Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 28 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300048643Sign-off TRIM SET,CONTROL VALVE,DWG.671-6995,FOR | S | Reduce | Slow-moving | 51 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.0B |
| 4100002015 BEARING,BALL,ANGULAR,6216 C3 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 2 / 2 / 3 | 2 by 01 Oct 2026 | 0% | Rp 10.3M |
| 4100002298 BEARING,BALL,ANGULAR,NU314BDB | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 3 | 3 / 3 / 6 | 4 by 01 Oct 2026 | 0% | Rp 5.7M |
| 4100028115 PIPE,6IN,SCH160,P11,SMLS,6M LG | A | ReorderNormal | Below reorder point | 1 LG | – | 1 / 2 | 2 / 2 / 4 | 3 by 01 Oct 2026 | 0% | Rp 5.1M |
| 4300004230Sign-off BEARING,THRUST PAD,DWG.701-2995,FOR KT-3 | A | Reduce | Non-moving | 19 SET | – | 4 / 12 | 0 / 0 / 1 | – | 0% | −Rp 3.9B |
| 4300062948Sign-off SPRING,SAFETY VALVE,DWG.477-2287,FOR KT- | S | Reduce | Potentially obsolete | 445 EA | – | 5 / 16 | don't stock | – | 0% | −Rp 3.9B |
| 4300067735Sign-off POSITIONER,VALVE,DWG.805-8556,FOR LCV-16 | B | Reduce | Non-moving | 98 EA | – | 3 / 4 | don't stock | – | 0% | −Rp 3.9B |
| 4100043458Long-lead TRIM SET,CONTROL VALVE,MODEL SN32,VITON | A | ReorderNormal | Slow-moving | 2 SET | – | 0 / 0 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 73.0M |
| 4300037262 IMPELLER,DWG.639-4912,FOR PP-1384B | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 102.1M |
| 4100089095Sign-off BLADE,ROTOR,MODEL DP950,MONEL | A | Reduce | Non-moving | 11 SET | – | 4 / 6 | 0 / 0 / 1 | – | 0% | −Rp 3.8B |
| 4300005077Sign-off BLADE,ROTOR,DWG.970-3667,FOR KT-460B | A | Reduce | Non-moving | 11 SET | – | 5 / 14 | 0 / 0 / 1 | – | 0% | −Rp 3.8B |
| 4300069983Sign-off BLADE,ROTOR,DWG.291-2082,FOR KT-513 | A | Reduce | Non-moving | 11 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.8B |
| 4300032198Sign-off BLADE,ROTOR,DWG.272-8118,FOR KT-624A | S | Reduce | Potentially obsolete | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.8B |
| 4100055637Sign-off TRANSMITTER,PRESS,MODEL IC923,MONEL | B | Reduce | Non-moving | 112 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 3.8B |
| 4300059133Long-leadSign-off TRIM SET,CONTROL VALVE,DWG.485-4044,FOR | A | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.8B |
| 4300047824Sign-off IMPELLER,DWG.851-3526,FOR PP-556A | A | Reduce | Non-moving | 37 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 3.8B |
| 4300027890Sign-off BEARING,JOURNAL,DWG.757-1104,FOR KC-486 | S | Reduce | Potentially obsolete | 17 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.7B |
| 4100081443Sign-off BEARING,JOURNAL,MODEL BE971,GRAPHITE | A | Reduce | Non-moving | 18 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.7B |
| 4300036026Sign-off BEARING,THRUST PAD,DWG.826-4146,FOR KC-6 | B | Reduce | Non-moving | 17 SET | – | 10 / 18 | don't stock | – | 0% | −Rp 3.7B |
| 4300031242Sign-off BEARING,THRUST PAD,DWG.473-5815,FOR KC-7 | A | Reduce | Non-moving | 18 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.7B |
| 4300001607Sign-off BEARING,JOURNAL,DWG.550-8434,FOR KT-202 | S | Reduce | Potentially obsolete | 17 SET | – | 4 / 7 | don't stock | – | 0% | −Rp 3.7B |
| 4300004365Sign-off BEARING,THRUST PAD,DWG.485-5151,FOR KT-3 | A | Reduce | Non-moving | 18 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.7B |
| 4100082918Sign-off BEARING,THRUST PAD,TYPE UQ832,INCOLOY | S | Reduce | Potentially obsolete | 17 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.7B |
| 4300062690Sign-off BEARING,JOURNAL,DWG.535-6892,FOR KT-875 | S | Reduce | Potentially obsolete | 17 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.7B |
| 4300062714Sign-off BEARING,JOURNAL,DWG.781-2301,FOR KT-875 | S | Reduce | Potentially obsolete | 17 SET | – | 10 / 30 | don't stock | – | 0% | −Rp 3.7B |
| 4300000428Sign-off BEARING,THRUST PAD,DWG.228-5921,FOR KT-2 | S | Reduce | Potentially obsolete | 24 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 3.7B |
| 4300026171Sign-off IMPELLER,DWG.337-8674,FOR PP-915A | A | Reduce | Non-moving | 37 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.7B |
| 4100059181 TRANSMITTER,TEMP,TYPE QP809,GRAPHITE | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 34.1M |
| 4100057362Sign-off TRANSMITTER,DIFF.PRESS,0~5000MMH2O,HART | A | Reduce | Non-moving | 107 EA | – | 3 / 9 | don't stock | – | 0% | −Rp 3.6B |
| 4100052431Safety-criticalLong-lead SOLENOID VALVE,MODEL KO32,SS316 | B | ReorderNormal | Below reorder point | 3 EA | 2 | 1 / 2 | 5 / 5 / 9 | 4 by 01 Oct 2026 | 0% | Rp 28.9M |
| 4300061782Sign-off TRIM SET,CONTROL VALVE,DWG.145-9633,FOR | C | Reduce | Potentially obsolete | 12 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.6B |
| 4300070656Sign-off SEAL,LABYRINTH,DWG.652-9620,FOR KT-513 | A | Reduce | Non-moving | 39 SET | – | 10 / 16 | 0 / 0 / 1 | – | 0% | −Rp 3.6B |
| 4300066108Sign-off POSITIONER,VALVE,DWG.516-9790,FOR FCV-19 | B | Reduce | Non-moving | 91 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.6B |
| 4100031148 TEE,1-1/2IN,SCH40,A234WPB,SW | B | ReorderNormal | Below reorder point | 25 EA | – | 18 / 26 | 16 / 25 / 78 | 53 by 01 Oct 2026 | 0% | Rp 48.9M |
| 4300002246Sign-off BEARING,JOURNAL,DWG.680-3275,FOR KC-316D | A | Reduce | Non-moving | 17 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 3.5B |
| 4300068875Sign-off BEARING,JOURNAL,DWG.201-4206,FOR KC-732D | A | Reduce | Non-moving | 17 SET | – | 10 / 20 | 0 / 0 / 1 | – | 0% | −Rp 3.5B |
| 4300064968Sign-off BEARING,THRUST PAD,DWG.504-7461,FOR KC-8 | S | Reduce | Potentially obsolete | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.5B |
| 4300013022Sign-off BEARING,JOURNAL,DWG.203-3454,FOR KT-308B | A | Reduce | Non-moving | 17 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.5B |
| 4300029663Sign-off BEARING,THRUST PAD,DWG.487-1448,FOR KT-4 | S | Reduce | Potentially obsolete | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.5B |
| 4300069717Sign-off BEARING,THRUST PAD,DWG.990-1281,FOR KT-5 | A | Reduce | Non-moving | 17 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.5B |
| 4300022560Sign-off BEARING,THRUST PAD,DWG.286-6525,FOR KT-8 | A | Reduce | Non-moving | 17 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 3.5B |
| 4300007459Sign-off SEAL,LABYRINTH,DWG.404-6075,FOR KC-365C | S | Reduce | Potentially obsolete | 37 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.5B |
| 4300062885Sign-off SEAL,LABYRINTH,DWG.490-7684,FOR KT-875 | S | Reduce | Potentially obsolete | 37 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.5B |
| 4100001144Long-lead BEARING,BALL,1ROW,DEEP GROOVE,7217 C3 | A | ReorderNormal | Slow-moving | 3 EA | 2 | 1 / 2 | 6 / 6 / 9 | 4 by 01 Oct 2026 | 0% | Rp 8.5M |
| 4300000588Sign-off BLADE,ROTOR,DWG.125-6512,FOR KT-202 | S | Reduce | Potentially obsolete | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.4B |
| 4300010712Sign-off BLADE,ROTOR,DWG.281-6849,FOR KT-383A | S | Reduce | Potentially obsolete | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.4B |
| 4100089289Sign-off BLADE,ROTOR,SIZE HG564,A182F11 | A | Reduce | Non-moving | 10 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 3.4B |
| 4300061946Sign-off BLADE,ROTOR,DWG.737-6889,FOR KT-875 | S | Reduce | Potentially obsolete | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.4B |
| 4300029714Sign-off SEAL,LABYRINTH,DWG.940-1978,FOR KT-447 | S | Reduce | Potentially obsolete | 36 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 3.4B |
| 4300001342Sign-off VALVE,GOVERNOR,DWG.941-7633,FOR KT-202 | S | Reduce | Potentially obsolete | 14 ASS | – | 3 / 7 | don't stock | – | 0% | −Rp 3.3B |