Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 27 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300065266Sign-off IMPELLER,DWG.823-1814,FOR PP-805B | B | Reduce | Slow-moving | 51 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 5.0B |
| 4300023121Sign-off BLADE,ROTOR,DWG.918-9706,FOR KT-856A | A | Reduce | Non-moving | 14 SET | – | 10 / 16 | 0 / 0 / 1 | – | 0% | −Rp 5.0B |
| 4100057259Long-lead TRANSMITTER,DIFF.PRESS,0~2500MMH2O,HART | A | TransferNormal | Below reorder point | 1 EA | 2 | 1 / 2 | 3 / 3 / 4 | transfer 1 from 4100058397 | 0% | – |
| 4300054714Sign-off TRIM SET,CONTROL VALVE,DWG.348-7722,FOR | A | Reduce | Non-moving | 62 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.9B |
| 4100081597Sign-off BEARING,JOURNAL,MODEL BY769,NBR | A | Reduce | Non-moving | 23 SET | – | 10 / 14 | 0 / 0 / 1 | – | 0% | −Rp 4.8B |
| 4300032036Sign-off BEARING,THRUST PAD,DWG.626-1328,FOR KC-4 | S | Reduce | Potentially obsolete | 22 SET | – | 10 / 30 | don't stock | – | 0% | −Rp 4.8B |
| 4300007929Sign-off BEARING,JOURNAL,DWG.707-2327,FOR KC-527 | A | Reduce | Non-moving | 22 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.8B |
| 4300023548Sign-off BEARING,JOURNAL,DWG.353-4354,FOR KT-856A | A | Reduce | Non-moving | 23 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 4.8B |
| 4300037886Sign-off TRIM SET,CONTROL VALVE,DWG.957-1557,FOR | S | Reduce | Potentially obsolete | 61 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.8B |
| 4100012419 RING,WEAR,MODEL IY331,SS304 | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 3 / 3 / 5 | 3 by 01 Oct 2026 | 0% | Rp 24.6M |
| 4100023627Safety-critical O-RING,EPDM,163MM ID,5.3MM CS | A | ReorderNormal | Critical insurance spare | 1 EA | – | 0 / 0 | 3 / 3 / 6 | 5 by 01 Oct 2026 | 0% | Rp 198,420 |
| 4100070473Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL UT901,A105 | A | Reduce | Non-moving | 232 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.7B |
| 4300044749Sign-off BEARING,THRUST PAD,DWG.205-4131,FOR KC-2 | B | Reduce | Non-moving | 21 SET | – | 10 / 29 | don't stock | – | 0% | −Rp 4.6B |
| 4300044459Sign-off BEARING,JOURNAL,DWG.197-7181,FOR KC-752A | A | Reduce | Non-moving | 22 SET | – | 10 / 31 | 0 / 0 / 1 | – | 0% | −Rp 4.6B |
| 4300004596Sign-off BEARING,JOURNAL,DWG.336-9358,FOR KT-397A | A | Reduce | Non-moving | 22 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 4.6B |
| 4300032183Sign-off BEARING,THRUST PAD,DWG.869-1257,FOR KT-6 | S | Reduce | Potentially obsolete | 21 SET | – | 4 / 10 | don't stock | – | 0% | −Rp 4.6B |
| 4300006420Sign-off POSITIONER,VALVE,DWG.653-5099,FOR TCV-17 | A | Reduce | Excess | 117 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 4.6B |
| 4300003246Sign-off BLADE,ROTOR,DWG.710-9422,FOR KT-397A | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.6B |
| 4300005438Sign-off BLADE,ROTOR,DWG.742-2760,FOR KT-460B | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.6B |
| 4300043665Sign-off BLADE,ROTOR,DWG.501-4910,FOR KT-778A | S | Reduce | Potentially obsolete | 12 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.6B |
| 4100028636 PIPE,8IN,SCH80,P11,SMLS,6M LG | A | ReorderNormal | Slow-moving | 2 LG | – | 1 / 3 | 3 / 3 / 5 | 3 by 01 Oct 2026 | 0% | Rp 1.0M |
| 4100019977 O-RING,EPDM,224MM ID,2.5MM CS | S | ReorderNormal | Below reorder point | 3 EA | – | 1 / 3 | 3 / 3 / 12 | 9 by 01 Oct 2026 | 2% | Rp 885,380 |
| 4100084595Long-leadSign-off SEAL,LABYRINTH,MODEL WQ711,A105 | A | Reduce | Excess | 145 SET | – | 0 / 0 | 10 / 14 / 17 | – | 0% | −Rp 4.5B |
| 4100025085 STUDBOLT,1INX50MM,B16/4 | A | ReorderNormal | Below reorder point | 22 EA | – | 19 / 40 | 39 / 40 / 71 | 49 by 01 Oct 2026 | 0% | Rp 1.9M |
| 4300031952Sign-off BEARING,JOURNAL,DWG.121-1026,FOR KC-458D | S | Reduce | Potentially obsolete | 20 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.4B |
| 4300026675Sign-off BEARING,THRUST PAD,DWG.483-5259,FOR KC-5 | S | Reduce | Slow-moving | 20 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.4B |
| 4300060535Sign-off POSITIONER,VALVE,DWG.978-8170,FOR LCV-10 | C | Reduce | Slow-moving | 131 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 4.4B |
| 4300052345Sign-off POSITIONER,VALVE,DWG.193-4026,FOR TCV-13 | B | Reduce | Non-moving | 109 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 4.4B |
| 4100107659 OIL,LUBRICANT,ISO VG 46,SYNTHETIC,1L | A | ReorderNormal | Critical insurance spare | 5 L | – | 1 / 3 | 11 / 11 / 22 | 17 by 01 Oct 2026 | 0% | Rp 2.7M |
| 4100043988Sign-off TRIM SET,CONTROL VALVE,MODEL LK79,PTFE | C | Reduce | Slow-moving | 57 SET | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 4.3B |
| 4300036472Sign-off TRIM SET,CONTROL VALVE,DWG.200-2256,FOR | A | Reduce | Non-moving | 55 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.3B |
| 4300011047Sign-off BLADE,ROTOR,DWG.282-4319,FOR KT-383A | S | Reduce | Potentially obsolete | 11 SET | – | 3 / 7 | don't stock | – | 0% | −Rp 4.2B |
| 4300040684Sign-off BLADE,ROTOR,DWG.230-4333,FOR KT-419A | A | Reduce | Non-moving | 12 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.2B |
| 4300033651Sign-off BLADE,ROTOR,DWG.493-5242,FOR KT-624A | S | Reduce | Potentially obsolete | 11 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 4.2B |
| 4100083550Sign-off BEARING,THRUST PAD,SIZE FL964,A182F11 | A | Reduce | Non-moving | 21 SET | – | 3 / 9 | 1 / 1 / 2 | – | 0% | −Rp 4.2B |
| 4300025325Sign-off BEARING,JOURNAL,DWG.373-9848,FOR KC-373B | S | Reduce | Potentially obsolete | 19 SET | – | 10 / 20 | don't stock | – | 0% | −Rp 4.2B |
| 4300053549Sign-off BEARING,THRUST PAD,DWG.100-1133,FOR KC-7 | S | Reduce | Potentially obsolete | 19 SET | – | 10 / 19 | don't stock | – | 0% | −Rp 4.2B |
| 4300017407Sign-off BEARING,THRUST PAD,DWG.106-6532,FOR KT-2 | S | Reduce | Non-moving | 19 SET | – | 3 / 9 | don't stock | – | 0% | −Rp 4.2B |
| 4300018356Sign-off BEARING,THRUST PAD,DWG.797-6715,FOR KT-2 | S | Reduce | Non-moving | 19 SET | – | 4 / 8 | don't stock | – | 0% | −Rp 4.2B |
| 4300013270Sign-off BEARING,JOURNAL,DWG.979-8092,FOR KT-308B | A | Reduce | Non-moving | 20 SET | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 4.2B |
| 4300032439Sign-off BEARING,THRUST PAD,DWG.650-7371,FOR KT-6 | S | Reduce | Potentially obsolete | 19 SET | – | 5 / 15 | don't stock | – | 0% | −Rp 4.2B |
| 4100005878Sign-off SEAL,MECHANICAL,MODEL UT536,SS304 | B | Reduce | Non-moving | 44 SET | – | 10 / 18 | don't stock | – | 0% | −Rp 4.2B |
| 4300074419Sign-off TRIM SET,CONTROL VALVE,DWG.354-4660,FOR | C | Reduce | Slow-moving | 55 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 4.2B |
| 4300046124Sign-off POSITIONER,VALVE,DWG.810-2224,FOR FCV-56 | B | Reduce | Non-moving | 104 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 4.2B |
| 4300025790Sign-off TRIM SET,CONTROL VALVE,DWG.327-5029,FOR | C | Reduce | Slow-moving | 42 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.1B |
| 4100060496Sign-off TRANSMITTER,TEMP,TYPE LX481,GRAPHITE | A | Reduce | Non-moving | 122 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 4.1B |
| 4100065755 GAUGE,PRESSURE,0-40KG/CM2,4IN DIAL | C | TransferHigh | Stockout | 0 EA | – | 1 / 2 | 0 / 0 / 1 | transfer 1 from 4100064647 | 1% | – |
| 4100022906 O-RING,VITON,62MM ID,2.5MM CS | B | ReorderNormal | Below reorder point | 10 EA | – | 6 / 16 | 19 / 19 / 30 | 20 by 01 Oct 2026 | 1% | Rp 1.4M |
| 4100056527Sign-off TRANSMITTER,PRESS,SIZE FX922,NBR | B | Reduce | Non-moving | 118 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 4.0B |
| 4100003102 BEARING,ROLLER,CYL,1ROW,7217-2Z | B | ReorderNormal | Below reorder point | 1 EA | – | 1 / 2 | 2 / 2 / 3 | 2 by 01 Oct 2026 | 1% | Rp 2.8M |