Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 29 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300032635Sign-off SEAL,LABYRINTH,DWG.282-6870,FOR KT-624A | S | Reduce | Potentially obsolete | 35 SET | – | 5 / 15 | don't stock | – | 0% | −Rp 3.3B |
| 4300029208Sign-off BEARING,THRUST PAD,DWG.417-6532,FOR KC-6 | A | Reduce | Non-moving | 15 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.3B |
| 4300056877Sign-off BEARING,THRUST PAD,DWG.532-3369,FOR KC-8 | S | Reduce | Potentially obsolete | 15 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.3B |
| 4300011281Sign-off BEARING,THRUST PAD,DWG.344-7538,FOR KT-3 | S | Reduce | Potentially obsolete | 15 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.3B |
| 4300064853Sign-off IMPELLER,DWG.124-5999,FOR PP-1628A | B | Reduce | Slow-moving | 35 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | −Rp 3.3B |
| 4300012308 TRIM SET,CONTROL VALVE,DWG.319-7351,FOR | A | ReorderNormal | Slow-moving | 4 SET | – | 0 / 0 | 4 / 4 / 6 | 2 by 01 Oct 2026 | 0% | Rp 157.0M |
| 4100048715Long-leadSign-off POSITIONER,VALVE,TYPE FO338,MONEL | A | Reduce | Slow-moving | 70 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 3.2B |
| 4300035545Sign-off TRIM SET,CONTROL VALVE,DWG.183-5332,FOR | A | Reduce | Slow-moving | 43 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 3.2B |
| 4300028154Sign-off TRIM SET,CONTROL VALVE,DWG.962-2033,FOR | C | Reduce | Potentially obsolete | 41 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.2B |
| 4300022003Sign-off COUPLING,DWG.450-3253,FOR PP-765B | A | Reduce | Non-moving | 375 SET | – | 5 / 10 | 0 / 0 / 1 | – | 0% | −Rp 3.2B |
| 4300056006Sign-off IMPELLER,DWG.347-6219,FOR PP-200A | A | Reduce | Non-moving | 31 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 3.2B |
| 4300073591Sign-off DEMISTER PAD,DWG.280-2955,FOR VD-1963 | A | Reduce | Non-moving | 203 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300017546Sign-off VALVE,GOVERNOR,DWG.570-9126,FOR KT-264A | S | Reduce | Potentially obsolete | 13 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 3.1B |
| 4100090031Sign-off VALVE,GOVERNOR,SIZE NC269,PTFE | A | Reduce | Non-moving | 14 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300024570Sign-off BEARING,THRUST PAD,DWG.898-5992,FOR KC-4 | A | Reduce | Non-moving | 14 SET | – | 4 / 11 | don't stock | – | 0% | −Rp 3.1B |
| 4100081235Sign-off BEARING,JOURNAL,TYPE PF808,A182F11 | A | Reduce | Non-moving | 15 SET | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300056522Sign-off BEARING,JOURNAL,DWG.896-7301,FOR KC-464A | A | Reduce | Non-moving | 15 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300006799Sign-off BEARING,JOURNAL,DWG.890-2933,FOR KC-536A | A | Reduce | Non-moving | 15 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300035990Sign-off BEARING,THRUST PAD,DWG.848-7966,FOR KC-6 | B | Reduce | Non-moving | 14 SET | – | 10 / 18 | don't stock | – | 0% | −Rp 3.1B |
| 4300068161Sign-off BEARING,JOURNAL,DWG.650-6182,FOR KC-713B | A | Reduce | Non-moving | 15 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300044463Sign-off BEARING,THRUST PAD,DWG.614-5796,FOR KC-7 | A | Reduce | Non-moving | 15 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4100082430Sign-off BEARING,JOURNAL,SIZE XV502,A105 | S | Reduce | Potentially obsolete | 14 SET | – | 4 / 9 | don't stock | – | 0% | −Rp 3.1B |
| 4100082363Sign-off BEARING,JOURNAL,TYPE SU655,SS304 | S | Reduce | Non-moving | 14 SET | – | 4 / 10 | don't stock | – | 0% | −Rp 3.1B |
| 4300003870Sign-off BEARING,THRUST PAD,DWG.230-2654,FOR KT-3 | A | Reduce | Non-moving | 15 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300019336Sign-off IMPELLER,DWG.677-8933,FOR PP-739 | A | Reduce | Non-moving | 31 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300005715Sign-off BLADE,ROTOR,DWG.509-5807,FOR KT-460B | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.1B |
