Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 44 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100053261Safety-criticalSign-off SOLENOID VALVE,SIZE IJ684,A105 | A | Reduce | Non-moving | 48 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 519.3M |
| 4300038364 POSITIONER,VALVE,DWG.526-4119,FOR LCV-19 | B | Reduce | Non-moving | 13 EA | – | 10 / 27 | don't stock | – | 0% | −Rp 518.9M |
| 4300027593 SEAT RING,VALVE,DWG.654-9056,FOR FCV-188 | C | Reduce | Potentially obsolete | 46 EA | – | 10 / 28 | don't stock | – | 0% | −Rp 518.9M |
| 4300045515 SLEEVE,SHAFT,DWG.483-6612,FOR PP-1029C | B | Reduce | Non-moving | 65 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 517.6M |
| 4300005767Long-lead BEARING,JOURNAL,DWG.465-9776,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 515.0M |
| 4300052909Safety-criticalSign-off DISC,SAFETY VALVE,DWG.640-2556,FOR PRV-1 | S | Reduce | Excess | 43 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 514.2M |
| 4100047204 DIAPHRAGM,ACTUATOR,SIZE BN577,NBR | A | Reduce | Slow-moving | 122 EA | – | 1 / 3 | 3 / 3 / 5 | – | 0% | −Rp 512.9M |
| 4100058314 TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF | A | Reduce | Non-moving | 15 EA | – | 10 / 27 | don't stock | – | 0% | −Rp 512.1M |
| 4300052598Long-lead THERMOWELL,DWG.800-1331,FOR TEL-1793 | A | Reduce | Slow-moving | 87 EA | 3 | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 511.8M |
| 4100077965 BURNER TIP,TYPE ON116,SS316 | A | Reduce | Slow-moving | 44 EA | – | 0 / 0 | 6 / 8 / 11 | – | 0% | −Rp 511.2M |
| 4300071282 IMPELLER,DWG.938-4803,FOR PP-1470B | A | Reduce | Non-moving | 6 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 510.5M |
| 4300035464 IMPELLER,DWG.941-7668,FOR PP-1659A | C | Reduce | Potentially obsolete | 5 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 510.5M |
| 4300031376 IMPELLER,DWG.968-1131,FOR PP-1886B | B | Reduce | Non-moving | 5 EA | – | 4 / 8 | don't stock | – | 0% | −Rp 510.5M |
| 4300059287 IMPELLER,DWG.547-1712,FOR PP-413 | B | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 510.5M |
| 4300058729 IMPELLER,DWG.258-3242,FOR PP-785A | B | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 510.5M |
| 4300063345 IMPELLER,DWG.310-8644,FOR PP-960 | C | Reduce | Potentially obsolete | 5 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 510.5M |
| 4300058470 IMPELLER,DWG.666-1627,FOR PP-203B | S | Reduce | Potentially obsolete | 5 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 510.5M |
| 4300032528 BEARING,THRUST PAD,DWG.590-2098,FOR KT-6 | S | Reduce | Potentially obsolete | 2 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 509.8M |
| 4100000941 BEARING,ROLLER,CYL,1ROW,6208-2Z | A | ReorderNormal | Below reorder point | 4 EA | – | 1 / 2 | 4 / 4 / 9 | 5 by 01 Oct 2026 | 0% | Rp 7.1M |
| 4300041337 RING,WEAR,DWG.485-6283,FOR PP-1323 | A | Reduce | Slow-moving | 67 EA | – | 1 / 2 | 3 / 3 / 5 | – | 0% | −Rp 507.5M |
| 4300047677 SEAT RING,VALVE,DWG.148-4516,FOR PCV-511 | A | ReorderNormal | Below reorder point | 2 EA | – | 0 / 0 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 11.3M |
| 4100040663 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | A | TransferNormal | Below reorder point | 2 EA | – | 1 / 3 | 2 / 2 / 4 | transfer 2 from 4100040262 | 0% | – |
| 4300008876 SEAT RING,VALVE,DWG.381-6230,FOR FCV-176 | B | Reduce | Non-moving | 45 EA | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 496.3M |
| 4100027903 PIPE,1/4IN,SCH80,P11,SMLS,6M LG | A | Reduce | Excess | 122 LG | – | 45 / 136 | 12 / 15 / 27 | – | 0% | −Rp 495.8M |
| 4100074324 CASTABLE,REFRACTORY,LW,1700DEG C | A | Reduce | Non-moving | 11,571 KG | – | 0 / 0 | 173 / 181 / 272 | – | 0% | −Rp 495.3M |
| 4100068527Safety-criticalSign-off DISC,SAFETY VALVE,TYPE PC859,CS | C | Reduce | Non-moving | 40 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 489.1M |
| 4300064291Long-lead SLEEVE,SHAFT,DWG.359-7852,FOR PP-1194 | A | ReorderNormal | Slow-moving | 6 EA | – | 1 / 3 | 6 / 6 / 9 | 3 by 01 Oct 2026 | 0% | Rp 17.8M |
| 4300052969 POSITIONER,VALVE,DWG.476-5617,FOR FCV-14 | A | Reduce | Non-moving | 12 EA | – | 5 / 15 | don't stock | – | 0% | −Rp 479.0M |
| 4300048400 POSITIONER,VALVE,DWG.834-4446,FOR PCV-15 | C | Reduce | Potentially obsolete | 12 EA | – | 10 / 24 | don't stock | – | 0% | −Rp 479.0M |
| 4100056018 TRANSMITTER,PRESS,SIZE KL809,VITON | B | Reduce | Non-moving | 15 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 478.0M |
| 4300024303 SLEEVE,SHAFT,DWG.795-6835,FOR PP-1577D | B | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 8.1M |
| 4300017105 VALVE,GOVERNOR,DWG.111-2422,FOR KT-264A | S | Reduce | Potentially obsolete | 2 ASS | – | 1 / 2 | don't stock | – | 0% | −Rp 476.6M |
| 4300017816 VALVE,GOVERNOR,DWG.622-4663,FOR KT-264A | S | Reduce | Potentially obsolete | 2 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 476.6M |
| 4300014054 VALVE,GOVERNOR,DWG.965-2083,FOR KT-308B | A | Reduce | Non-moving | 2 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 476.6M |
| 4300040850 VALVE,GOVERNOR,DWG.113-7171,FOR KT-419A | A | Reduce | Non-moving | 3 ASS | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300029516 VALVE,GOVERNOR,DWG.756-2151,FOR KT-447 | S | Reduce | Potentially obsolete | 2 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 476.6M |
| 4300030233 VALVE,GOVERNOR,DWG.627-3724,FOR KT-447 | S | Reduce | Potentially obsolete | 2 ASS | – | 1 / 3 | don't stock | – | 0% | −Rp 476.6M |
| 4300005582 VALVE,GOVERNOR,DWG.219-1825,FOR KT-460B | A | Reduce | Non-moving | 3 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300069318 VALVE,GOVERNOR,DWG.264-3070,FOR KT-513 | A | Reduce | Non-moving | 3 ASS | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300032391 VALVE,GOVERNOR,DWG.426-8889,FOR KT-624A | S | Reduce | Potentially obsolete | 2 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 476.6M |
| 4300043460 VALVE,GOVERNOR,DWG.401-4651,FOR KT-778A | S | Reduce | Potentially obsolete | 2 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 476.6M |
| 4100090165 VALVE,GOVERNOR,MODEL ZA100,SS316 | S | Reduce | Potentially obsolete | 2 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 476.6M |
| 4300022421 VALVE,GOVERNOR,DWG.595-7807,FOR KT-856A | A | Reduce | Non-moving | 3 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4100090730 VALVE,GOVERNOR,MODEL LJ891,GRAPHITE | A | Reduce | Non-moving | 3 ASS | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4100089986 VALVE,GOVERNOR,SIZE LO675,INCOLOY | A | Reduce | Non-moving | 3 ASS | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300074706 SEAL,LABYRINTH,DWG.587-3462,FOR KC-226 | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300002324 SEAL,LABYRINTH,DWG.939-1341,FOR KC-316D | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300020051 SEAL,LABYRINTH,DWG.771-5254,FOR KC-435A | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300032003 SEAL,LABYRINTH,DWG.560-8189,FOR KC-458D | S | Reduce | Potentially obsolete | 5 SET | – | 4 / 9 | don't stock | – | 0% | −Rp 472.9M |
| 4300042020 SEAL,LABYRINTH,DWG.674-8498,FOR KC-801 | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |