Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 51 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300007431 SEAL,LABYRINTH,DWG.582-5065,FOR KC-365C | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 283.8M |
| 4300024201 SEAL,LABYRINTH,DWG.552-8075,FOR KC-373 | S | Reduce | Potentially obsolete | 3 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 283.8M |
| 4300051616 SEAL,LABYRINTH,DWG.680-8716,FOR KC-511C | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 283.8M |
| 4300054237 SEAL,LABYRINTH,DWG.202-4180,FOR KC-513 | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 283.8M |
| 4300054273 SEAL,LABYRINTH,DWG.293-2207,FOR KC-513 | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 283.8M |
| 4300006796 SEAL,LABYRINTH,DWG.281-3778,FOR KC-536A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 283.8M |
| 4300056080 SEAL,LABYRINTH,DWG.882-8382,FOR KC-588 | A | Reduce | Non-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4300001087 SEAL,LABYRINTH,DWG.231-4799,FOR KT-202 | S | Reduce | Potentially obsolete | 3 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 283.8M |
| 4100086053 SEAL,LABYRINTH,SIZE IM814,SS304 | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 283.8M |
| 4300001372 SEAL,LABYRINTH,DWG.547-9590,FOR KT-202 | S | Reduce | Potentially obsolete | 3 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 283.8M |
| 4300001704 SEAL,LABYRINTH,DWG.847-8672,FOR KT-202 | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 283.8M |
| 4300011522 SEAL,LABYRINTH,DWG.195-9060,FOR KT-383A | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 283.8M |
| 4300003151 SEAL,LABYRINTH,DWG.496-4847,FOR KT-397A | A | Reduce | Non-moving | 4 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4300039748 SEAL,LABYRINTH,DWG.816-8880,FOR KT-419A | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4300069490 SEAL,LABYRINTH,DWG.609-8725,FOR KT-513 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4300032611 SEAL,LABYRINTH,DWG.215-7205,FOR KT-624A | S | Reduce | Potentially obsolete | 3 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 283.8M |
| 4300044050 SEAL,LABYRINTH,DWG.876-6578,FOR KT-778A | S | Reduce | Potentially obsolete | 3 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 283.8M |
| 4300022667 SEAL,LABYRINTH,DWG.848-2632,FOR KT-856A | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4100005491 SEAL,MECHANICAL,TYPE WL931,CS | C | Reduce | Slow-moving | 5 SET | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 283.8M |
| 4100006254 SEAL,MECHANICAL,MODEL MN120,PTFE | A | Reduce | Non-moving | 4 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4100006293 SEAL,MECHANICAL,MODEL WY720,VITON | A | Reduce | Non-moving | 5 SET | – | 5 / 11 | 1 / 1 / 2 | – | 0% | −Rp 283.8M |
| 4100005415 SEAL,MECHANICAL,TYPE JE63,GRAPHITE | A | Reduce | Non-moving | 5 SET | – | 5 / 10 | 1 / 1 / 2 | – | 0% | −Rp 283.8M |
| 4100006037 SEAL,MECHANICAL,TYPE DC323,SS316 | A | Reduce | Non-moving | 4 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4100006551 SEAL,MECHANICAL,SIZE UR238,CS | B | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4100066670Safety-criticalSign-off SPRING,SAFETY VALVE,SIZE WL212,INCOLOY | A | Reduce | Non-moving | 34 EA | – | 10 / 17 | 1 / 1 / 2 | – | 0% | −Rp 282.2M |
| 4300037797 SEAT RING,VALVE,DWG.884-3249,FOR PCV-945 | S | Reduce | Potentially obsolete | 25 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 282.0M |
| 4300015079Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,DWG.932-3918,FOR PRV | A | Reduce | Non-moving | 61 EA | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 281.6M |
| 4100066992Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,SIZE JR376,VITON | A | Reduce | Slow-moving | 35 EA | 1 | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 279.9M |
| 4300059129 POSITIONER,VALVE,DWG.348-5562,FOR FCV-88 | A | Reduce | Non-moving | 7 EA | – | 4 / 9 | don't stock | – | 0% | −Rp 279.4M |
| 4300054922 POSITIONER,VALVE,DWG.421-3187,FOR LCV-18 | C | Reduce | Potentially obsolete | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 279.4M |
| 4300052138 POSITIONER,VALVE,DWG.841-2099,FOR LCV-19 | C | Reduce | Potentially obsolete | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 279.4M |
| 4300063368 POSITIONER,VALVE,DWG.380-3758,FOR PCV-14 | A | Reduce | Non-moving | 8 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 279.4M |
| 4300024150 POSITIONER,VALVE,DWG.377-2513,FOR FCV-44 | C | Reduce | Slow-moving | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 279.4M |
| 4100077911 BURNER TIP,SIZE GO605,NBR | C | Reduce | Potentially obsolete | 18 EA | – | 4 / 11 | don't stock | – | 0% | −Rp 278.9M |
| 4300021303 DEMISTER PAD,DWG.966-2648,FOR VD-1232 | A | Reduce | Slow-moving | 20 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 277.7M |
| 4100072283 FIREBRICK,INSUL,23,65T,114W,230L | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 663 / 791 / 1,187 | – | 28% | – |
| 4100079382 ANCHOR,REFRACTORY,SIZE UQ491,MONEL | A | Monitor | Insurance gap | 0 EA | – | 2 / 6 | 937 / 1,050 / 1,519 | – | 28% | – |
| 4100073125 FIREBRICK,INSUL,23,76T,114W,230L | A | Monitor | Critical insurance spare | 6 EA | – | 4 / 9 | 665 / 791 / 1,187 | – | 27% | – |
| 4100059927 TRANSMITTER,TEMP,MODEL FS328,INCOLOY | B | Reduce | Non-moving | 8 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 273.1M |
| 4100033259 FLANGE,WN,12IN,150#,SS316,RF | A | Reduce | Non-moving | 298 EA | – | 3 / 7 | 0 / 0 / 5 | – | 0% | −Rp 271.8M |
| 4100084553 SEAL,LABYRINTH,TYPE UK138,INCOLOY | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 2 / 2 / 3 | – | 27% | – |
| 4300048462 SEAT RING,VALVE,DWG.948-4713,FOR PCV-458 | A | Reduce | Non-moving | 25 EA | – | 5 / 16 | 0 / 0 / 1 | – | 0% | −Rp 270.7M |
| 4300064150 RING,WEAR,DWG.189-1380,FOR PP-958B | B | Reduce | Non-moving | 34 EA | – | 5 / 14 | 0 / 0 / 1 | – | 0% | −Rp 270.1M |
| 4100093593Long-lead TUBE PLUG,EXCHANGER,TYPE PY213,CS | B | ReorderNormal | Slow-moving | 2 EA | – | 1 / 3 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 674,760 |
| 4100038301 VALVE,NEEDLE,1/4IN ODT,6000PSI,SS316 | B | Reduce | Slow-moving | 104 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 268.1M |
| 4300026630Long-lead IMPELLER,DWG.607-3719,FOR PP-1194B | A | Reduce | Slow-moving | 6 EA | 1 | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 267.6M |
| 4100077780 BURNER TIP,TYPE RS889,A105 | A | Monitor | Insurance gap | 0 EA | – | 10 / 26 | 3 / 3 / 4 | – | 27% | – |
| 4100016129Safety-critical GASKET,SW,3/4IN,150#,GRAPHITE | A | ReorderNormal | Critical insurance spare | 4 EA | – | 3 / 5 | 4 / 4 / 8 | 4 by 01 Oct 2026 | 0% | Rp 857,815 |
| 4300000137 COUPLING,DWG.284-8888,FOR PP-841B | B | Reduce | Non-moving | 32 SET | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 265.2M |
| 4300003571 SPRING,SAFETY VALVE,DWG.598-5570,FOR KT- | A | Reduce | Non-moving | 32 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 264.6M |