Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 65 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300015867 SEAL,LABYRINTH,DWG.580-4632,FOR KC-854C | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300016346 SEAL,LABYRINTH,DWG.966-3802,FOR KC-879A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 94.6M |
| 4300051029 SEAL,LABYRINTH,DWG.747-8234,FOR KC-891A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 94.6M |
| 4100085612 SEAL,LABYRINTH,TYPE TW791,MONEL | A | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300017397 SEAL,LABYRINTH,DWG.108-6739,FOR KT-264A | S | Reduce | Non-moving | 1 SET | – | 0 / 0 | don't stock | – | 4% | −Rp 94.6M |
| 4300011834 SEAL,LABYRINTH,DWG.792-3052,FOR KT-383A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 94.6M |
| 4300012026 SEAL,LABYRINTH,DWG.305-1729,FOR KT-383A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 94.6M |
| 4300069834 SEAL,LABYRINTH,DWG.772-2728,FOR KT-513 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300070153 SEAL,LABYRINTH,DWG.434-3305,FOR KT-513 | A | Reduce | Non-moving | 2 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300033114 SEAL,LABYRINTH,DWG.584-9348,FOR KT-624A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 94.6M |
| 4300033237 SEAL,LABYRINTH,DWG.546-5030,FOR KT-624A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 94.6M |
| 4300022130 SEAL,LABYRINTH,DWG.308-3493,FOR KT-856A | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300062772 SEAL,LABYRINTH,DWG.851-4962,FOR KT-875 | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 94.6M |
| 4100005970 SEAL,MECHANICAL,MODEL WS708,GRAPHITE | A | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4100006643 SEAL,MECHANICAL,MODEL ZV418,A105 | A | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4100005349 SEAL,MECHANICAL,MODEL HV667,MONEL | A | Reduce | Slow-moving | 5 SET | – | 0 / 0 | 3 / 3 / 4 | – | 0% | −Rp 94.6M |
| 4100006221 SEAL,MECHANICAL,MODEL LK224,NBR | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300053392 COUPLING,DWG.739-5312,FOR KC-773A | S | Reduce | Potentially obsolete | 11 SET | – | 10 / 26 | don't stock | – | 0% | −Rp 94.1M |
| 4300068800 COUPLING,DWG.651-4324,FOR PP-1890 | A | Reduce | Non-moving | 12 SET | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 94.1M |
| 4100018161 GASKET,SW,2IN,600#,GRAPHITE | A | Monitor | Insurance gap | 0 EA | – | 5 / 7 | 7 / 7 / 11 | – | 9% | – |
| 4100072088 FIREBRICK,INSUL,28,65T,114W,230L | A | Monitor | Critical insurance spare | 15 EA | – | 3 / 6 | 358 / 396 / 792 | – | 9% | – |
| 4100072599 FIREBRICK,INSUL,23,65T,114W,230L | A | Monitor | Critical insurance spare | 4 EA | – | 1 / 3 | 358 / 396 / 792 | – | 9% | – |
| 4100072111Long-lead FIREBRICK,INSUL,23,76T,114W,230L | A | Monitor | Critical insurance spare | 8 EA | – | 3 / 8 | 358 / 396 / 792 | – | 9% | – |
| 4100100104 BOLT,ANCHOR,TYPE KC122,CS | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 3 / 3 / 5 | – | 9% | – |
| 4100073668 CASTABLE,REFRACTORY,LW,1500DEG C | A | Monitor | Critical insurance spare | 41 KG | – | 0 / 0 | 173 / 181 / 272 | – | 9% | – |
| 4300011115 SEAL,LABYRINTH,DWG.371-2284,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 1 / 3 | don't stock | – | 47% | – |
| 4100078674 BURNER TIP,SIZE FR884,MONEL | B | Reduce | Non-moving | 7 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 93.0M |
| 4300035665 BEARING,JOURNAL,DWG.777-8151,FOR KC-422A | S | Reduce | Slow-moving | 1 SET | 2 | 0 / 0 | don't stock | – | 0% | −Rp 92.7M |
| 4100034656Long-lead VALVE,GATE,1/2IN,300#,A216WCB,RF | A | Reduce | Excess | 129 EA | 50 | 2 / 3 | 27 / 34 / 54 | – | 0% | −Rp 92.6M |
| 4100029275 PIPE,2IN,SCH40,CS,SMLS,6M LG | C | Reduce | Potentially obsolete | 54 LG | – | 2 / 3 | don't stock | – | 0% | −Rp 92.4M |
| 4100047769 DIAPHRAGM,ACTUATOR,TYPE DA740,NBR | C | Reduce | Potentially obsolete | 21 EA | – | 10 / 21 | don't stock | – | 0% | −Rp 92.1M |
| 4100076877 CERAMIC FIBER,BLANKET,25T,128KG/M3,1430C | A | Reduce | Non-moving | 74 RL | – | 1 / 2 | 3 / 3 / 5 | – | 0% | −Rp 86.5M |
| 4100031298 TEE,1IN,3000#,A105,SW | A | Reduce | Excess | 113 EA | – | 46 / 144 | 17 / 21 / 43 | – | 0% | −Rp 91.4M |
| 4100074609 CASTABLE,REFRACTORY,LW,1300DEG C | A | Monitor | Insurance gap | 0 KG | – | 1 / 3 | 173 / 181 / 272 | – | 9% | – |
| 4300001936Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,DWG.631-2337,FOR PRV-2 | A | Reduce | Excess | 15 EA | 3 | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 90.4M |
| 4300036556 SEAT RING,VALVE,DWG.363-3364,FOR FCV-190 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 90.2M |
| 4300050016 POSITIONER,VALVE,DWG.566-3412,FOR TCV-44 | C | Monitor | Stockout | 0 EA | 1 | 1 / 2 | 0 / 0 / 3 | reorder ~17 Feb 2027 | 20% | – |
| 4300026169 RING,WEAR,DWG.836-4588,FOR PP-915A | A | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 90.0M |
| 4100013155 RING,WEAR,MODEL MY355,GRAPHITE | S | Reduce | Potentially obsolete | 11 EA | – | 4 / 12 | don't stock | – | 0% | −Rp 90.0M |
| 4100102741 ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-A | C | TransferNormal | Below reorder point | 1 CAN | – | 1 / 2 | 1 / 1 / 2 | transfer 1 from 4100102415 | 0% | – |
| 4100015280 GASKET,SHEET,1/2IN,300#,GRAPHITE | C | Reduce | Potentially obsolete | 421 EA | – | 5 / 11 | 0 / 0 / 4 | – | 0% | −Rp 89.4M |
| 4300027365Long-lead POSITIONER,VALVE,DWG.939-3221,FOR FCV-60 | A | Reduce | Non-moving | 2 EA | 1 | 1 / 2 | don't stock | – | 0% | −Rp 89.3M |
| 4300059272 SLEEVE,SHAFT,DWG.696-4283,FOR PP-413 | B | Reduce | Non-moving | 13 EA | – | 3 / 7 | 1 / 1 / 2 | – | 0% | −Rp 89.0M |
| 4300018421 SPRING,SAFETY VALVE,DWG.550-4287,FOR KT- | S | Reduce | Potentially obsolete | 10 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 88.2M |
| 4300013008 SPRING,SAFETY VALVE,DWG.944-8529,FOR KT- | A | Reduce | Non-moving | 11 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 88.2M |
| 4300004961 SPRING,SAFETY VALVE,DWG.972-8547,FOR KT- | A | Reduce | Non-moving | 12 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 88.2M |
| 4300009017Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.489-7285,FOR PRV | S | Reduce | Non-moving | 11 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 88.2M |
| 4300010076 TRIM SET,CONTROL VALVE,DWG.251-1444,FOR | C | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 88.0M |
| 4100062038 THERMOCOUPLE,J-1ELMNT,8X1700LG | A | Monitor | Insurance gap | 0 EA | – | 10 / 24 | 2 / 2 / 3 | – | 9% | – |
| 4100068603Safety-criticalSign-off DISC,SAFETY VALVE,TYPE AN114,VITON | S | Reduce | Non-moving | 8 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 87.8M |