Sparely
DU

Material List

One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.

Clear filters

7,481 spare parts

Order value Rp 123.8B · excess value Rp 5.62T · page 140 of 150

PartCrit.ActionHealthStockOn orderToday Min / MaxRec. SS / Min / MaxOrderStockout riskValue
4300064270
IMPELLER,DWG.457-3927,FOR PP-1516
B
Maintain
Critical insurance spare1 EA–0 / 00 / 0 / 1–0%–
4100059219
TRANSMITTER,TEMP,TYPE IW585,NBR
A
Maintain
Critical insurance spare2 EA–0 / 01 / 1 / 2–0%–
4300045187Safety-critical
SPRING,SAFETY VALVE,DWG.696-3531,FOR PRV
S
Monitor
Slow-moving2 EA–1 / 31 / 1 / 2–0%–
4100002256
BEARING,BALL,1ROW,DEEP GROOVE,6305-2Z
B
Monitor
Slow-moving2 EA–1 / 21 / 1 / 2–0%–
4100043117
TUBING,SIZE GZ578,A182F11
C
Maintain
No stock needed0 M–10 / 21don't stock–0%–
4100004987
BEARING,ROLLER,CYL,1ROW,7213BDB
B
Monitor
Healthy3 EA–1 / 32 / 2 / 4reorder ~12 Jun 20270%–
4200003604
TERMINAL BLOCK,MODEL SJ486,SS304
C
Reduce
Slow-moving4 EA–1 / 31 / 1 / 2–0%−Rp 61,030
4100065186
GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL
C
Monitor
Slow-moving1 EA–1 / 20 / 0 / 1–0%–
4100064687
GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL
A
Maintain
No stock needed0 EA–1 / 2don't stock–0%–
4100099875
BOLT,ANCHOR,SIZE IH828,SS316
A
Reduce
Non-moving7 EA–2 / 62 / 2 / 4–0%−Rp 60,027
4100099944
BOLT,ANCHOR,TYPE PM937,MONEL
C
Reduce
Potentially obsolete5 EA–4 / 120 / 0 / 2–0%−Rp 60,027
4100034828
VALVE,GATE,6IN,150#,CF8,SW
C
Maintain
No stock needed0 EA–5 / 8don't stock–0%–
4100036536
VALVE,GLOBE,3IN,150#,A105,SW
C
Maintain
No stock needed0 EA–1 / 3don't stock–0%–
4300007366
RING,WEAR,DWG.679-6470,FOR PP-251C
A
Maintain
Critical insurance spare1 EA–0 / 00 / 0 / 1–0%–
4300057870
RING,WEAR,DWG.740-8788,FOR PP-412
A
Maintain
Critical insurance spare1 EA–1 / 30 / 0 / 1–0%–
4100107867
OIL,LUBRICANT,ISO VG 150,SYNTHETIC,209L
A
Maintain
Critical insurance spare20 L–10 / 2111 / 11 / 22–0%–
4100056753
TRANSMITTER,PRESS,TYPE RN411,SS304
S
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4100026276
STUDBOLT,1/2INX75MM,B16/4
S
Maintain
No stock needed0 EA–1 / 3don't stock–0%–
4100017548
GASKET,RING,1IN,150#,GR/304
A
Monitor
Critical insurance spare5 EA–3 / 54 / 4 / 8reorder ~24 Mar 20290%–
4100035835
VALVE,GATE,1/2IN,150#,A216WCB,SW
C
Monitor
Slow-moving2 EA41 / 20 / 0 / 2–0%–
4100038580
VALVE,NEEDLE,1/4IN ODT,3000PSI,SS316
S
Maintain
Healthy2 EA–1 / 30 / 0 / 2–0%–
4100103558
TAPE,PTFE,25MMX15M
B
Monitor
Critical insurance spare1 RL–1 / 20 / 0 / 4reorder ~13 Mar 23320%–
4100019402Safety-critical
O-RING,VITON,263MM ID,2.5MM CS
A
Monitor
Healthy48 EA–18 / 5331 / 41 / 133reorder ~29 Oct 20260%–
4100104375
TAPE,PTFE,19MMX10M
C
Reduce
Potentially obsolete4 RL–3 / 7don't stock–0%−Rp 52,388
4100104480
TAPE,PTFE,12MMX10M
C
Reduce
Potentially obsolete4 RL–3 / 8don't stock–0%−Rp 52,388
4100062968
THERMOWELL,TYPE BC619,VITON
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300074948
THERMOWELL,DWG.138-8589,FOR TEL-129
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300066509
THERMOWELL,DWG.223-5008,FOR TEL-1477-5B
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300021333
THERMOWELL,DWG.521-3955,FOR TEL-1530
C
Maintain
No stock needed0 EA–4 / 7don't stock–0%–
4300056991
THERMOWELL,DWG.921-2249,FOR TEL-1635
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300057887
THERMOWELL,DWG.618-1622,FOR TEL-1683
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300046912
THERMOWELL,DWG.299-6176,FOR TEL-1741
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300026202
THERMOWELL,DWG.204-4407,FOR TEL-208-2A
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300073696
THERMOWELL,DWG.924-3461,FOR TEL-236
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300068392
THERMOWELL,DWG.734-7388,FOR TEL-387A
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300068393
THERMOWELL,DWG.930-1887,FOR TEL-387A
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4100063156
THERMOWELL,TYPE VQ368,NBR
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300028072
THERMOWELL,DWG.155-7988,FOR TEL-504A
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4100063347
THERMOWELL,TYPE EZ68,INCOLOY
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300055730
THERMOWELL,DWG.190-9148,FOR TEL-568
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300060723
THERMOWELL,DWG.562-1551,FOR TEL-583
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300072847
THERMOWELL,DWG.164-2569,FOR TEL-680
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300050132
THERMOWELL,DWG.239-8663,FOR TEL-685
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4100063570
THERMOWELL,TYPE AV509,A182F11
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300027421
RING,WEAR,DWG.481-6168,FOR PP-1348
C
Maintain
Potentially obsolete1 EA–0 / 00 / 0 / 1–0%–
4100020415
O-RING,NBR,198MM ID,3.5MM CS
B
Reduce
Non-moving9 EA–4 / 123 / 3 / 6–0%−Rp 51,207
4300048842Safety-critical
SPRING,SAFETY VALVE,DWG.719-8377,FOR PRV
A
Monitor
Slow-moving4 EA–1 / 32 / 2 / 4–0%–
4100042879
TUBING,TYPE IM115,A105
S
Maintain
No stock needed0 M–0 / 0don't stock–0%–
4100040530
CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316
C
Maintain
No stock needed0 EA–1 / 2don't stock–0%–
4100065171
GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL
B
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
← PreviousPage 140 / 150Next →