Sparely
DU

Material List

One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.

Clear filters

7,481 spare parts

Order value Rp 123.8B · excess value Rp 5.62T · page 45 of 150

PartCrit.ActionHealthStockOn orderToday Min / MaxRec. SS / Min / MaxOrderStockout riskValue
4100085173
SEAL,LABYRINTH,TYPE OI866,SS304
S
Reduce
Potentially obsolete5 SET–0 / 0don't stock–0%−Rp 472.9M
4300017006
SEAL,LABYRINTH,DWG.908-1551,FOR KT-264A
S
Reduce
Non-moving5 SET–0 / 0don't stock–0%−Rp 472.9M
4100085061
SEAL,LABYRINTH,MODEL WX109,PTFE
A
Reduce
Non-moving6 SET–5 / 90 / 0 / 1–0%−Rp 472.9M
4300040730
SEAL,LABYRINTH,DWG.577-7053,FOR KT-419A
A
Reduce
Non-moving6 SET–3 / 60 / 0 / 1–0%−Rp 472.9M
4300029253
SEAL,LABYRINTH,DWG.974-6267,FOR KT-447
S
Reduce
Potentially obsolete5 SET–0 / 0don't stock–0%−Rp 472.9M
4300005428
SEAL,LABYRINTH,DWG.578-9615,FOR KT-460B
A
Reduce
Non-moving6 SET–2 / 50 / 0 / 1–0%−Rp 472.9M
4300032545
SEAL,LABYRINTH,DWG.474-6401,FOR KT-624A
S
Reduce
Potentially obsolete5 SET–2 / 6don't stock–0%−Rp 472.9M
4100006725
SEAL,MECHANICAL,MODEL VA716,SS316
A
Reduce
Non-moving6 SET–3 / 60 / 0 / 1–0%−Rp 472.9M
4100006043
SEAL,MECHANICAL,TYPE LA401,INCOLOY
A
Reduce
Non-moving7 SET–0 / 01 / 1 / 2–0%−Rp 472.9M
4100006593
SEAL,MECHANICAL,MODEL NU664,SS304
B
Reduce
Non-moving6 SET–5 / 100 / 0 / 1–0%−Rp 472.9M
4300058925Safety-criticalLong-leadSign-off
NOZZLE,SAFETY VALVE,DWG.756-9179,FOR PRV
S
Reduce
Excess18 EA–0 / 03 / 3 / 5–0%−Rp 471.2M
4300071329
TRIM SET,CONTROL VALVE,DWG.982-6466,FOR
C
Reduce
Potentially obsolete6 SET–1 / 3don't stock–0%−Rp 471.0M
4300012544
TRIM SET,CONTROL VALVE,DWG.542-9092,FOR
C
Reduce
Potentially obsolete6 SET–5 / 11don't stock–0%−Rp 471.0M
4300007628
TRIM SET,CONTROL VALVE,DWG.684-3661,FOR
C
Reduce
Potentially obsolete6 SET–4 / 7don't stock–0%−Rp 471.0M
4300027759
TRIM SET,CONTROL VALVE,DWG.311-2729,FOR
S
Reduce
Potentially obsolete6 SET–3 / 8don't stock–0%−Rp 471.0M
4300073369
TRIM SET,CONTROL VALVE,DWG.274-2464,FOR
C
Reduce
Potentially obsolete6 SET–0 / 0don't stock–0%−Rp 471.0M
4100044502
TRIM SET,CONTROL VALVE,MODEL HG852,VITON
C
Reduce
Non-moving6 SET–2 / 6don't stock–0%−Rp 471.0M
4300015261
TRIM SET,CONTROL VALVE,DWG.921-3701,FOR
A
Reduce
Non-moving7 SET–2 / 60 / 0 / 1–0%−Rp 471.0M
4100044558
TRIM SET,CONTROL VALVE,TYPE KI547,CS
C
Reduce
Potentially obsolete6 SET–0 / 0don't stock–0%−Rp 471.0M
4300060120
TRIM SET,CONTROL VALVE,DWG.600-4906,FOR
A
Reduce
Non-moving7 SET–0 / 00 / 0 / 1–0%−Rp 471.0M
4300025098
TRIM SET,CONTROL VALVE,DWG.735-1041,FOR
C
Reduce
Slow-moving6 SET–0 / 0don't stock–0%−Rp 471.0M
4300040967
TRIM SET,CONTROL VALVE,DWG.127-5251,FOR
B
Reduce
Non-moving6 SET–5 / 10don't stock–0%−Rp 471.0M
4100044628
TRIM SET,CONTROL VALVE,SIZE HC588,A182F1
C
Reduce
Potentially obsolete6 SET–3 / 5don't stock–0%−Rp 471.0M
4100011052
COUPLING,MODEL MD159,SS316
S
Reduce
Potentially obsolete55 SET–10 / 28don't stock–0%−Rp 470.5M
4300021926
COUPLING,DWG.846-3101,FOR PP-1938A
S
Reduce
Slow-moving55 SET–0 / 0don't stock–0%−Rp 470.5M
4100000783Long-lead
BEARING,ROLLER,CYL,1ROW,6305-2Z
A
ReorderNormal
Below reorder point9 EA33 / 510 / 12 / 219
by 01 Oct 2026
0%Rp 15.8M
4100002199
BEARING,BALL,1ROW,DEEP GROOVE,6207 C3
A
Reduce
Non-moving323 EA–5 / 82 / 2 / 4–0%−Rp 454.5M
4300037222
IMPELLER,DWG.882-8297,FOR PP-111C
S
Reduce
Potentially obsolete5 EA–1 / 2don't stock–0%−Rp 454.3M
4300067909
TRIM SET,CONTROL VALVE,DWG.240-6089,FOR
C
Maintain
No stock needed0 SET–0 / 0don't stock–100%–
4300049202
IMPELLER,DWG.894-7981,FOR PP-1744
C
Maintain
No stock needed0 EA–0 / 0don't stock–100%–
4100007316
IMPELLER,SIZE GS324,INCOLOY
C
Maintain
No stock needed0 EA–1 / 2don't stock–100%–
4300034458
SLEEVE,SHAFT,DWG.245-1413,FOR PP-376A
C
Maintain
No stock needed0 EA–0 / 0don't stock–100%–
4300035851
TRIM SET,CONTROL VALVE,DWG.481-3301,FOR
C
Maintain
No stock needed0 SET–3 / 8don't stock–100%–
4300035889
SEAT RING,VALVE,DWG.411-3278,FOR TCV-918
C
Maintain
No stock needed0 EA–0 / 0don't stock–100%–
4300018518
TRIM SET,CONTROL VALVE,DWG.717-8476,FOR
C
Maintain
No stock needed0 SET–0 / 0don't stock–100%–
4100078786
BURNER TIP,MODEL BI299,SS316
A
Reduce
Non-moving30 EA–0 / 00 / 0 / 1–0%−Rp 449.3M
4300051949Safety-critical
NOZZLE,SAFETY VALVE,DWG.321-7117,FOR PRV
S
ReorderNormal
Slow-moving1 EA–1 / 21 / 1 / 21
by 01 Oct 2026
0%Rp 20.3M
4100078484Long-lead
BURNER TIP,SIZE RR239,SS304
A
Monitor
Insurance gap0 EA–0 / 04 / 4 / 6–45%–
4100097010
DEMISTER PAD,SIZE UF180,INCOLOY
A
Reduce
Non-moving30 EA–0 / 00 / 0 / 1–0%−Rp 447.3M
4100038518
VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316
A
Reduce
Non-moving172 EA–3 / 70 / 0 / 2–0%−Rp 446.8M
4300058026
POSITIONER,VALVE,DWG.694-8467,FOR FCV-17
C
Reduce
Potentially obsolete11 EA–0 / 0don't stock–0%−Rp 439.1M
4300067877
POSITIONER,VALVE,DWG.384-9469,FOR LCV-82
C
Reduce
Slow-moving11 EA–0 / 0don't stock–0%−Rp 439.1M
4300063167
POSITIONER,VALVE,DWG.925-8601,FOR TCV-19
B
Reduce
Non-moving11 EA–2 / 5don't stock–0%−Rp 439.1M
4300009998
POSITIONER,VALVE,DWG.303-4842,FOR TCV-82
A
Reduce
Non-moving12 EA–10 / 260 / 0 / 1–0%−Rp 439.1M
4300014419
BEARING,THRUST PAD,DWG.220-7977,FOR KC-1
A
Reduce
Non-moving2 SET–0 / 0don't stock–0%−Rp 438.5M
4300024713
BEARING,JOURNAL,DWG.200-5714,FOR KC-150A
S
Reduce
Potentially obsolete2 SET–0 / 0don't stock–0%−Rp 438.5M
4300048735
BEARING,THRUST PAD,DWG.890-4016,FOR KC-1
A
Reduce
Slow-moving3 SET–0 / 00 / 0 / 1–0%−Rp 438.5M
4300048775
BEARING,THRUST PAD,DWG.148-3254,FOR KC-1
A
Reduce
Non-moving2 SET–0 / 0don't stock–0%−Rp 438.5M
4300044807
BEARING,THRUST PAD,DWG.986-8706,FOR KC-2
B
Reduce
Non-moving2 SET–0 / 0don't stock–0%−Rp 438.5M
4300074733
BEARING,JOURNAL,DWG.555-7759,FOR KC-226
A
Reduce
Non-moving3 SET–2 / 40 / 0 / 1–0%−Rp 438.5M