Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 116 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300038451 SLEEVE,SHAFT,DWG.585-2331,FOR PP-123 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300038497 SLEEVE,SHAFT,DWG.960-7698,FOR PP-123 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300059085 SLEEVE,SHAFT,DWG.503-5342,FOR PP-1710 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300041620 SLEEVE,SHAFT,DWG.654-2374,FOR PP-1751A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300030952 SLEEVE,SHAFT,DWG.537-1071,FOR PP-1834B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300039456 SLEEVE,SHAFT,DWG.554-3517,FOR PP-306A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300075133 SLEEVE,SHAFT,DWG.362-4373,FOR PP-350A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300009969 SLEEVE,SHAFT,DWG.974-9400,FOR PP-681B | B | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300034499 SLEEVE,SHAFT,DWG.990-3997,FOR PP-731 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300020133 BEARING,JOURNAL,DWG.649-3965,FOR KC-730 | S | Maintain | No stock needed | 0 SET | – | 3 / 5 | don't stock | – | 1% | – |
| 4300064881 BEARING,THRUST PAD,DWG.558-9066,FOR KC-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300065034 BEARING,JOURNAL,DWG.903-8853,FOR KC-830D | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300050992 BEARING,THRUST PAD,DWG.315-4861,FOR KC-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100081843 BEARING,JOURNAL,SIZE PI741,CS | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4200000318 TERMINAL,LUG,FORK,5.5X4MM,CRIMP | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 162 | – | 0% | – |
| 4200002103 GLAND,CABLE,TYPE AS404,CS | C | Reduce | Potentially obsolete | 12 EA | – | 5 / 13 | don't stock | – | 0% | −Rp 2.2M |
| 4100108143 OIL,LUBRICANT,ISO VG 100,MINERAL,20L | S | Reduce | Potentially obsolete | 14 L | – | 2 / 6 | don't stock | – | 0% | −Rp 2.2M |
| 4300016842 SEAT RING,VALVE,DWG.324-5829,FOR FCV-876 | C | Maintain | Healthy | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4200006657 FAN,COOLING MOTOR,MODEL TO536,GRAPHITE | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4100017372 GASKET,SW,1/4IN,300#,GRAPHITE | S | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 4 | – | 1% | – |
| 4300035790 TRIM SET,CONTROL VALVE,DWG.732-3271,FOR | C | Monitor | No stock needed | 0 SET | 5 | 1 / 3 | don't stock | – | 0% | – |
| 4300018785 RING,WEAR,DWG.915-2259,FOR PP-1892B | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100019010 GASKET,SW,10IN,300#,GR/304 | B | Reduce | Non-moving | 14 EA | – | 2 / 6 | 0 / 0 / 4 | – | 0% | −Rp 2.1M |
| 4100106687 SCREEN,WIRE,TYPE VY33,NBR | A | Reduce | Excess | 17 SHT | – | 3 / 9 | 4 / 4 / 7 | – | 0% | −Rp 2.1M |
| 4300045799 TRIM SET,CONTROL VALVE,DWG.344-4133,FOR | A | Maintain | No stock needed | 0 SET | – | 2 / 3 | don't stock | – | 0% | – |
| 4300066891 TRIM SET,CONTROL VALVE,DWG.889-1072,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300074481 TRIM SET,CONTROL VALVE,DWG.284-5225,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100031417 TEE,10IN,3000#,A105,SW | C | Reduce | Potentially obsolete | 4 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 2.1M |
| 4100105481 SCREEN,WIRE,TYPE HM676,SS316 | S | Reduce | Potentially obsolete | 5 SHT | – | 3 / 9 | don't stock | – | 0% | −Rp 2.1M |
| 4100101639 ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-A | C | Reduce | Excess | 190 CAN | – | 45 / 76 | 11 / 16 / 146 | – | 0% | −Rp 2.1M |
| 4300068722 TRIM SET,CONTROL VALVE,DWG.729-1605,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300002650 TRIM SET,CONTROL VALVE,DWG.182-6787,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300058327 TRIM SET,CONTROL VALVE,DWG.272-4525,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300067847 TRIM SET,CONTROL VALVE,DWG.674-7232,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300036476 TRIM SET,CONTROL VALVE,DWG.189-4393,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300046486 TRIM SET,CONTROL VALVE,DWG.603-8359,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300008858 TRIM SET,CONTROL VALVE,DWG.155-1419,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100024100 O-RING,EPDM,8MM ID,5.3MM CS | S | Reduce | Potentially obsolete | 55 EA | – | 1 / 2 | 0 / 0 / 3 | – | 0% | −Rp 2.1M |
| 4100042747 TUBING,MODEL EQ265,INCOLOY | S | Reduce | Potentially obsolete | 6 M | – | 3 / 5 | don't stock | – | 0% | −Rp 2.1M |
| 4100042168 TUBING,SIZE AN939,NBR | B | Reduce | Non-moving | 6 M | – | 5 / 9 | don't stock | – | 0% | −Rp 2.1M |
| 4200001799 GLAND,CABLE,SIZE EA528,GRAPHITE | A | Monitor | Insurance gap | 0 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | – |
| 4100108128 OIL,LUBRICANT,ISO VG 100,MINERAL,20L | A | Monitor | Critical insurance spare | 3 L | – | 2 / 4 | 0 / 0 / 11 | reorder ~10 Jun 2028 | 0% | – |
| 4100089763 VALVE,GOVERNOR,SIZE HU795,A182F11 | A | Monitor | Slow-moving | 2 ASS | 1 | 0 / 0 | 2 / 2 / 3 | – | 0% | – |
| 4100025740 STUDBOLT,5/8INX110MM,B16/4 | A | Monitor | Critical insurance spare | 6 EA | – | 2 / 5 | 0 / 0 / 27 | reorder ~14 Sept 2033 | 0% | – |
| 4100027049 STUDBOLT,1INX105MM,B8M/8M | A | Maintain | Critical insurance spare | 16 EA | – | 5 / 14 | 0 / 0 / 27 | – | 0% | – |
| 4100021424 O-RING,NBR,154MM ID,3.5MM CS | S | Reduce | Potentially obsolete | 51 EA | – | 10 / 28 | don't stock | – | 0% | −Rp 2.0M |
| 4200001719 GLAND,CABLE,SIZE YS645,MONEL | C | Reduce | Potentially obsolete | 13 EA | – | 10 / 21 | 0 / 0 / 2 | – | 0% | −Rp 2.0M |
| 4100091825 GREASE,POLYUREA,NLGI 1,0.4KG | A | Monitor | Critical insurance spare | 4 KG | – | 2 / 5 | 0 / 0 / 98 | reorder ~18 May 2028 | 0% | – |
| 4100030335 ELBOW,90DEG,2IN,3000#,SS316,BW | A | Reduce | Non-moving | 23 EA | – | 10 / 28 | 9 / 9 / 14 | – | 0% | −Rp 2.0M |
| 4100016193 GASKET,SHEET,3/4IN,300#,GR/304 | A | Maintain | Critical insurance spare | 3 EA | – | 1 / 3 | 0 / 0 / 4 | – | 0% | – |