Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 32 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300004431Sign-off BEARING,JOURNAL,DWG.574-1164,FOR KT-397A | A | Reduce | Non-moving | 10 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4300004667Sign-off BEARING,THRUST PAD,DWG.457-3525,FOR KT-3 | A | Reduce | Non-moving | 10 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4300004824Sign-off BEARING,JOURNAL,DWG.673-2451,FOR KT-397A | A | Reduce | Non-moving | 10 SET | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 2.0B |
| 4300030325Sign-off BEARING,JOURNAL,DWG.245-1940,FOR KT-447 | S | Reduce | Potentially obsolete | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 2.0B |
| 4100043347Sign-off TRIM SET,CONTROL VALVE,MODEL RD612,INCOL | A | Reduce | Excess | 31 SET | – | 0 / 0 | 4 / 5 / 6 | – | 0% | −Rp 2.0B |
| 4300073003Sign-off TRIM SET,CONTROL VALVE,DWG.896-5008,FOR | B | Reduce | Non-moving | 25 SET | – | 10 / 16 | don't stock | – | 0% | −Rp 2.0B |
| 4300030351Sign-off BEARING,THRUST PAD,DWG.733-9111,FOR KT-4 | S | Reduce | Potentially obsolete | 12 SET | 2 | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4100034648Sign-off VALVE,GATE,6IN,300#,A105,SW | A | Reduce | Excess | 446 EA | – | 8 / 22 | 14 / 18 / 29 | – | 0% | −Rp 1.9B |
| 4300000842Sign-off BLADE,ROTOR,DWG.447-4266,FOR KT-202 | S | Reduce | Potentially obsolete | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4300011846Sign-off BLADE,ROTOR,DWG.138-4768,FOR KT-383A | S | Reduce | Potentially obsolete | 5 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 1.9B |
| 4300004262Sign-off BLADE,ROTOR,DWG.828-5092,FOR KT-397A | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4300004887Sign-off BLADE,ROTOR,DWG.588-3607,FOR KT-397A | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4300030119Sign-off BLADE,ROTOR,DWG.109-5734,FOR KT-447 | S | Reduce | Potentially obsolete | 5 SET | – | 4 / 9 | don't stock | – | 0% | −Rp 1.9B |
| 4300033736Sign-off BLADE,ROTOR,DWG.509-1982,FOR KT-624A | S | Reduce | Potentially obsolete | 5 SET | – | 3 / 7 | don't stock | – | 0% | −Rp 1.9B |
| 4300043315Sign-off BLADE,ROTOR,DWG.918-3719,FOR KT-778A | S | Reduce | Potentially obsolete | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4300022594Sign-off BLADE,ROTOR,DWG.670-5509,FOR KT-856A | A | Reduce | Non-moving | 6 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4300018202Sign-off VALVE,GOVERNOR,DWG.510-6784,FOR KT-264A | S | Reduce | Potentially obsolete | 8 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4100089884Sign-off VALVE,GOVERNOR,MODEL UQ176,SS304 | S | Reduce | Potentially obsolete | 8 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4300003165Sign-off VALVE,GOVERNOR,DWG.140-2621,FOR KT-397A | A | Reduce | Non-moving | 9 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4100089909Sign-off VALVE,GOVERNOR,SIZE ZL342,A105 | S | Reduce | Potentially obsolete | 8 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4100027918 PIPE,1-1/2IN,SCH80,P11,SMLS,6M LG | A | ReorderNormal | Below reorder point | 12 LG | – | 10 / 17 | 10 / 12 / 27 | 15 by 01 Oct 2026 | 0% | Rp 40.5M |
| 4300000389Sign-off BLADE,ROTOR,DWG.726-8864,FOR KT-202 | S | Reduce | Excess | 10 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4100002978 BEARING,BALL,1ROW,DEEP GROOVE,NU316-2Z | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 10.5M |
| 4300042285Sign-off SEAL,LABYRINTH,DWG.477-9461,FOR KC-210D | S | Reduce | Potentially obsolete | 20 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4300031206Sign-off SEAL,LABYRINTH,DWG.271-4634,FOR KC-717 | A | Reduce | Non-moving | 21 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4300039517Sign-off SEAL,LABYRINTH,DWG.206-6701,FOR KT-419A | A | Reduce | Non-moving | 21 SET | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4300070753Sign-off SEAL,LABYRINTH,DWG.578-1935,FOR KT-513 | A | Reduce | Non-moving | 21 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4100000825Long-lead BEARING,ROLLER,CYL,1ROW,7219-2Z | A | ReorderNormal | Below reorder point | 3 EA | – | 1 / 2 | 4 / 4 / 7 | 4 by 01 Oct 2026 | 0% | Rp 12.8M |
| 4300013196Long-leadSign-off BEARING,JOURNAL,DWG.294-9925,FOR KT-308B | A | Reduce | Non-moving | 19 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4300051975Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.288-4013,FOR PRV | B | Reduce | Non-moving | 214 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4100046921Sign-off DIAPHRAGM,ACTUATOR,SIZE NV280,MONEL | A | Reduce | Non-moving | 431 EA | – | 10 / 20 | 2 / 2 / 3 | – | 0% | −Rp 1.9B |
| 4100049319Sign-off POSITIONER,VALVE,MODEL PN502,MONEL | C | Reduce | Potentially obsolete | 47 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.9B |
| 4300034140Sign-off POSITIONER,VALVE,DWG.911-9529,FOR FCV-15 | C | Reduce | Potentially obsolete | 47 EA | – | 10 / 19 | don't stock | – | 0% | −Rp 1.9B |
| 4300039480Long-leadSign-off VALVE,GOVERNOR,DWG.170-1399,FOR KT-419A | A | Reduce | Non-moving | 7 ASS | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.9B |
| 4100007154Sign-off IMPELLER,MODEL IZ24,A182F11 | A | Reduce | Non-moving | 19 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300065536Sign-off POSITIONER,VALVE,DWG.775-1409,FOR LCV-25 | C | Reduce | Potentially obsolete | 46 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.8B |
| 4300041650Sign-off TRIM SET,CONTROL VALVE,DWG.466-6231,FOR | S | Reduce | Potentially obsolete | 23 SET | – | 10 / 32 | don't stock | – | 0% | −Rp 1.8B |
| 4100019555Safety-critical O-RING,VITON,190MM ID,5.3MM CS | A | ReorderNormal | Below reorder point | 11 EA | 7 | 7 / 10 | 18 / 21 / 52 | 34 by 01 Oct 2026 | 0% | Rp 410,176 |
| 4300014342Sign-off SEAL,LABYRINTH,DWG.702-2423,FOR KC-106B | A | Reduce | Non-moving | 20 SET | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4100024915 STUDBOLT,5/8INX45MM,B7/2H | A | ReorderNormal | Slow-moving | 55 EA | – | 17 / 26 | 63 / 64 / 104 | 49 by 01 Oct 2026 | 0% | Rp 1.5M |
| 4300003736Long-leadSign-off SEAL,LABYRINTH,DWG.280-9237,FOR KT-397A | A | Reduce | Non-moving | 7 SET | 1 | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4100082169Sign-off BEARING,JOURNAL,SIZE PZ414,GRAPHITE | A | Reduce | Non-moving | 9 SET | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300024438Sign-off BEARING,JOURNAL,DWG.208-7210,FOR KC-426D | A | Reduce | Non-moving | 8 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.8B |
| 4300050739Sign-off BEARING,JOURNAL,DWG.542-7279,FOR KC-452 | A | Reduce | Non-moving | 9 SET | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300009667Sign-off BEARING,THRUST PAD,DWG.315-5106,FOR KC-4 | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300049861Sign-off BEARING,JOURNAL,DWG.128-3240,FOR KC-671D | A | Reduce | Non-moving | 8 SET | – | 4 / 10 | don't stock | – | 0% | −Rp 1.8B |
| 4300031247Sign-off BEARING,JOURNAL,DWG.686-8528,FOR KC-717 | A | Reduce | Non-moving | 9 SET | – | 5 / 16 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300000744Sign-off BEARING,THRUST PAD,DWG.379-7954,FOR KT-2 | S | Reduce | Potentially obsolete | 8 SET | – | 4 / 6 | don't stock | – | 0% | −Rp 1.8B |
| 4300000979Sign-off BEARING,THRUST PAD,DWG.128-4508,FOR KT-2 | S | Reduce | Potentially obsolete | 8 SET | – | 5 / 10 | don't stock | – | 0% | −Rp 1.8B |
| 4300017203Sign-off BEARING,JOURNAL,DWG.678-2883,FOR KT-264A | S | Reduce | Non-moving | 8 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 1.8B |