Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 81 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100025605 STUDBOLT,7/8INX95MM,B16/4 | A | Reduce | Slow-moving | 1,471 EA | – | 26 / 75 | 94 / 96 / 192 | – | 0% | −Rp 28.7M |
| 4100032929 FLANGE,WN,6IN,300#,SS316,RF | B | Reduce | Excess | 50 EA | 59 | 9 / 20 | 13 / 16 / 32 | – | 0% | −Rp 28.6M |
| 4100018782 GASKET,SHEET,2IN,150#,GRAPHITE | A | Reduce | Non-moving | 137 EA | – | 4 / 6 | 0 / 0 / 4 | – | 0% | −Rp 28.5M |
| 4100011201 COUPLING,MODEL ZC845,NBR | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 4% | – |
| 4100086132 FILTER ELEMENT,SEAL GAS,10MICRON,P/N FE- | A | Reduce | Excess | 64 EA | – | 14 / 30 | 16 / 21 / 48 | – | 0% | −Rp 28.4M |
| 4300024364 SLEEVE,SHAFT,DWG.680-8111,FOR PP-1752A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 3% | – |
| 4300052473 SLEEVE,SHAFT,DWG.600-9894,FOR PP-888A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 3% | – |
| 4100084156 BEARING,THRUST PAD,MODEL YM813,PTFE | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100083835 BEARING,THRUST PAD,TYPE ZV192,CS | A | Monitor | Insurance gap | 0 SET | – | 1 / 2 | 0 / 0 / 1 | – | 3% | – |
| 4100088003 BLADE,ROTOR,MODEL RY258,A105 | A | Monitor | Insurance gap | 0 SET | 1 | 0 / 0 | 1 / 1 / 2 | – | 3% | – |
| 4100056180Long-lead TRANSMITTER,PRESS,TYPE KO80,CS | A | Monitor | Slow-moving | 1 EA | – | 1 / 3 | 0 / 0 / 2 | reorder ~01 Jul 2030 | 3% | – |
| 4100062090 THERMOCOUPLE,N-2ELMNT,8X700LG | S | Reduce | Potentially obsolete | 6 EA | – | 4 / 9 | don't stock | – | 0% | −Rp 28.2M |
| 4100035859 VALVE,GATE,6IN,300#,CF8,SW | S | Reduce | Excess | 61 EA | 2 | 1 / 2 | 1 / 1 / 5 | – | 0% | −Rp 28.1M |
| 4300061855 SEAT RING,VALVE,DWG.123-7043,FOR LCV-112 | S | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 14% | – |
| 4300063649 COUPLING,DWG.160-5812,FOR PP-1762B | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 14% | – |
| 4200004773 LAMP,LED,18W,220VAC,FLOOD | C | Reduce | Potentially obsolete | 69 EA | – | 10 / 29 | don't stock | – | 0% | −Rp 27.8M |
| 4100016390 GASKET,RING,8IN,600#,PTFE | A | Monitor | Insurance gap | 0 EA | – | 2 / 5 | 4 / 4 / 8 | – | 3% | – |
| 4300025124 COUPLING,DWG.491-9333,FOR PP-494C | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4300025141 COUPLING,DWG.547-3363,FOR PP-494C | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100029186 PIPE,12IN,SCH160,SS316,SMLS,6M LG | A | Reduce | Non-moving | 22 LG | – | 10 / 22 | 3 / 3 / 6 | – | 0% | −Rp 27.4M |
| 4100029352 PIPE,3IN,SCH160,P11,SMLS,6M LG | C | Reduce | Potentially obsolete | 16 LG | – | 10 / 31 | don't stock | – | 0% | −Rp 27.4M |
| 4300048512 SEAT RING,VALVE,DWG.137-5364,FOR FCV-144 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 3% | – |
| 4300006918 BEARING,JOURNAL,DWG.675-8905,FOR KC-536A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100036571 VALVE,GLOBE,3/4IN,150#,A105,RF | C | Reduce | Slow-moving | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 26.8M |
| 4300072817 TRIM SET,CONTROL VALVE,DWG.710-1007,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 26.8M |
| 4100066216Safety-criticalSign-off SPRING,SAFETY VALVE,TYPE QB253,A182F11 | C | Reduce | Non-moving | 5 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 26.5M |
| 4100067459 SPRING,SAFETY VALVE,SIZE WW348,INCOLOY | A | Reduce | Non-moving | 5 EA | – | 3 / 6 | 1 / 1 / 2 | – | 0% | −Rp 26.5M |
| 4300030904Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.445-8626,FOR PRV | A | Reduce | Non-moving | 4 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 26.5M |
| 4300034001Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.757-7923,FOR PRV | C | Reduce | Non-moving | 4 EA | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 26.5M |
| 4100066875Safety-criticalSign-off SPRING,SAFETY VALVE,SIZE DR209,MONEL | C | Reduce | Non-moving | 4 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 26.5M |
| 4100081562 BEARING,JOURNAL,TYPE MJ948,PTFE | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100047261 DIAPHRAGM,ACTUATOR,TYPE NO51,MONEL | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 26.3M |
| 4100048055 DIAPHRAGM,ACTUATOR,MODEL OB224,INCOLOY | C | Reduce | Potentially obsolete | 6 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 26.3M |
| 4100036296 VALVE,GATE,2IN,150#,A216WCB,RF | C | Reduce | Potentially obsolete | 10 EA | – | 4 / 9 | don't stock | – | 0% | −Rp 26.3M |
| 4100037546 VALVE,GLOBE,2IN,300#,A216WCB,RF | A | Reduce | Non-moving | 10 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 26.3M |
| 4300056367 TRAY VALVE,DWG.984-3815,FOR CL-962 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 3% | – |
| 4300033629 VALVE,GOVERNOR,DWG.371-7253,FOR KT-624A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 13% | – |
| 4300060705 SEAL,LABYRINTH,DWG.537-7212,FOR KC-843 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 13% | – |
| 4300065634 POSITIONER,VALVE,DWG.695-3246,FOR LCV-83 | B | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 2 | reorder ~12 Sept 2030 | 3% | – |
| 4300051350 POSITIONER,VALVE,DWG.148-4548,FOR LCV-40 | C | Monitor | No stock needed | 0 EA | – | 1 / 3 | don't stock | – | 6% | – |
| 4300054961 THERMOWELL,DWG.885-6188,FOR BF-105-BRN15 | C | Reduce | Potentially obsolete | 5 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 25.7M |
| 4100028699 PIPE,4IN,SCH40,P11,SMLS,6M LG | A | Reduce | Non-moving | 18 LG | – | 4 / 8 | 0 / 0 / 3 | – | 0% | −Rp 25.7M |
| 4300030725 COUPLING,DWG.571-3280,FOR KC-216B | S | Reduce | Potentially obsolete | 3 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 25.7M |
| 4100011176 COUPLING,MODEL NO800,CS | A | Reduce | Non-moving | 4 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 25.7M |
| 4300051569 COUPLING,DWG.760-3997,FOR KC-511C | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 25.7M |
| 4300035946 COUPLING,DWG.214-2536,FOR KC-624A | B | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 25.7M |
| 4300068209 COUPLING,DWG.146-8026,FOR KC-713B | A | Reduce | Non-moving | 5 SET | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 25.7M |
| 4300064933 COUPLING,DWG.962-5584,FOR KC-830D | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 25.7M |
| 4100011270 COUPLING,MODEL DW336,GRAPHITE | A | Reduce | Non-moving | 5 SET | – | 2 / 6 | 1 / 1 / 2 | – | 0% | −Rp 25.7M |
| 4300058452 COUPLING,DWG.982-1424,FOR PP-1154B | C | Reduce | Potentially obsolete | 3 SET | – | 5 / 14 | don't stock | – | 0% | −Rp 25.7M |