Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 43 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300073118 IMPELLER,DWG.384-7377,FOR PP-1056 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 612.6M |
| 4300038029 IMPELLER,DWG.814-4093,FOR PP-1131 | B | Reduce | Non-moving | 6 EA | – | 4 / 12 | don't stock | – | 0% | −Rp 612.6M |
| 4300009963 THERMOWELL,DWG.486-4487,FOR TEL-1113B | S | Reduce | Slow-moving | 101 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 611.1M |
| 4100106982 OIL,LUBRICANT,ISO VG 100,MINERAL,5L | A | Reduce | Excess | 4,111 L | – | 1,508 / 3,344 | 155 / 221 / 482 | – | 0% | −Rp 604.7M |
| 4100000832 BEARING,ROLLER,CYL,1ROW,7206 C3 | A | ReorderNormal | Below reorder point | 3 EA | – | 1 / 2 | 3 / 3 / 6 | 3 by 01 Oct 2026 | 0% | Rp 4.3M |
| 4300053100Long-lead IMPELLER,DWG.257-2714,FOR PP-1434 | B | Reduce | Non-moving | 15 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 603.5M |
| 4100035493 VALVE,GATE,1-1/2IN,150#,A105,SW | A | Reduce | Non-moving | 232 EA | – | 4 / 6 | 2 / 2 / 4 | – | 0% | −Rp 599.3M |
| 4100048612 POSITIONER,VALVE,SIZE AR822,A105 | A | Reduce | Non-moving | 16 EA | – | 5 / 11 | 0 / 0 / 1 | – | 0% | −Rp 598.8M |
| 4300019801 COUPLING,DWG.374-2467,FOR PP-387 | A | Reduce | Non-moving | 70 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 590.3M |
| 4100056544 TRANSMITTER,PRESS,SIZE VJ923,VITON | S | Reduce | Potentially obsolete | 7 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 583.8M |
| 4300014598Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.240-3259,FOR PRV | B | Reduce | Non-moving | 67 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 582.0M |
| 4300014482 SEAL,LABYRINTH,DWG.946-4524,FOR KC-264A | S | Reduce | Potentially obsolete | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 567.5M |
| 4300056599 SEAL,LABYRINTH,DWG.870-2504,FOR KC-464A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300003090 SEAL,LABYRINTH,DWG.408-2619,FOR KC-575B | S | Reduce | Potentially obsolete | 6 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 567.5M |
| 4100085859 SEAL,LABYRINTH,TYPE AJ351,PTFE | S | Reduce | Potentially obsolete | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 567.5M |
| 4300003839 SEAL,LABYRINTH,DWG.147-6730,FOR KT-397A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300040940 SEAL,LABYRINTH,DWG.685-9200,FOR KT-419A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300006065 SEAL,LABYRINTH,DWG.580-2273,FOR KT-460B | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300069371 SEAL,LABYRINTH,DWG.974-7615,FOR KT-513 | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300043767 SEAL,LABYRINTH,DWG.989-2129,FOR KT-778A | S | Reduce | Potentially obsolete | 6 SET | – | 4 / 7 | don't stock | – | 0% | −Rp 567.5M |
| 4300062842 SEAL,LABYRINTH,DWG.713-3986,FOR KT-875 | S | Reduce | Potentially obsolete | 6 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 567.5M |
| 4100005901 SEAL,MECHANICAL,SIZE XR840,SS304 | C | Reduce | Potentially obsolete | 6 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 567.5M |
| 4300036686 SLEEVE,SHAFT,DWG.503-9175,FOR PP-1407B | S | Reduce | Non-moving | 70 EA | – | 10 / 31 | don't stock | – | 0% | −Rp 566.1M |
| 4100091568 GREASE,POLYUREA,NLGI 3,1KG | A | Reduce | Slow-moving | 4,774 KG | – | 2,000 / 3,344 | 284 / 330 / 819 | – | 0% | −Rp 564.4M |
| 4300032689 SPRING,SAFETY VALVE,DWG.468-1867,FOR KT- | S | Reduce | Potentially obsolete | 64 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 564.4M |
| 4300057395 POSITIONER,VALVE,DWG.542-1221,FOR LCV-57 | C | Reduce | Potentially obsolete | 14 EA | – | 4 / 10 | don't stock | – | 0% | −Rp 558.8M |
| 4300016674 POSITIONER,VALVE,DWG.803-2405,FOR PCV-14 | S | Reduce | Potentially obsolete | 14 EA | – | 5 / 8 | don't stock | – | 0% | −Rp 558.8M |
| 4300030549 POSITIONER,VALVE,DWG.452-1178,FOR PCV-16 | C | Reduce | Slow-moving | 14 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 558.8M |
| 4300050917 POSITIONER,VALVE,DWG.809-7540,FOR TCV-16 | C | Reduce | Potentially obsolete | 14 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 558.8M |
| 4100000792 BEARING,BALL,ANGULAR,7210-2Z | A | Reduce | Slow-moving | 177 EA | 2 | 2 / 6 | 6 / 6 / 11 | – | 0% | −Rp 553.2M |
| 4300024108 TRIM SET,CONTROL VALVE,DWG.503-8509,FOR | B | Reduce | Non-moving | 7 SET | – | 3 / 7 | don't stock | – | 0% | −Rp 549.4M |
| 4300055842 TRIM SET,CONTROL VALVE,DWG.844-2368,FOR | C | Reduce | Potentially obsolete | 7 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 549.4M |
| 4300037772 TRIM SET,CONTROL VALVE,DWG.331-8170,FOR | A | Reduce | Non-moving | 7 SET | – | 5 / 9 | don't stock | – | 0% | −Rp 549.4M |
| 4300052379 TRIM SET,CONTROL VALVE,DWG.899-7713,FOR | B | Reduce | Excess | 9 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 549.4M |
| 4300015295 TRIM SET,CONTROL VALVE,DWG.523-8657,FOR | C | Reduce | Potentially obsolete | 7 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 549.4M |
| 4300041127 TRIM SET,CONTROL VALVE,DWG.249-6032,FOR | B | Reduce | Non-moving | 7 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 549.4M |
| 4100048126 DIAPHRAGM,ACTUATOR,SIZE GT341,GRAPHITE | A | Reduce | Non-moving | 126 EA | – | 4 / 9 | 0 / 0 / 1 | – | 0% | −Rp 548.0M |
| 4100043903 TRIM SET,CONTROL VALVE,TYPE LZ113,MONEL | C | Reduce | Potentially obsolete | 12 SET | 2 | 10 / 20 | don't stock | – | 0% | −Rp 546.0M |
| 4100060738Long-lead TRANSMITTER,TEMP,MODEL XX575,MONEL | A | Reduce | Excess | 36 EA | 2 | 1 / 2 | 3 / 3 / 6 | – | 0% | −Rp 543.0M |
| 4300026571 SLEEVE,SHAFT,DWG.642-4324,FOR PP-1470A | C | Reduce | Slow-moving | 69 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 541.9M |
| 4300068526Safety-criticalSign-off DISC,SAFETY VALVE,DWG.712-9227,FOR PRV-1 | A | Reduce | Non-moving | 44 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 539.3M |
| 4300037347Safety-criticalSign-off DISC,SAFETY VALVE,DWG.751-7084,FOR PRV-1 | S | Reduce | Non-moving | 44 EA | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 539.3M |
| 4100037989 VALVE,GLOBE,1-1/2IN,150#,A216WCB,RF | C | Reduce | Slow-moving | 124 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 538.1M |
| 4100055093Long-lead SWITCH,LIMIT,TYPE QS260,GRAPHITE | B | Reduce | Slow-moving | 92 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 536.5M |
| 4100053803Safety-criticalLong-lead SWITCH,LIMIT,TYPE CQ817,INCOLOY | B | ReorderNormal | Below reorder point | 2 EA | – | 0 / 0 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 8.1M |
| 4300071254Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.561-9410,FOR PRV | S | Reduce | Non-moving | 27 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 527.2M |
| 4100002581 BEARING,BALL,1ROW,DEEP GROOVE,6305 C3 | S | Reduce | Potentially obsolete | 370 EA | – | 5 / 13 | don't stock | – | 0% | −Rp 527.1M |
| 4100077611 BURNER TIP,MODEL XL135,SS304 | A | Reduce | Non-moving | 37 EA | – | 5 / 16 | 2 / 2 / 3 | – | 0% | −Rp 526.7M |
| 4200001659 GLAND,CABLE,SIZE EJ969,SS304 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 152,634 |
| 4100001290 BEARING,BALL,ANGULAR,6316 | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 2.8M |