Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 57 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100085524 SEAL,LABYRINTH,MODEL QX908,A105 | A | Reduce | Non-moving | 3 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300020035 SEAL,LABYRINTH,DWG.829-1118,FOR KC-435A | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300059965 SEAL,LABYRINTH,DWG.114-7687,FOR KC-620A | B | Reduce | Non-moving | 3 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300036007 SEAL,LABYRINTH,DWG.172-8658,FOR KC-624A | B | Reduce | Non-moving | 3 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300049434 SEAL,LABYRINTH,DWG.596-2256,FOR KC-867D | A | Reduce | Non-moving | 3 SET | – | 3 / 4 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300059637 SEAL,LABYRINTH,DWG.765-9229,FOR KC-984C | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 189.2M |
| 4300059675 SEAL,LABYRINTH,DWG.393-7871,FOR KC-984C | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 189.2M |
| 4300013020 SEAL,LABYRINTH,DWG.342-1559,FOR KT-308B | A | Reduce | Non-moving | 3 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300010539 SEAL,LABYRINTH,DWG.754-9048,FOR KT-383A | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 189.2M |
| 4300011953 SEAL,LABYRINTH,DWG.369-8942,FOR KT-383A | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 189.2M |
| 4300040871 SEAL,LABYRINTH,DWG.607-9608,FOR KT-419A | A | Reduce | Non-moving | 3 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300029759 SEAL,LABYRINTH,DWG.181-1375,FOR KT-447 | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 189.2M |
| 4300005125 SEAL,LABYRINTH,DWG.978-3268,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300006259 SEAL,LABYRINTH,DWG.759-3322,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300070312 SEAL,LABYRINTH,DWG.547-1684,FOR KT-513 | A | Reduce | Non-moving | 3 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4100084824 SEAL,LABYRINTH,SIZE IG59,CS | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 189.2M |
| 4300043785 SEAL,LABYRINTH,DWG.200-6832,FOR KT-778A | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 189.2M |
| 4300022398 SEAL,LABYRINTH,DWG.899-2694,FOR KT-856A | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300022695 SEAL,LABYRINTH,DWG.241-8523,FOR KT-856A | A | Reduce | Non-moving | 3 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300023699 SEAL,LABYRINTH,DWG.666-3167,FOR KT-856A | A | Reduce | Non-moving | 3 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4100006048 SEAL,MECHANICAL,MODEL AW550,MONEL | A | Reduce | Non-moving | 4 SET | – | 3 / 7 | 1 / 1 / 2 | – | 0% | −Rp 189.2M |
| 4100006557 SEAL,MECHANICAL,SIZE NX293,MONEL | A | Reduce | Non-moving | 3 SET | – | 3 / 4 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4100006201 SEAL,MECHANICAL,MODEL XV942,MONEL | B | Reduce | Non-moving | 3 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4100024419Safety-criticalSign-off STUDBOLT,5/8INX115MM,B7/2H | A | Reduce | Excess | 1,869 EA | – | 34 / 65 | 59 / 70 / 219 | – | 0% | −Rp 188.8M |
| 4300027923 COUPLING,DWG.907-5341,FOR KC-486 | S | Reduce | Potentially obsolete | 22 SET | – | 10 / 26 | don't stock | – | 0% | −Rp 188.2M |
| 4100046824Long-lead DIAPHRAGM,ACTUATOR,MODEL VI156,A182F11 | A | Reduce | Excess | 85 EA | 8 | 18 / 46 | 9 / 12 / 20 | – | 0% | −Rp 185.8M |
| 4300072264Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.335-8199,FOR PRV | C | Reduce | Non-moving | 22 EA | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 185.2M |
| 4100079779 ANCHOR,REFRACTORY,MODEL NJ734,A105 | A | Monitor | Critical insurance spare | 7 EA | – | 4 / 12 | 629 / 700 / 1,072 | – | 18% | – |
| 4300067431Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.992-2160,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 182.5M |
| 4100074660 CASTABLE,REFRACTORY,LW,1500DEG C | A | Monitor | Insurance gap | 0 KG | – | 10 / 30 | 163 / 181 / 296 | – | 18% | – |
| 4100075234 CASTABLE,REFRACTORY,LW,1500DEG C | A | Monitor | Insurance gap | 0 KG | – | 0 / 0 | 163 / 181 / 296 | – | 18% | – |
| 4100085265 SEAL,LABYRINTH,SIZE AU946,INCOLOY | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 18% | – |
| 4100052857Safety-criticalSign-off SOLENOID VALVE,TYPE LG594,A105 | S | Reduce | Non-moving | 17 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 180.6M |
| 4300027520 SEAT RING,VALVE,DWG.917-1646,FOR FCV-832 | S | Reduce | Potentially obsolete | 16 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 180.5M |
| 4300053043 SEAT RING,VALVE,DWG.577-6098,FOR LCV-100 | S | Reduce | Potentially obsolete | 16 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 180.5M |
| 4300030606 SEAT RING,VALVE,DWG.540-2136,FOR PCV-885 | S | Reduce | Potentially obsolete | 16 EA | – | 5 / 14 | don't stock | – | 0% | −Rp 180.5M |
| 4300045397 RING,WEAR,DWG.467-9717,FOR PP-1115 | A | Reduce | Non-moving | 23 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 180.1M |
| 4100046969 DIAPHRAGM,ACTUATOR,MODEL CD343,A105 | A | Reduce | Slow-moving | 50 EA | – | 2 / 3 | 5 / 6 / 9 | – | 0% | −Rp 179.7M |
| 4300020329Long-lead TRIM SET,CONTROL VALVE,DWG.638-3732,FOR | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 179.6M |
| 4100015228 GASKET,RING,2IN,150#,GR/304 | A | Reduce | Non-moving | 839 EA | – | 10 / 30 | 4 / 4 / 8 | – | 0% | −Rp 178.2M |
| 4100075925 CERAMIC FIBER,BLANKET,25T,96KG/M3,1260C | A | Reduce | Non-moving | 136 RL | – | 10 / 24 | 2 / 2 / 4 | – | 0% | −Rp 175.7M |
| 4300024908Safety-criticalSign-off DISC,SAFETY VALVE,DWG.421-9505,FOR PRV-1 | S | Reduce | Non-moving | 15 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 175.6M |
| 4100064968 GAUGE,PRESSURE,0-16KG/CM2,4IN DIAL | C | Reduce | Potentially obsolete | 66 EA | – | 10 / 28 | don't stock | – | 0% | −Rp 175.3M |
| 4100057551 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART | C | Reduce | Slow-moving | 2 EA | 2 | 1 / 2 | don't stock | – | 0% | −Rp 174.4M |
| 4100074260 CASTABLE,REFRACTORY,DENSE,1600DEG C | A | Monitor | Insurance gap | 0 KG | – | 0 / 0 | 164 / 181 / 289 | – | 17% | – |
| 4100018925 GASKET,SW,1IN,300#,GRAPHITE | C | Reduce | Potentially obsolete | 804 EA | – | 10 / 25 | don't stock | – | 0% | −Rp 172.4M |
| 4100037703 VALVE,GLOBE,1/2IN,150#,A216WCB,SW | C | Reduce | Slow-moving | 66 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 170.8M |
| 4100055535Long-lead TRANSMITTER,PRESS,TYPE JZ960,CS | A | Reduce | Excess | 17 EA | – | 3 / 7 | 5 / 6 / 9 | – | 0% | −Rp 170.8M |
| 4100084860 SEAL,LABYRINTH,MODEL TI958,SS316 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 17% | – |
| 4100056059 TRANSMITTER,PRESS,SIZE IA372,A105 | C | Reduce | Potentially obsolete | 5 EA | – | 4 / 7 | don't stock | – | 0% | −Rp 170.7M |