,DWG.491-1846,FOR PP-118B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300035408 SLEEVE,SHAFT,DWG.628-3585,FOR PP-1216C | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |