Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 56 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100052358 SOLENOID VALVE,MODEL DG985,INCOLOY | A | Reduce | Non-moving | 20 EA | – | 4 / 10 | 1 / 1 / 2 | – | 0% | −Rp 203.2M |
| 4300036447 SEAT RING,VALVE,DWG.110-3545,FOR LCV-430 | C | Reduce | Potentially obsolete | 18 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 203.0M |
| 4300028284 SEAT RING,VALVE,DWG.813-7531,FOR TCV-931 | C | Reduce | Potentially obsolete | 18 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 203.0M |
| 4100072044 FIREBRICK,INSUL,26,76T,114W,230L | A | Monitor | Critical insurance spare | 47 EA | – | 1 / 2 | 702 / 791 / 1,187 | – | 20% | – |
| 4300004115 SPRING,SAFETY VALVE,DWG.225-3151,FOR KT- | A | Reduce | Non-moving | 25 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 202.8M |
| 4300061143Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.901-2426,FOR PRV | A | Reduce | Non-moving | 11 EA | – | 10 / 18 | 0 / 0 / 1 | – | 0% | −Rp 202.8M |
| 4100070476Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL ID819,PTFE | A | Reduce | Non-moving | 11 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 202.8M |
| 4300034113Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.321-6563,FOR PRV | S | Reduce | Non-moving | 11 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 202.8M |
| 4100039298 VALVE,NEEDLE,3/4IN NPT,6000PSI,SS316 | A | Reduce | Non-moving | 79 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 202.4M |
| 4300037702 SLEEVE,SHAFT,DWG.623-7921,FOR PP-1213 | C | Reduce | Non-moving | 25 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 202.2M |
| 4300025496 SLEEVE,SHAFT,DWG.810-1037,FOR PP-128C | B | Reduce | Non-moving | 26 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 202.2M |
| 4300027013 SLEEVE,SHAFT,DWG.297-2518,FOR PP-1862 | A | Reduce | Non-moving | 27 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 202.2M |
| 4300010289 SLEEVE,SHAFT,DWG.783-7641,FOR PP-641A | A | Reduce | Non-moving | 26 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 202.2M |
| 4100079222 ANCHOR,REFRACTORY,SIZE WI871,A182F11 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 622 / 700 / 1,090 | – | 20% | – |
| 4100087168 FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-3 | S | Maintain | No stock needed | 0 EA | – | 4 / 8 | don't stock | – | 100% | – |
| 4300017090 SEAL,LABYRINTH,DWG.801-8228,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300017169 SEAL,LABYRINTH,DWG.510-6422,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300017337 BLADE,ROTOR,DWG.674-8674,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300017393 BLADE,ROTOR,DWG.514-7264,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300017686 BLADE,ROTOR,DWG.303-8428,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300017780 SEAL,LABYRINTH,DWG.423-8969,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300017829 BLADE,ROTOR,DWG.586-3011,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300018068 SEAL,LABYRINTH,DWG.618-1305,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300018134 BLADE,ROTOR,DWG.811-3532,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 100% | – |
| 4300036664 RING,WEAR,DWG.568-4805,FOR PP-1407B | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 100% | – |
| 4300068273 POSITIONER,VALVE,DWG.310-6918,FOR FCV-11 | C | Reduce | Potentially obsolete | 5 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 199.6M |
| 4300058842 POSITIONER,VALVE,DWG.803-1873,FOR PCV-13 | B | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 199.6M |
| 4300049268 POSITIONER,VALVE,DWG.209-1986,FOR PCV-64 | B | Reduce | Slow-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 199.6M |
| 4300015072 POSITIONER,VALVE,DWG.237-6111,FOR FCV-14 | A | Reduce | Non-moving | 6 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 199.6M |
| 4300018516Safety-criticalLong-lead SPRING,SAFETY VALVE,DWG.241-9369,FOR PRV | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 6.3M |
| 4100046802Long-lead DIAPHRAGM,ACTUATOR,MODEL ZF286,MONEL | A | Reduce | Excess | 99 EA | 102 | 67 / 108 | 22 / 37 / 48 | – | 0% | −Rp 197.7M |
| 4100011250 COUPLING,TYPE LD756,A105 | A | Reduce | Non-moving | 25 SET | – | 10 / 27 | 1 / 1 / 2 | – | 0% | −Rp 196.8M |
| 4300037429 COUPLING,DWG.835-1874,FOR PP-500 | A | Reduce | Non-moving | 24 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 196.8M |
| 4100055106Safety-critical SWITCH,LIMIT,SIZE OW112,PTFE | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 6.0M |
| 4100079718 ANCHOR,REFRACTORY,SIZE JU805,SS316 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 624 / 700 / 1,084 | – | 20% | – |
| 4100079532 ANCHOR,REFRACTORY,MODEL CO337,SS304 | A | Monitor | Critical insurance spare | 14 EA | – | 5 / 15 | 624 / 700 / 1,084 | – | 20% | – |
| 4100079183 ANCHOR,REFRACTORY,MODEL CS21,GRAPHITE | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 624 / 700 / 1,084 | – | 20% | – |
| 4300000266 SPRING,SAFETY VALVE,DWG.895-9739,FOR KT- | S | Reduce | Potentially obsolete | 22 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 194.0M |
| 4300036282Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.945-2850,FOR PRV | C | Reduce | Non-moving | 23 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 194.0M |
| 4100073873 CASTABLE,REFRACTORY,INSUL,1500DEG C | A | Reduce | Non-moving | 4,662 KG | – | 0 / 0 | 173 / 181 / 272 | – | 0% | −Rp 174.1M |
| 4300073301 SEAT RING,VALVE,DWG.706-3803,FOR FCV-108 | A | Reduce | Slow-moving | 19 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 191.8M |
| 4300035154 SEAT RING,VALVE,DWG.626-9095,FOR TCV-117 | C | Reduce | Non-moving | 17 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 191.8M |
| 4200004490 TERMINAL BLOCK,MODEL TY966,NBR | C | ReorderNormal | Below reorder point | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 67,918 |
| 4200004878 LAMP,LED,50W,220VAC,T8 | C | Reduce | Potentially obsolete | 477 EA | – | 10 / 24 | 0 / 0 / 2 | – | 0% | −Rp 191.6M |
| 4100033957 FLANGE,SO,4IN,600#,A105,RF | C | Reduce | Potentially obsolete | 205 EA | – | 4 / 7 | don't stock | – | 0% | −Rp 190.2M |
| 4100054712Safety-criticalLong-lead SWITCH,LIMIT,TYPE OX284,PTFE | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 7.6M |
| 4100037231 VALVE,GLOBE,1IN,300#,A105,SW | C | Reduce | Potentially obsolete | 72 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 189.2M |
| 4300030708 SEAL,LABYRINTH,DWG.246-5445,FOR KC-216B | S | Reduce | Excess | 2 SET | – | 0 / 0 | don't stock | – | 24% | −Rp 189.2M |
| 4300002291 SEAL,LABYRINTH,DWG.294-6750,FOR KC-316D | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4100084854 SEAL,LABYRINTH,MODEL KI186,SS304 | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |