Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 58 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100057879 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF | A | Reduce | Non-moving | 6 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 170.7M |
| 4100055881 TRANSMITTER,PRESS,SIZE EH447,A105 | C | Reduce | Slow-moving | 5 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 170.7M |
| 4100060694 TRANSMITTER,TEMP,TYPE NY829,INCOLOY | A | Reduce | Non-moving | 6 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 170.7M |
| 4100060142 TRANSMITTER,TEMP,TYPE NN961,SS316 | S | Reduce | Potentially obsolete | 5 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 170.7M |
| 4100059103 TRANSMITTER,TEMP,TYPE UH835,GRAPHITE | B | Reduce | Non-moving | 6 EA | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 170.7M |
| 4100056007 TRANSMITTER,PRESS,MODEL BV481,NBR | C | Reduce | Potentially obsolete | 5 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 170.7M |
| 4100058184 TRANSMITTER,DIFF.PRESS,0~500MMH2O,HART | B | Reduce | Non-moving | 5 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 170.7M |
| 4100074080 CASTABLE,REFRACTORY,LW,1700DEG C | A | Monitor | Critical insurance spare | 2 KG | – | 1 / 2 | 165 / 181 / 288 | – | 17% | – |
| 4100029697 ELBOW,90DEG,12IN,SCH40,SS316,BW | A | Reduce | Excess | 350 EA | – | 60 / 141 | 22 / 30 / 84 | – | 0% | −Rp 169.7M |
| 4100097230 DEMISTER PAD,MODEL YU588,MONEL | S | Reduce | Potentially obsolete | 11 EA | – | 4 / 9 | don't stock | – | 0% | −Rp 169.7M |
| 4100052144Safety-criticalSign-off SOLENOID VALVE,TYPE HM580,SS316 | B | Reduce | Non-moving | 16 EA | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 169.3M |
| 4200010990 FAN,COOLING MOTOR,DWG.564-6327,FOR PP-13 | C | Reduce | Potentially obsolete | 135 EA | – | 4 / 7 | don't stock | – | 0% | −Rp 169.2M |
| 4300022059 SEAT RING,VALVE,DWG.103-5575,FOR FCV-104 | B | Reduce | Non-moving | 16 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 169.2M |
| 4100061797 THERMOCOUPLE,K-1ELMNT,3.2X2600LG | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 2 / 2 / 4 | – | 17% | – |
| 4300013493 SPRING,SAFETY VALVE,DWG.882-9675,FOR KT- | A | Reduce | Non-moving | 20 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 167.6M |
| 4300071484Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.492-7644,FOR PRV | S | Reduce | Non-moving | 20 EA | – | 5 / 14 | 0 / 0 / 1 | – | 0% | −Rp 167.6M |
| 4300049297 RING,WEAR,DWG.969-4928,FOR PP-1758A | C | Reduce | Potentially obsolete | 12 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 166.6M |
| 4100069058Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,TYPE OD677,A105 | S | Reduce | Non-moving | 19 EA | – | 10 / 22 | 0 / 0 / 1 | – | 0% | −Rp 166.2M |
| 4300023527 BEARING,JOURNAL,DWG.466-6546,FOR KT-856A | A | Reduce | Excess | 3 SET | 2 | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 166.1M |
| 4100043468Long-lead TRIM SET,CONTROL VALVE,SIZE QH233,GRAPHI | B | Reduce | Slow-moving | 5 SET | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 165.6M |
| 4100098291 SCREW,TAPPING,M5X16MM,SS304 | A | Monitor | Critical insurance spare | 1 EA | – | 2 / 5 | 213 / 234 / 620 | – | 17% | – |
| 4100028553 PIPE,10IN,SCH80,P11,SMLS,6M LG | C | Reduce | Potentially obsolete | 96 LG | – | 2 / 5 | don't stock | – | 0% | −Rp 164.3M |
| 4300037563 SEAT RING,VALVE,DWG.670-6373,FOR PCV-186 | S | Reduce | Slow-moving | 3 EA | 1 | 0 / 0 | don't stock | – | 0% | −Rp 163.8M |
| 4300038550 RING,WEAR,DWG.620-8889,FOR PP-123 | B | Reduce | Non-moving | 21 EA | – | 10 / 22 | 0 / 0 / 1 | – | 0% | −Rp 163.7M |
| 4100079652 ANCHOR,REFRACTORY,MODEL YO985,SS316 | A | Monitor | Critical insurance spare | 9 EA | – | 3 / 9 | 638 / 700 / 1,050 | – | 16% | – |
| 4100017120Safety-critical GASKET,SW,12IN,600#,GR/304 | A | ReorderNormal | Slow-moving | 4 EA | – | 1 / 2 | 4 / 4 / 7 | 3 by 01 Oct 2026 | 0% | Rp 643,361 |
| 4300008011Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,DWG.353-6797,FOR PRV | A | Reduce | Slow-moving | 11 EA | 2 | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 162.7M |
| 4100010930 COUPLING,SIZE AC401,A182F11 | A | Reduce | Non-moving | 21 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 162.5M |
| 4300024589 COUPLING,DWG.711-2389,FOR PP-1769A | A | Reduce | Non-moving | 20 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 162.5M |
| 4300025486Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,DWG.392-3943,FOR PRV-3 | S | Reduce | Slow-moving | 7 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 162.2M |
| 4100074948 CASTABLE,REFRACTORY,LW,1500DEG C | A | Monitor | Insurance gap | 0 KG | – | 0 / 0 | 166 / 181 / 281 | – | 16% | – |
| 4100074772 CASTABLE,REFRACTORY,DENSE,1500DEG C | A | Monitor | Insurance gap | 0 KG | – | 0 / 0 | 166 / 181 / 281 | – | 16% | – |
| 4200011537 FAN,COOLING MOTOR,DWG.426-3869,FOR KC-62 | A | Reduce | Non-moving | 130 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 160.4M |
| 4300021541 POSITIONER,VALVE,DWG.834-3196,FOR FCV-10 | B | Reduce | Non-moving | 4 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 159.7M |
| 4300026926 POSITIONER,VALVE,DWG.849-8223,FOR FCV-11 | A | Reduce | Non-moving | 4 EA | – | 4 / 7 | don't stock | – | 0% | −Rp 159.7M |
| 4300045157 POSITIONER,VALVE,DWG.748-8864,FOR FCV-11 | C | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4300055137 POSITIONER,VALVE,DWG.403-6476,FOR FCV-12 | C | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4300014185 POSITIONER,VALVE,DWG.920-8325,FOR FCV-16 | C | Reduce | Slow-moving | 4 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 159.7M |
| 4300071320 POSITIONER,VALVE,DWG.648-2509,FOR FCV-87 | C | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4300068341 POSITIONER,VALVE,DWG.204-4800,FOR LCV-15 | B | Reduce | Non-moving | 4 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 159.7M |
| 4300031017 POSITIONER,VALVE,DWG.121-6684,FOR LCV-17 | C | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4300038656 POSITIONER,VALVE,DWG.210-3130,FOR LCV-19 | A | Reduce | Non-moving | 5 EA | – | 10 / 31 | 0 / 0 / 1 | – | 0% | −Rp 159.7M |
| 4300024082 POSITIONER,VALVE,DWG.193-2350,FOR LCV-48 | B | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4300029120 POSITIONER,VALVE,DWG.676-4357,FOR PCV-10 | B | Reduce | Non-moving | 4 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 159.7M |
| 4300051550 POSITIONER,VALVE,DWG.106-6484,FOR PCV-11 | A | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4100048905 POSITIONER,VALVE,MODEL ZR955,NBR | A | Reduce | Non-moving | 4 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 159.7M |
| 4100050067 POSITIONER,VALVE,MODEL MU548,INCOLOY | C | Reduce | Potentially obsolete | 4 EA | – | 3 / 5 | don't stock | – | 0% | −Rp 159.7M |
| 4100049669 POSITIONER,VALVE,SIZE HR935,A182F11 | C | Reduce | Excess | 5 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 159.7M |
| 4300009107 POSITIONER,VALVE,DWG.512-6484,FOR PCV-49 | A | Reduce | Non-moving | 4 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 159.7M |
| 4300002502 POSITIONER,VALVE,DWG.210-9005,FOR PCV-53 | S | Reduce | Slow-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |