Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 31 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100089321Sign-off BLADE,ROTOR,SIZE BI731,CS | S | Reduce | Potentially obsolete | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.3B |
| 4300022112Sign-off BLADE,ROTOR,DWG.354-2435,FOR KT-856A | A | Reduce | Non-moving | 7 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 2.3B |
| 4100059364Sign-off TRANSMITTER,TEMP,SIZE CN756,INCOLOY | B | Reduce | Non-moving | 68 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.3B |
| 4300047900Sign-off TRIM SET,CONTROL VALVE,DWG.679-6515,FOR | B | Reduce | Non-moving | 29 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.3B |
| 4300025897Sign-off TRIM SET,CONTROL VALVE,DWG.156-6366,FOR | C | Reduce | Potentially obsolete | 29 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.3B |
| 4300027992Sign-off POSITIONER,VALVE,DWG.765-4788,FOR TCV-17 | S | Reduce | Potentially obsolete | 57 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 2.3B |
| 4200000566 TERMINAL,LUG,FORK,1.25X6MM,CRIMP | A | ReorderNormal | Below reorder point | 512 EA | – | 407 / 620 | 503 / 520 / 846 | 334 by 01 Oct 2026 | 0% | Rp 513,191 |
| 4300016713Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.145-3314,FOR PRV | S | Reduce | Non-moving | 255 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 2.2B |
| 4300036923Sign-off BEARING,JOURNAL,DWG.630-5289,FOR KC-137A | A | Reduce | Non-moving | 11 SET | – | 4 / 6 | 0 / 0 / 1 | – | 0% | −Rp 2.2B |
| 4300024641Sign-off BEARING,JOURNAL,DWG.510-9497,FOR KC-150A | S | Reduce | Potentially obsolete | 10 SET | – | 4 / 12 | don't stock | – | 0% | −Rp 2.2B |
| 4300042348Sign-off BEARING,THRUST PAD,DWG.978-3069,FOR KC-2 | S | Reduce | Potentially obsolete | 10 SET | – | 4 / 7 | don't stock | – | 0% | −Rp 2.2B |
| 4300057482Sign-off BEARING,JOURNAL,DWG.766-6339,FOR KC-235D | A | Reduce | Non-moving | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.2B |
| 4300060713Sign-off BEARING,JOURNAL,DWG.117-8011,FOR KC-843 | S | Reduce | Potentially obsolete | 10 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 2.2B |
| 4300001291Sign-off BEARING,THRUST PAD,DWG.150-2757,FOR KT-2 | S | Reduce | Potentially obsolete | 10 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 2.2B |
| 4300013671Sign-off BEARING,JOURNAL,DWG.747-5855,FOR KT-308B | A | Reduce | Non-moving | 11 SET | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 2.2B |
| 4300039636Sign-off BEARING,JOURNAL,DWG.357-1590,FOR KT-419A | A | Reduce | Non-moving | 11 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.2B |
| 4300029363Sign-off BEARING,THRUST PAD,DWG.469-2870,FOR KT-4 | S | Reduce | Potentially obsolete | 10 SET | – | 4 / 13 | don't stock | – | 0% | −Rp 2.2B |
| 4300032409Sign-off BEARING,THRUST PAD,DWG.607-8590,FOR KT-6 | S | Reduce | Potentially obsolete | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.2B |
| 4300043321Sign-off BEARING,THRUST PAD,DWG.651-4548,FOR KT-7 | S | Reduce | Potentially obsolete | 10 SET | – | 5 / 14 | don't stock | – | 0% | −Rp 2.2B |
| 4300044286Sign-off BEARING,JOURNAL,DWG.460-9969,FOR KT-778A | S | Reduce | Potentially obsolete | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.2B |
| 4300028620Sign-off BEARING,THRUST PAD,DWG.603-8284,FOR KC-4 | A | Reduce | Non-moving | 11 SET | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 2.2B |
| 4300011423Sign-off SEAL,LABYRINTH,DWG.885-6454,FOR KT-383A | S | Reduce | Potentially obsolete | 23 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.2B |
| 4100005862Sign-off SEAL,MECHANICAL,TYPE SR281,SS316 | B | Reduce | Non-moving | 26 SET | – | 10 / 21 | 2 / 2 / 3 | – | 0% | −Rp 2.2B |
| 4100049277Long-lead POSITIONER,VALVE,TYPE EV566,CS | A | ReorderNormal | Slow-moving | 1 EA | – | 0 / 0 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 22.3M |
| 4100059165Long-leadSign-off TRANSMITTER,TEMP,SIZE GU679,NBR | A | Reduce | Slow-moving | 130 EA | 2 | 0 / 0 | 3 / 3 / 5 | – | 0% | −Rp 2.1B |
| 4300010483Sign-off VALVE,GOVERNOR,DWG.343-2245,FOR KT-383A | S | Reduce | Potentially obsolete | 9 ASS | – | 3 / 5 | don't stock | – | 0% | −Rp 2.1B |
| 4300069687Sign-off VALVE,GOVERNOR,DWG.472-1266,FOR KT-513 | A | Reduce | Non-moving | 10 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.1B |
| 4300032936Sign-off VALVE,GOVERNOR,DWG.246-5426,FOR KT-624A | S | Reduce | Potentially obsolete | 9 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 2.1B |
| 4300063853Sign-off IMPELLER,DWG.207-1593,FOR PP-1269A | A | Reduce | Non-moving | 22 EA | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 2.1B |
| 4300068613Sign-off IMPELLER,DWG.673-5547,FOR PP-1369C | A | Reduce | Non-moving | 22 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.1B |
| 4300021600Sign-off TRIM SET,CONTROL VALVE,DWG.639-4861,FOR | S | Reduce | Potentially obsolete | 27 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.1B |
| 4100029933 ELBOW,90DEG,1/2IN,SCH40,A234WPB,BW | A | ReorderNormal | Below reorder point | 3 EA | – | 1 / 2 | 4 / 4 / 13 | 10 by 01 Oct 2026 | 0% | Rp 2.2M |
| 4300044552Sign-off SEAL,LABYRINTH,DWG.807-8367,FOR KC-752A | A | Reduce | Non-moving | 23 SET | – | 10 / 32 | 0 / 0 / 1 | – | 0% | −Rp 2.1B |
| 4300059789Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,DWG.755-3767,FOR PRV | S | Reduce | Excess | 96 EA | – | 1 / 2 | 5 / 6 / 8 | – | 0% | −Rp 2.1B |
| 4300027583Sign-off POSITIONER,VALVE,DWG.277-7099,FOR PCV-57 | C | Reduce | Potentially obsolete | 52 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 2.1B |
| 4300066952Long-lead SEAT RING,VALVE,DWG.764-1132,FOR TCV-148 | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 10.7M |
| 4100006941Sign-off IMPELLER,TYPE AJ353,PTFE | A | Reduce | Non-moving | 21 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4300065997Sign-off TRIM SET,CONTROL VALVE,DWG.330-4651,FOR | A | Reduce | Non-moving | 27 SET | – | 10 / 15 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4300049720Sign-off TRIM SET,CONTROL VALVE,DWG.308-2047,FOR | A | Reduce | Non-moving | 26 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.0B |
| 4100017966 GASKET,SW,4IN,150#,GR/304 | A | ReorderNormal | Below reorder point | 6 EA | – | 1 / 3 | 10 / 10 / 15 | 9 by 01 Oct 2026 | 0% | Rp 1.9M |
| 4300057460Sign-off RING,WEAR,DWG.403-8588,FOR PP-411A | S | Reduce | Potentially obsolete | 210 EA | – | 5 / 15 | don't stock | – | 0% | −Rp 2.0B |
| 4100082787Sign-off BEARING,THRUST PAD,TYPE JD462,SS316 | S | Reduce | Potentially obsolete | 9 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 2.0B |
| 4300044677Sign-off BEARING,JOURNAL,DWG.261-2254,FOR KC-225D | B | Reduce | Non-moving | 9 SET | – | 4 / 11 | don't stock | – | 0% | −Rp 2.0B |
| 4300057566Sign-off BEARING,THRUST PAD,DWG.117-1513,FOR KC-2 | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.0B |
| 4100083340Sign-off BEARING,THRUST PAD,TYPE QI431,SS316 | A | Reduce | Non-moving | 10 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4100081298Sign-off BEARING,JOURNAL,TYPE GK367,A105 | A | Reduce | Non-moving | 10 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4300017736Sign-off BEARING,THRUST PAD,DWG.229-1867,FOR KT-2 | S | Reduce | Non-moving | 9 SET | – | 3 / 5 | don't stock | – | 0% | −Rp 2.0B |
| 4300018110Sign-off BEARING,THRUST PAD,DWG.123-7372,FOR KT-2 | S | Reduce | Non-moving | 9 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 2.0B |
| 4100083400Sign-off BEARING,THRUST PAD,MODEL LK475,CS | A | Reduce | Non-moving | 10 SET | – | 10 / 14 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4300013718Sign-off BEARING,JOURNAL,DWG.591-4027,FOR KT-308B | A | Reduce | Non-moving | 10 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |