Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 139 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100063197 THERMOWELL,MODEL NH268,MONEL | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300066116 THERMOWELL,DWG.997-9915,FOR TEL-281B | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300007289 THERMOWELL,DWG.263-1682,FOR TEL-493 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300050959 THERMOWELL,DWG.640-2402,FOR TEL-735A-14 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300071428 THERMOWELL,DWG.354-6692,FOR TEL-1554A-18 | B | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4300066008 THERMOWELL,DWG.579-3805,FOR TEL-1899B | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100040782 CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316 | A | Reduce | Slow-moving | 3 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 91,730 |
| 4100103734 TAPE,PTFE,19MMX10M | C | Reduce | Potentially obsolete | 11 RL | – | 5 / 11 | 0 / 0 / 4 | – | 0% | −Rp 91,679 |
| 4100005680 SEAL,MECHANICAL,SIZE BD515,A105 | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100023362 O-RING,EPDM,71MM ID,3.5MM CS | A | Monitor | Critical insurance spare | 3 EA | – | 0 / 0 | 3 / 3 / 6 | – | 0% | – |
| 4100049256Long-lead POSITIONER,VALVE,TYPE YX30,CS | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300073767 SEAT RING,VALVE,DWG.439-3099,FOR TCV-140 | C | Monitor | Stockout | 0 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300065192 TRIM SET,CONTROL VALVE,DWG.391-3361,FOR | C | Monitor | No stock needed | 0 SET | 2 | 0 / 0 | don't stock | – | 0% | – |
| 4100095004 TRAY VALVE,SIZE HF497,CS | S | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 84,525 |
| 4100034038 FLANGE,WN,12IN,150#,A105,RF | C | Monitor | Slow-moving | 2 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4100086420Long-lead FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-7 | A | Monitor | Healthy | 2 EA | 4 | 1 / 3 | 5 / 5 / 9 | reorder ~06 Jan 2027 | 0% | – |
| 4100024754Safety-critical STUDBOLT,3/4INX55MM,B8M/8M | A | Monitor | TAM reserve | 31 EA | – | 25 / 68 | 27 / 27 / 54 | reorder ~25 Jun 2027 | 0% | – |
| 4100014324Safety-critical GASKET,RING,4IN,300#,GR/304 | A | Monitor | Stockout | 0 EA | 21 | 0 / 0 | 14 / 17 / 35 | reorder ~16 Nov 2026 | 0% | – |
| 4100029113 PIPE,12IN,SCH40,CS,SMLS,6M LG | C | Monitor | Slow-moving | 2 LG | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4100017916 GASKET,SW,10IN,150#,GRAPHITE | S | Maintain | Potentially obsolete | 4 EA | – | 2 / 4 | 0 / 0 / 4 | – | 0% | – |
| 4100021041 O-RING,VITON,184MM ID,2.5MM CS | A | Monitor | Critical insurance spare | 3 EA | – | 2 / 6 | 3 / 3 / 6 | – | 0% | – |
| 4100054012Safety-critical SWITCH,LIMIT,TYPE HF61,NBR | A | Monitor | Slow-moving | 2 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | – |
| 4300057725 IMPELLER,DWG.643-8678,FOR PP-225A | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100008633 IMPELLER,MODEL GK331,SS316 | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300006716 IMPELLER,DWG.174-3676,FOR PP-779A | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100100411 BOLT,ANCHOR,TYPE AE274,MONEL | A | Reduce | Non-moving | 9 EA | – | 4 / 6 | 3 / 3 / 5 | – | 0% | −Rp 80,036 |
| 4300019729 COUPLING,DWG.127-8202,FOR PP-1399 | B | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100005293 SEAL,MECHANICAL,TYPE QR746,NBR | A | Maintain | Critical insurance spare | 2 SET | – | 1 / 2 | 1 / 1 / 2 | – | 0% | – |
| 4100020710Safety-criticalSign-off O-RING,EPDM,67MM ID,3.5MM CS | A | Reduce | Non-moving | 8 EA | – | 5 / 9 | 3 / 3 / 6 | – | 0% | −Rp 79,368 |
| 4100023473Safety-criticalSign-off O-RING,NBR,140MM ID,2.5MM CS | A | Reduce | Non-moving | 5 EA | – | 4 / 10 | 0 / 0 / 3 | – | 0% | −Rp 79,368 |
| 4100100579 BOLT,ANCHOR,TYPE RV888,A182F11 | A | Monitor | Critical insurance spare | 3 EA | – | 1 / 3 | 3 / 3 / 5 | – | 0% | – |
| 4100032142 TEE,2IN,3000#,A105,SW | C | Maintain | No stock needed | 0 EA | – | 5 / 10 | don't stock | – | 0% | – |
| 4100103607 TAPE,PTFE,19MMX15M | C | Reduce | Potentially obsolete | 6 RL | – | 5 / 8 | don't stock | – | 0% | – |
| 4100104130 TAPE,PTFE,12MMX10M | C | Reduce | Potentially obsolete | 6 RL | – | 2 / 3 | don't stock | – | 0% | −Rp 78,582 |
| 4100104014 TAPE,PTFE,19MMX15M | C | Reduce | Potentially obsolete | 6 RL | – | 4 / 6 | don't stock | – | 0% | – |
| 4100102102 ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-A | B | Reduce | Non-moving | 1 CAN | – | 1 / 2 | don't stock | – | 0% | −Rp 72,991 |
| 4100102669 ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-A | C | Reduce | Potentially obsolete | 1 CAN | – | 2 / 4 | don't stock | – | 0% | −Rp 72,991 |
| 4100103127 ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-B | C | Reduce | Potentially obsolete | 1 CAN | – | 3 / 5 | don't stock | – | 0% | −Rp 72,991 |
| 4300005515 BEARING,THRUST PAD,DWG.621-1130,FOR KT-4 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300005640 BEARING,THRUST PAD,DWG.740-7986,FOR KT-4 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300005968 BEARING,JOURNAL,DWG.347-3158,FOR KT-460B | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300048909 COUPLING,DWG.761-8312,FOR PP-166A | A | Maintain | Healthy | 2 SET | – | 1 / 3 | 1 / 1 / 2 | – | 0% | – |
| 4100000410 BEARING,BALL,1ROW,DEEP GROOVE,6312 | A | Monitor | Healthy | 3 EA | 7 | 1 / 2 | 7 / 8 / 22 | reorder ~25 Nov 2026 | 0% | – |
| 4200002929 TERMINAL BLOCK,MODEL WC326,A182F11 | B | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 67,918 |
| 4100017932 GASKET,RING,4IN,600#,GRAPHITE | A | Reduce | Slow-moving | 6 EA | – | 1 / 3 | 2 / 2 / 4 | – | 0% | −Rp 67,812 |
| 4100058795 TRANSMITTER,DIFF.PRESS,0~5000MMH2O,FF | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100041668 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | C | Maintain | Healthy | 3 EA | – | 1 / 3 | 0 / 0 / 3 | – | 0% | – |
| 4300053274 BEARING,JOURNAL,DWG.541-6563,FOR KC-222B | A | Maintain | Critical insurance spare | 1 SET | – | 5 / 9 | 0 / 0 / 1 | – | 0% | – |
| 4300053296 BEARING,THRUST PAD,DWG.873-7131,FOR KC-2 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300044425 BEARING,THRUST PAD,DWG.327-9236,FOR KC-7 | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |