Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 33 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300006085Sign-off BEARING,JOURNAL,DWG.196-2086,FOR KT-460B | A | Reduce | Non-moving | 9 SET | – | 4 / 9 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300069453Sign-off BEARING,JOURNAL,DWG.881-9650,FOR KT-513 | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300070534Sign-off BEARING,THRUST PAD,DWG.316-9188,FOR KT-5 | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.8B |
| 4300042811Sign-off BEARING,JOURNAL,DWG.767-7656,FOR KT-778A | S | Reduce | Potentially obsolete | 8 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.8B |
| 4300062370Sign-off BEARING,THRUST PAD,DWG.926-9391,FOR KT-8 | S | Reduce | Potentially obsolete | 8 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.8B |
| 4300072160Safety-critical NOZZLE,SAFETY VALVE,DWG.640-4619,FOR PRV | S | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 40.6M |
| 4100043834Sign-off TRIM SET,CONTROL VALVE,SIZE RR314,MONEL | C | Reduce | Potentially obsolete | 22 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.7B |
| 4300041445Sign-off POSITIONER,VALVE,DWG.238-6414,FOR FCV-90 | C | Reduce | Potentially obsolete | 43 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.7B |
| 4300015538Sign-off SEAL,LABYRINTH,DWG.601-7859,FOR KC-396 | A | Reduce | Non-moving | 19 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.7B |
| 4300000416Sign-off SEAL,LABYRINTH,DWG.207-5523,FOR KT-202 | S | Reduce | Potentially obsolete | 18 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.7B |
| 4300004224Sign-off SEAL,LABYRINTH,DWG.660-2726,FOR KT-397A | A | Reduce | Non-moving | 19 SET | – | 10 / 21 | 0 / 0 / 1 | – | 0% | −Rp 1.7B |
| 4300029672Sign-off SEAL,LABYRINTH,DWG.351-7534,FOR KT-447 | S | Reduce | Potentially obsolete | 18 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.7B |
| 4100058024Sign-off TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF | A | Reduce | Slow-moving | 70 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 1.7B |
| 4300019546Sign-off POSITIONER,VALVE,DWG.683-2833,FOR PCV-61 | A | Reduce | Non-moving | 42 EA | – | 10 / 27 | don't stock | – | 0% | −Rp 1.7B |
| 4300017373Sign-off VALVE,GOVERNOR,DWG.889-8908,FOR KT-264A | S | Reduce | Potentially obsolete | 7 ASS | – | 2 / 3 | don't stock | – | 0% | −Rp 1.7B |
| 4300013471Sign-off VALVE,GOVERNOR,DWG.657-1397,FOR KT-308B | A | Reduce | Non-moving | 7 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 1.7B |
| 4300013905Sign-off VALVE,GOVERNOR,DWG.877-1943,FOR KT-308B | A | Reduce | Non-moving | 7 ASS | – | 4 / 10 | don't stock | – | 0% | −Rp 1.7B |
| 4300003433Sign-off VALVE,GOVERNOR,DWG.297-6153,FOR KT-397A | A | Reduce | Non-moving | 8 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.7B |
| 4300004083Sign-off VALVE,GOVERNOR,DWG.138-8412,FOR KT-397A | A | Reduce | Non-moving | 8 ASS | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 1.7B |
| 4300069907Sign-off VALVE,GOVERNOR,DWG.282-9167,FOR KT-513 | A | Reduce | Non-moving | 8 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.7B |
| 4300000201Sign-off DEMISTER PAD,DWG.721-5554,FOR VD-1069 | B | Reduce | Slow-moving | 110 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 1.7B |
| 4100086104Long-leadSign-off FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-9 | A | Reduce | Excess | 507 EA | 730 | 10 / 25 | 83 / 140 / 163 | – | 0% | −Rp 1.7B |
| 4100086180Sign-off FILTER ELEMENT,SEAL GAS,25MICRON,P/N FE- | A | Reduce | Excess | 2,260 EA | 39 | 22 / 63 | 16 / 23 / 53 | – | 0% | −Rp 1.7B |
| 4100016509 GASKET,SHEET,4IN,300#,GRAPHITE | C | ReorderNormal | Slow-moving | 2 EA | – | 1 / 3 | 2 / 2 / 5 | 3 by 01 Oct 2026 | 0% | Rp 643,361 |
