Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 138 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100014858 GASKET,SHEET,1IN,600#,GR/304 | A | Monitor | Healthy | 10 EA | – | 3 / 7 | 9 / 9 / 18 | reorder ~12 Nov 2026 | 0% | – |
| 4100060267 TRANSMITTER,TEMP,MODEL NR834,GRAPHITE | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100040353 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | Reduce | Slow-moving | 4 EA | 2 | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 130,013 |
| 4300016766Safety-critical NOZZLE,SAFETY VALVE,DWG.232-2679,FOR PRV | S | Maintain | Healthy | 4 EA | – | 1 / 2 | 2 / 2 / 4 | – | 0% | – |
| 4100055900 TRANSMITTER,PRESS,TYPE ZB970,CS | C | Maintain | No stock needed | 0 EA | – | 3 / 8 | don't stock | – | 0% | – |
| 4100027966 PIPE,1/4IN,STD,CS,SMLS,6M LG | A | Monitor | Healthy | 9 LG | 7 | 5 / 13 | 11 / 13 / 26 | reorder ~05 Nov 2026 | 0% | – |
| 4300074818 COUPLING,DWG.191-1949,FOR KC-853D | B | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300064364 SLEEVE,SHAFT,DWG.523-4386,FOR PP-1194 | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100041262 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | B | Reduce | Non-moving | 2 EA | – | 10 / 30 | 0 / 0 / 1 | – | 0% | −Rp 122,853 |
| 4100052493Safety-critical SOLENOID VALVE,SIZE KJ979,NBR | A | Maintain | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100017434 GASKET,RING,1/4IN,300#,PTFE | A | Monitor | Critical insurance spare | 5 EA | – | 3 / 9 | 4 / 4 / 8 | reorder ~04 Jun 2028 | 0% | – |
| 4100101355 BOLT,ANCHOR,MODEL MH672,INCOLOY | C | Reduce | Potentially obsolete | 8 EA | – | 5 / 10 | 0 / 0 / 2 | – | 0% | −Rp 120,054 |
| 4300033820 TRIM SET,CONTROL VALVE,DWG.159-3988,FOR | B | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100023281 O-RING,VITON,225MM ID,3.5MM CS | S | Reduce | Potentially obsolete | 6 EA | – | 1 / 3 | 0 / 0 / 3 | – | 0% | −Rp 119,052 |
| 4100061714Long-lead THERMOCOUPLE,K-1ELMNT,6.4X600LG | A | Monitor | Slow-moving | 4 EA | 3 | 0 / 0 | 4 / 4 / 6 | – | 0% | – |
| 4100020323Safety-critical O-RING,EPDM,176MM ID,5.3MM CS | A | Maintain | Critical insurance spare | 5 EA | – | 2 / 5 | 3 / 3 / 6 | – | 0% | – |
| 4100079034 ANCHOR,REFRACTORY,SIZE OB614,INCOLOY | A | Monitor | Healthy | 2,067 EA | – | 0 / 0 | 1,221 / 1,835 / 2,925 | reorder ~27 Oct 2026 | 0% | – |
| 4100017089 GASKET,RING,10IN,300#,GR/304 | A | Reduce | Excess | 25 EA | – | 0 / 0 | 11 / 11 / 22 | – | 0% | −Rp 115,850 |
| 4300036107 THERMOWELL,DWG.419-2271,FOR TEL-1053 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300058696 THERMOWELL,DWG.307-5378,FOR TEL-1244D | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300048828 THERMOWELL,DWG.957-9435,FOR TEL-139-55A | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300048839 THERMOWELL,DWG.351-6150,FOR TEL-139-55A | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300066017 THERMOWELL,DWG.907-5000,FOR TEL-1589B | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300003029 THERMOWELL,DWG.539-4996,FOR TEL-1989 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300056490 THERMOWELL,DWG.800-5051,FOR TEL-605-3A | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100027515 STUDBOLT,3/4INX30MM,B16/4 | C | Reduce | Potentially obsolete | 3 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 113,421 |
| 4100025806Safety-criticalSign-off STUDBOLT,5/8INX105MM,B7/2H | A | Reduce | Non-moving | 30 EA | – | 5 / 15 | 0 / 0 / 27 | – | 0% | −Rp 113,421 |
| 4100026405 STUDBOLT,7/8INX55MM,B16/4 | C | Reduce | Potentially obsolete | 3 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 113,421 |
| 4100043170 TUBING,TYPE EI53,MONEL | B | Maintain | No stock needed | 0 M | – | 0 / 0 | don't stock | – | 0% | – |
| 4100010806 COUPLING,MODEL WX810,MONEL | A | Monitor | Slow-moving | 4 SET | – | 1 / 3 | 3 / 3 / 5 | reorder ~08 Apr 2027 | 0% | – |
| 4200009182 CABLE,INSTRUMENT,1PR X 0.75MM2,ARMOURED | C | Reduce | Potentially obsolete | 2 M | – | 1 / 3 | don't stock | – | 0% | −Rp 111,244 |
| 4300050074 SLEEVE,SHAFT,DWG.729-5817,FOR PP-392A | C | Maintain | Potentially obsolete | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300003789 VALVE,GOVERNOR,DWG.985-4615,FOR KT-397A | A | Maintain | Critical insurance spare | 1 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300039948 VALVE,GOVERNOR,DWG.467-6578,FOR KT-419A | A | Maintain | Critical insurance spare | 1 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100089934 VALVE,GOVERNOR,TYPE HU871,VITON | A | Maintain | Critical insurance spare | 1 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100090770 VALVE,GOVERNOR,SIZE CM65,NBR | A | Maintain | Critical insurance spare | 1 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100086373 FILTER ELEMENT,FUEL GAS,10MICRON,P/N FE- | A | Monitor | Healthy | 9 EA | – | 3 / 7 | 5 / 7 / 14 | reorder ~12 Nov 2026 | 0% | – |
| 4100045309Safety-criticalLong-lead PACKING SET,VALVE,MODEL QP756,SS316 | A | Monitor | Healthy | 7 SET | – | 0 / 0 | 6 / 6 / 8 | reorder ~03 Apr 2027 | 0% | – |
| 4100103691 TAPE,PTFE,19MMX10M | C | Reduce | Potentially obsolete | 4 RL | 2 | 2 / 5 | don't stock | – | 0% | −Rp 105,266 |
| 4100045896 PACKING SET,VALVE,SIZE BI439,INCOLOY | A | Maintain | Critical insurance spare | 2 SET | – | 2 / 6 | 0 / 0 / 2 | – | 0% | – |
| 4100063316 THERMOWELL,MODEL ZE32,NBR | C | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4100078422Long-lead BURNER TIP,TYPE JD686,SS304 | A | Maintain | Critical insurance spare | 4 EA | – | 1 / 3 | 3 / 3 / 4 | – | 0% | – |
| 4100064350 GAUGE,PRESSURE,0-16KG/CM2,6IN DIAL | B | Monitor | Stockout | 0 EA | 9 | 1 / 2 | 4 / 4 / 8 | – | 0% | – |
| 4300074689 BEARING,THRUST PAD,DWG.618-9472,FOR KC-2 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100083764 BEARING,THRUST PAD,TYPE VZ657,PTFE | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100075924 CERAMIC FIBER,BLANKET,25T,128KG/M3,1260C | A | Monitor | Critical insurance spare | 4 RL | – | 1 / 2 | 4 / 4 / 6 | – | 0% | – |
| 4100025621 STUDBOLT,1/2INX30MM,B16/4 | A | Monitor | Healthy | 53 EA | – | 48 / 81 | 43 / 44 / 84 | reorder ~23 Dec 2026 | 0% | – |
| 4300015514 COUPLING,DWG.138-3037,FOR KC-396 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300015399 THERMOWELL,DWG.509-2526,FOR TEL-1090 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300010177 THERMOWELL,DWG.428-5784,FOR TEL-1399 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |