Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 137 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300013168 SEAL,LABYRINTH,DWG.531-1797,FOR KT-308B | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100094926 TRAY VALVE,TYPE RT293,CS | S | Reduce | Potentially obsolete | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 169,050 |
| 4100095556 TRAY VALVE,MODEL WY411,SS304 | A | Reduce | Non-moving | 4 EA | – | 3 / 4 | 1 / 1 / 2 | – | 0% | −Rp 169,050 |
| 4100062449 THERMOCOUPLE,N-2ELMNT,8X3700LG | A | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4100040116 CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316 | A | Reduce | Excess | 10 EA | – | 2 / 6 | 4 / 4 / 8 | – | 0% | −Rp 168,209 |
| 4300046849 POSITIONER,VALVE,DWG.401-9334,FOR PCV-64 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100107277 OIL,LUBRICANT,ISO VG 100,MINERAL,209L | A | Monitor | Critical insurance spare | 12 L | – | 2 / 5 | 11 / 11 / 22 | reorder ~29 Jan 2027 | 0% | – |
| 4200004915 LAMP,LED,18W,24VDC,E27 | C | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300045717Long-lead IMPELLER,DWG.778-1410,FOR PP-679C | A | Monitor | Stockout | 0 EA | 2 | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4300010213 IMPELLER,DWG.576-5986,FOR PP-278 | A | Maintain | Healthy | 4 EA | – | 0 / 0 | 3 / 3 / 4 | – | 0% | – |
| 4300052638Long-lead TRIM SET,CONTROL VALVE,DWG.453-2598,FOR | B | Monitor | Slow-moving | 3 SET | – | 0 / 0 | 2 / 2 / 3 | – | 0% | – |
| 4100050707 SEAT RING,VALVE,TYPE JM259,NBR | C | Monitor | Slow-moving | 1 EA | 1 | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100026524 STUDBOLT,3/4INX75MM,B7/2H | B | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 27 | reorder ~07 Mar 2050 | 0% | – |
| 4100020556 O-RING,VITON,140MM ID,5.3MM CS | B | Reduce | Non-moving | 10 EA | – | 2 / 4 | 3 / 3 / 6 | – | 0% | −Rp 158,736 |
| 4100023259Safety-criticalSign-off O-RING,VITON,80MM ID,3.5MM CS | S | Reduce | Non-moving | 7 EA | – | 4 / 9 | 0 / 0 / 3 | – | 0% | −Rp 158,736 |
| 4100000990 BEARING,BALL,1ROW,DEEP GROOVE,NU308-2Z | A | Monitor | Critical insurance spare | 2 EA | – | 2 / 3 | 2 / 2 / 4 | – | 0% | – |
| 4100108385 OIL,LUBRICANT,ISO VG 150,SYNTHETIC,5L | A | Reduce | Non-moving | 12 L | – | 10 / 23 | 0 / 0 / 11 | – | 0% | −Rp 157,448 |
| 4100107444 OIL,LUBRICANT,ISO VG 46,MINERAL,5L | A | Reduce | Non-moving | 12 L | – | 5 / 15 | 0 / 0 / 11 | – | 0% | – |
| 4100107747 OIL,LUBRICANT,ISO VG 100,SYNTHETIC,1L | A | Monitor | Critical insurance spare | 11 L | – | 4 / 7 | 11 / 11 / 22 | – | 0% | – |
| 4200006508Long-lead FAN,COOLING MOTOR,TYPE MT764,NBR | B | Monitor | Slow-moving | 4 EA | 1 | 1 / 2 | 4 / 4 / 6 | reorder ~11 Sept 2027 | 0% | – |
| 4100042617 TUBING,TYPE DO118,MONEL | C | Maintain | No stock needed | 0 M | – | 0 / 0 | don't stock | – | 0% | – |
| 4100038539 VALVE,NEEDLE,3/4IN NPT,3000PSI,SS316 | B | Maintain | Healthy | 2 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | – |
| 4100026425 STUDBOLT,7/8INX105MM,B16/4 | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 151,228 |
| 4100056497 TRANSMITTER,PRESS,TYPE JL186,NBR | A | Monitor | Slow-moving | 4 EA | – | 1 / 3 | 2 / 2 / 4 | – | 0% | – |
| 4300019082 TRIM SET,CONTROL VALVE,DWG.740-6302,FOR | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | – |
| 4300063980 TRIM SET,CONTROL VALVE,DWG.959-6840,FOR | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100084133 BEARING,THRUST PAD,SIZE OR155,SS304 | A | Maintain | Critical insurance spare | 1 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | – |
| 4300003927 BEARING,JOURNAL,DWG.329-2323,FOR KT-397A | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300004124 BEARING,THRUST PAD,DWG.956-8927,FOR KT-3 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300004526 BEARING,JOURNAL,DWG.386-7318,FOR KT-397A | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300004787 BEARING,THRUST PAD,DWG.254-5809,FOR KT-3 | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300039466 BEARING,THRUST PAD,DWG.594-7418,FOR KT-4 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300040279 BEARING,JOURNAL,DWG.162-1587,FOR KT-419A | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300022309 BEARING,THRUST PAD,DWG.752-7815,FOR KT-8 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300023050 BEARING,THRUST PAD,DWG.449-3713,FOR KT-8 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300023104 BEARING,THRUST PAD,DWG.562-9073,FOR KT-8 | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100058529 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100102339 ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-B | C | Reduce | Potentially obsolete | 2 CAN | – | 1 / 3 | don't stock | – | 0% | −Rp 145,981 |
| 4300012311 SEAT RING,VALVE,DWG.278-7421,FOR FCV-135 | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100061915 THERMOCOUPLE,N-1ELMNT,8X3800LG | S | Maintain | Healthy | 2 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4300059312Long-lead IMPELLER,DWG.588-3536,FOR PP-413 | B | Monitor | Slow-moving | 2 EA | 2 | 0 / 0 | 2 / 2 / 3 | – | 0% | – |
| 4300013460 SPRING,SAFETY VALVE,DWG.927-5421,FOR KT- | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300013874 SPRING,SAFETY VALVE,DWG.347-2670,FOR KT- | A | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100065405 GAUGE,PRESSURE,0-40KG/CM2,4IN DIAL | C | Maintain | Healthy | 2 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | – |
| 4100018570Safety-critical GASKET,RING,6IN,150#,PTFE | C | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~28 Aug 2403 | 0% | – |
| 4300020416 TRIM SET,CONTROL VALVE,DWG.626-2072,FOR | A | Monitor | Slow-moving | 2 SET | – | 1 / 2 | 1 / 1 / 2 | – | 0% | – |
| 4200002511 GLAND,CABLE,TYPE QH454,MONEL | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4100061185 THERMOCOUPLE,J-1ELMNT,6.4X2700LG | B | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4100075190 CASTABLE,REFRACTORY,DENSE,1700DEG C | S | Reduce | Potentially obsolete | 3 KG | – | 2 / 5 | don't stock | – | 2% | −Rp 131,519 |
| 4100015184Safety-critical GASKET,RING,3IN,600#,PTFE | A | Monitor | Critical insurance spare | 5 EA | – | 5 / 9 | 4 / 4 / 8 | reorder ~01 Jul 2027 | 0% | – |