Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 136 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100101976 ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-A | C | Reduce | Potentially obsolete | 3 CAN | – | 2 / 3 | don't stock | – | 0% | −Rp 218,972 |
| 4100102961 ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-B | C | Reduce | Potentially obsolete | 3 CAN | – | 2 / 6 | don't stock | – | 0% | −Rp 218,972 |
| 4100103339 ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-A | C | Reduce | Potentially obsolete | 3 CAN | – | 2 / 6 | don't stock | – | 0% | −Rp 218,972 |
| 4100058151Long-lead TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF | A | Monitor | Slow-moving | 1 EA | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4100098169 SCREW,TAPPING,M3X16MM,SS304 | A | Reduce | Excess | 4,748 EA | – | 1,610 / 3,344 | 595 / 819 / 4,053 | – | 0% | −Rp 109,472 |
| 4100017013 GASKET,SW,1-1/2IN,150#,GRAPHITE | B | Reduce | Non-moving | 5 EA | – | 4 / 7 | 0 / 0 / 4 | – | 0% | −Rp 214,454 |
| 4100019267 GASKET,SW,1-1/2IN,600#,PTFE | B | Reduce | Non-moving | 5 EA | – | 3 / 6 | 0 / 0 / 4 | – | 0% | −Rp 214,454 |
| 4100018562Safety-criticalSign-off GASKET,SHEET,12IN,150#,GR/304 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 4 / 4 / 8 | – | 0% | −Rp 214,454 |
| 4100015597 GASKET,RING,1/2IN,600#,GRAPHITE | A | Reduce | Non-moving | 9 EA | – | 5 / 9 | 4 / 4 / 8 | – | 0% | −Rp 214,454 |
| 4100015457 GASKET,SHEET,12IN,600#,GR/304 | S | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 1% | −Rp 214,454 |
| 4100017081 GASKET,RING,1/4IN,300#,GR/304 | B | Reduce | Non-moving | 5 EA | – | 1 / 2 | 0 / 0 / 4 | – | 0% | −Rp 214,454 |
| 4100016563Safety-criticalSign-off GASKET,SHEET,1/4IN,150#,GRAPHITE | A | Reduce | Non-moving | 5 EA | – | 3 / 4 | 0 / 0 / 4 | – | 0% | −Rp 214,454 |
| 4300009763Long-lead BEARING,THRUST PAD,DWG.826-2243,FOR KC-4 | A | Maintain | Insurance gap | 0 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100079290 ANCHOR,REFRACTORY,MODEL KG751,CS | S | Reduce | Potentially obsolete | 5 EA | – | 3 / 7 | don't stock | – | 7% | −Rp 209,870 |
| 4100079441 ANCHOR,REFRACTORY,MODEL ZL236,MONEL | S | Reduce | Potentially obsolete | 5 EA | – | 4 / 7 | don't stock | – | 7% | −Rp 209,870 |
| 4300000816 SEAL,LABYRINTH,DWG.907-7279,FOR KT-202 | S | Maintain | No stock needed | 0 SET | 1 | 0 / 0 | don't stock | – | 0% | – |
| 4200003666 TERMINAL BLOCK,TYPE YB172,A182F11 | B | Reduce | Non-moving | 4 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 203,754 |
| 4100021574Safety-criticalSign-off O-RING,EPDM,201MM ID,3.5MM CS | B | Reduce | Slow-moving | 19 EA | – | 0 / 0 | 7 / 7 / 14 | – | 0% | −Rp 198,420 |
| 4100021198 O-RING,VITON,30MM ID,2.5MM CS | S | Reduce | Potentially obsolete | 5 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 198,420 |
| 4100022981 O-RING,VITON,288MM ID,2.5MM CS | A | Reduce | Non-moving | 11 EA | – | 0 / 0 | 3 / 3 / 6 | – | 0% | −Rp 198,420 |
| 4100022032 O-RING,NBR,181MM ID,2.5MM CS | S | Reduce | Potentially obsolete | 8 EA | – | 4 / 12 | 0 / 0 / 3 | – | 0% | −Rp 198,420 |
| 4100021875 O-RING,EPDM,46MM ID,5.3MM CS | S | Reduce | Non-moving | 5 EA | – | 3 / 9 | don't stock | – | 0% | −Rp 198,420 |
| 4100021201 O-RING,EPDM,242MM ID,5.3MM CS | S | Reduce | Potentially obsolete | 8 EA | – | 2 / 4 | 0 / 0 / 3 | – | 0% | −Rp 198,420 |
| 4100022520Safety-criticalSign-off O-RING,NBR,145MM ID,2.5MM CS | A | Reduce | Non-moving | 8 EA | – | 4 / 10 | 0 / 0 / 3 | – | 0% | −Rp 198,420 |
| 4300073443 SEAT RING,VALVE,DWG.587-4654,FOR PCV-160 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300064258 SEAT RING,VALVE,DWG.813-6777,FOR PCV-162 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100057903Long-lead TRANSMITTER,DIFF.PRESS,0~5000MMH2O,FF | B | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100014225Safety-criticalSign-off GASKET,SW,8IN,600#,GRAPHITE | A | Reduce | Excess | 99 EA | 18 | 5 / 8 | 22 / 28 / 93 | – | 0% | −Rp 191,637 |
| 4100106580 SCREEN,WIRE,SIZE WP618,INCOLOY | C | Maintain | No stock needed | 0 SHT | – | 0 / 0 | don't stock | – | 0% | – |
| 4100027273 STUDBOLT,7/8INX65MM,B16/4 | C | Reduce | Potentially obsolete | 5 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 189,035 |
| 4100026355 STUDBOLT,3/4INX100MM,B8M/8M | A | Reduce | Non-moving | 32 EA | – | 4 / 13 | 0 / 0 / 27 | – | 0% | −Rp 189,035 |
| 4100027589 STUDBOLT,3/4INX70MM,B16/4 | S | Reduce | Potentially obsolete | 5 EA | – | 2 / 3 | don't stock | – | 2% | −Rp 189,035 |
| 4100076848 CERAMIC FIBER,BLANKET,25T,128KG/M3,1260C | A | Monitor | Critical insurance spare | 4 RL | – | 2 / 3 | 4 / 4 / 7 | – | 0% | – |
| 4200001805 GLAND,CABLE,TYPE VI551,A105 | A | Reduce | Non-moving | 3 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 183,915 |
| 4200002811 GLAND,CABLE,TYPE UH250,A105 | B | Reduce | Non-moving | 3 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 183,915 |
| 4200001922 GLAND,CABLE,TYPE HO35,NBR | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 183,915 |
| 4200002819 GLAND,CABLE,TYPE RU772,NBR | A | Reduce | Non-moving | 3 EA | – | 2 / 3 | 0 / 0 / 2 | – | 0% | −Rp 183,915 |
| 4300046982 THERMOWELL,DWG.392-8672,FOR TEL-847 | C | Monitor | Stockout | 0 EA | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300074434Long-lead TRAY VALVE,DWG.626-9931,FOR CL-1699 | B | Reduce | Non-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 183,381 |
| 4300007280 IMPELLER,DWG.297-4786,FOR PP-1928 | B | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100058994Long-lead TRANSMITTER,TEMP,SIZE WG687,GRAPHITE | A | Monitor | Healthy | 3 EA | 1 | 2 / 6 | 3 / 3 / 5 | reorder ~11 Mar 2027 | 0% | – |
| 4100039535 VALVE,NEEDLE,1/4IN ODT,6000PSI,SS316 | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4100039815 VALVE,NEEDLE,1/4IN ODT,3000PSI,SS316 | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 2 | reorder ~23 May 2581 | 0% | – |
| 4100098420 SCREW,TAPPING,M6X10MM,SS304 | C | Reduce | Slow-moving | 217 EA | – | 11 / 27 | 50 / 50 / 100 | – | 0% | −Rp 179,946 |
| 4300036414Long-lead TRIM SET,CONTROL VALVE,DWG.118-9476,FOR | A | Monitor | Stockout | 0 SET | 3 | 0 / 0 | 2 / 2 / 3 | – | 0% | – |
| 4100073954 CASTABLE,REFRACTORY,DENSE,1700DEG C | C | Reduce | Potentially obsolete | 4 KG | – | 2 / 5 | don't stock | – | 0% | −Rp 175,358 |
| 4100107281 OIL,LUBRICANT,ISO VG 150,MINERAL,1L | A | Monitor | Critical insurance spare | 12 L | – | 5 / 15 | 11 / 11 / 22 | reorder ~01 Dec 2026 | 0% | – |
| 4300026835 DEMISTER PAD,DWG.730-1005,FOR VD-1001 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300026856 DEMISTER PAD,DWG.892-7949,FOR VD-1001 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200008403 CABLE,INSTRUMENT,1PR X 1.5MM2,ARMOURED | C | Reduce | Potentially obsolete | 3 M | – | 1 / 3 | don't stock | – | 0% | −Rp 169,920 |