| 4100048797Long-leadSign-off POSITIONER,VALVE,SIZE LW189,MONEL | B | Reduce | Slow-moving | 28 EA | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 1.6B |
| 4300073382Sign-off TRIM SET,CONTROL VALVE,DWG.756-6442,FOR | B | Reduce | Slow-moving | 22 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.6B |
| 4300066647Sign-off TRIM SET,CONTROL VALVE,DWG.907-7081,FOR | C | Reduce | Potentially obsolete | 21 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.6B |
| 4300060443Sign-off TRIM SET,CONTROL VALVE,DWG.804-4375,FOR | B | Reduce | Non-moving | 21 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.6B |
| 4300066332Long-lead POSITIONER,VALVE,DWG.589-7507,FOR LCV-16 | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 17.2M |
| 4100055776Sign-off TRANSMITTER,PRESS,MODEL YP580,PTFE | C | Reduce | Potentially obsolete | 48 EA | – | 10 / 32 | don't stock | – | 0% | −Rp 1.6B |
| 4100007362Sign-off IMPELLER,MODEL YP771,MONEL | B | Reduce | Non-moving | 16 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.6B |
| 4100055698Sign-off TRANSMITTER,PRESS,TYPE LF716,CS | C | Reduce | Slow-moving | 40 EA | 1 | 1 / 2 | don't stock | – | 0% | −Rp 1.6B |
| 4300028079Sign-off TRIM SET,CONTROL VALVE,DWG.532-6616,FOR | C | Reduce | Slow-moving | 12 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 1.6B |
| 4100005137Long-leadSign-off SEAL,MECHANICAL,TYPE ZV470,PTFE | A | Reduce | Excess | 61 SET | 1 | 0 / 0 | 9 / 13 / 16 | – | 0% | −Rp 1.6B |
| 4100085266Sign-off SEAL,LABYRINTH,SIZE ZM706,A105 | A | Reduce | Non-moving | 20 SET | – | 10 / 23 | 2 / 2 / 3 | – | 0% | −Rp 1.6B |
| 4200001459 GLAND,CABLE,TYPE QR671,PTFE | B | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 561,410 |
| 4100077836Sign-off BURNER TIP,MODEL LR790,SS316 | S | Reduce | Potentially obsolete | 103 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 1.6B |
| 4100032889Sign-off FLANGE,SO,1/4IN,300#,SS316,RF | A | Reduce | Excess | 5,584 EA | 51 | 78 / 202 | 40 / 54 / 129 | – | 0% | −Rp 1.6B |
| 4300057946Sign-off TRIM SET,CONTROL VALVE,DWG.454-6033,FOR | C | Reduce | Potentially obsolete | 20 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.6B |
| 4300073053Sign-off TRIM SET,CONTROL VALVE,DWG.651-3558,FOR | C | Reduce | Potentially obsolete | 20 SET | – | 3 / 8 | don't stock | – | 0% | −Rp 1.6B |
| 4300064829Sign-off TRIM SET,CONTROL VALVE,DWG.711-9328,FOR | C | Reduce | Potentially obsolete | 20 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.6B |
| 4100038453 VALVE,NEEDLE,1/4IN ODT,3000PSI,SS316 | A | TransferNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | transfer 2 from 4100038669, 4100039815 | 0% | – |
| 4100028240 PIPE,8IN,SCH160,CS,SMLS,6M LG | A | ReorderNormal | Slow-moving | 1 LG | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 1.7M |
| 4100014970Safety-critical GASKET,SHEET,8IN,300#,GR/304 | A | ReorderNormal | Slow-moving | 4 EA | 6 | 2 / 5 | 12 / 12 / 18 | 8 by 01 Oct 2026 | 0% | Rp 263,680 |
| 4300024602Sign-off BEARING,THRUST PAD,DWG.218-1188,FOR KC-1 | S | Reduce | Potentially obsolete | 7 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.5B |
| 4100081213Sign-off BEARING,JOURNAL,TYPE CZ306,SS316 | S | Reduce | Potentially obsolete | 7 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.5B |
| 4100082150Sign-off BEARING,JOURNAL,MODEL BG386,A105 | A | Reduce | Non-moving | 8 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.5B |
| 4300061222Sign-off BEARING,THRUST PAD,DWG.518-1879,FOR KC-5 | S | Reduce | Potentially obsolete | 7 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 1.5B |
| 4300020182Sign-off BEARING,JOURNAL,DWG.707-1145,FOR KC-730 | S | Reduce | Potentially obsolete | 7 SET | – | 4 / 9 | don't stock | – | 0% | −Rp 1.5B |
| 4300015758Sign-off BEARING,THRUST PAD,DWG.180-7687,FOR KC-8 | A | Reduce | Non-moving | 8 SET | – | 3 / 4 | 0 / 0 / 1 | – | 0% | −Rp 1.5B |