| 4300043840Sign-off BLADE,ROTOR,DWG.647-8172,FOR KT-778A | S | Reduce | Slow-moving | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.1B |
| 4100040167 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | TransferNormal | Slow-moving | 1 EA | – | 1 / 2 | 2 / 2 / 4 | transfer 3 from 4100039984 | 0% | – |
| 4100008238Sign-off IMPELLER,TYPE BM127,INCOLOY | C | Reduce | Potentially obsolete | 29 EA | – | 10 / 21 | don't stock | – | 0% | −Rp 3.0B |
| 4100084665Sign-off SEAL,LABYRINTH,TYPE VM833,PTFE | A | Reduce | Non-moving | 33 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 2.9B |
| 4100072203Sign-off FIREBRICK,INSUL,26,76T,114W,230L | S | Reduce | Potentially obsolete | 18,497 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 2.6B |
| 4300014167Sign-off POSITIONER,VALVE,DWG.476-2380,FOR FCV-16 | C | Reduce | Potentially obsolete | 73 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 2.9B |
| 4300029764Sign-off BEARING,JOURNAL,DWG.110-2998,FOR KT-447 | S | Reduce | Potentially obsolete | 12 SET | 1 | 10 / 15 | don't stock | – | 0% | −Rp 2.9B |
| 4300036210Sign-off TRIM SET,CONTROL VALVE,DWG.227-3011,FOR | C | Reduce | Potentially obsolete | 37 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.9B |
| 4100024564 STUDBOLT,5/8INX95MM,B8M/8M | A | ReorderNormal | Below reorder point | 88 EA | – | 34 / 107 | 91 / 105 / 322 | 234 by 01 Oct 2026 | 0% | Rp 16.5M |
| 4300010334Sign-off VALVE,GOVERNOR,DWG.333-4177,FOR KT-383A | S | Reduce | Potentially obsolete | 12 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 2.9B |
| 4300012763Sign-off IMPELLER,DWG.842-8933,FOR PP-1099 | A | Reduce | Non-moving | 29 EA | – | 10 / 31 | 0 / 0 / 1 | – | 0% | −Rp 2.9B |
| 4300031398Sign-off IMPELLER,DWG.266-7623,FOR PP-1886B | B | Reduce | Non-moving | 28 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 2.9B |
| 4300047765 SLEEVE,SHAFT,DWG.261-3468,FOR PP-556A | A | ReorderNormal | Critical insurance spare | 1 EA | – | 0 / 0 | 2 / 2 / 3 | 2 by 01 Oct 2026 | 0% | Rp 16.2M |
| 4300030641Sign-off BEARING,THRUST PAD,DWG.239-9738,FOR KC-2 | S | Reduce | Potentially obsolete | 13 SET | – | 5 / 13 | don't stock | – | 0% | −Rp 2.9B |
| 4100081144Sign-off BEARING,JOURNAL,SIZE FI998,INCOLOY | A | Reduce | Non-moving | 14 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 2.9B |
| 4300052808Sign-off BEARING,THRUST PAD,DWG.406-7854,FOR KC-6 | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.9B |
| 4300068903Sign-off BEARING,THRUST PAD,DWG.936-1861,FOR KC-7 | A | Reduce | Non-moving | 14 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.9B |
| 4300056909Sign-off BEARING,THRUST PAD,DWG.968-9632,FOR KC-8 | S | Reduce | Potentially obsolete | 13 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.9B |
| 4300013543Sign-off BEARING,THRUST PAD,DWG.668-5112,FOR KT-3 | A | Reduce | Non-moving | 14 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.9B |
| 4300013952Sign-off BEARING,THRUST PAD,DWG.267-3385,FOR KT-3 | A | Reduce | Non-moving | 14 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.9B |
| 4300003612Sign-off BEARING,JOURNAL,DWG.729-1068,FOR KT-397A | A | Reduce | Non-moving | 14 SET | – | 10 / 23 | 0 / 0 / 1 | – | 0% | −Rp 2.9B |
| 4100007688 IMPELLER,TYPE QV277,SS304 | A | ReorderNormal | Critical insurance spare | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 102.1M |
| 4100020328 O-RING,EPDM,40MM ID,2.5MM CS | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 2 / 2 / 4 | 3 by 01 Oct 2026 | 0% | Rp 37,602 |
| 4300020892Sign-off TRIM SET,CONTROL VALVE,DWG.631-6001,FOR | S | Reduce | Potentially obsolete | 36 SET | – | 5 / 16 | don't stock | – | 0% | −Rp 2.8B |