Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 36 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300053182Sign-off IMPELLER,DWG.960-2282,FOR PP-1575A | A | Reduce | Non-moving | 13 EA | – | 5 / 11 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300027472Sign-off COUPLING,DWG.768-3013,FOR PP-1720D | C | Reduce | Potentially obsolete | 143 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.2B |
| 4300028421Long-leadSign-off TRIM SET,CONTROL VALVE,DWG.137-9702,FOR | A | Reduce | Excess | 13 SET | 2 | 0 / 0 | 3 / 3 / 4 | – | 0% | −Rp 1.2B |
| 4300025819Sign-off POSITIONER,VALVE,DWG.786-7928,FOR PCV-82 | A | Reduce | Non-moving | 30 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.2B |
| 4100056355Sign-off TRANSMITTER,PRESS,TYPE UT381,MONEL | C | Reduce | Potentially obsolete | 35 EA | – | 5 / 14 | don't stock | – | 0% | −Rp 1.2B |
| 4100090932Sign-off VALVE,GOVERNOR,MODEL YD345,A105 | S | Reduce | Potentially obsolete | 5 ASS | – | 2 / 5 | don't stock | – | 0% | −Rp 1.2B |
| 4300030045Sign-off VALVE,GOVERNOR,DWG.257-7987,FOR KT-447 | S | Reduce | Potentially obsolete | 5 ASS | – | 4 / 6 | don't stock | – | 0% | −Rp 1.2B |
| 4300062655Sign-off VALVE,GOVERNOR,DWG.704-1800,FOR KT-875 | S | Reduce | Potentially obsolete | 5 ASS | – | 2 / 6 | don't stock | – | 0% | −Rp 1.2B |
| 4100060304Sign-off TRANSMITTER,TEMP,SIZE YT593,GRAPHITE | C | Reduce | Excess | 76 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 1.2B |
| 4100054572Safety-criticalSign-off SWITCH,LIMIT,SIZE DO863,NBR | S | Reduce | Non-moving | 201 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 1.2B |
| 4100052068Safety-criticalSign-off SOLENOID VALVE,MODEL GH207,GRAPHITE | A | Reduce | Non-moving | 107 EA | – | 3 / 10 | 1 / 1 / 2 | – | 0% | −Rp 1.2B |
| 4300063819Sign-off COUPLING,DWG.651-9333,FOR PP-1269A | A | Reduce | Non-moving | 139 SET | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300008898Sign-off TRIM SET,CONTROL VALVE,DWG.855-1910,FOR | B | Reduce | Non-moving | 15 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.2B |
| 4300028764Sign-off TRIM SET,CONTROL VALVE,DWG.297-7863,FOR | C | Reduce | Potentially obsolete | 15 SET | – | 3 / 10 | don't stock | – | 0% | −Rp 1.2B |
| 4100044829Sign-off TRIM SET,CONTROL VALVE,SIZE ZO48,A105 | A | Reduce | Non-moving | 16 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300008736Sign-off TRIM SET,CONTROL VALVE,DWG.439-7290,FOR | S | Reduce | Potentially obsolete | 6 SET | 1 | 3 / 5 | don't stock | – | 0% | −Rp 1.2B |
| 4100038836 VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316 | C | TransferNormal | Below reorder point | 1 EA | – | 1 / 3 | 1 / 1 / 2 | transfer 1 from 4100038989 | 0% | – |
| 4100034740Sign-off VALVE,GATE,1IN,150#,A216WCB,SW | S | Reduce | Excess | 131 EA | 7 | 2 / 6 | 2 / 2 / 6 | – | 0% | −Rp 1.2B |
| 4300001653Sign-off BLADE,ROTOR,DWG.258-8963,FOR KT-202 | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300013389Sign-off BLADE,ROTOR,DWG.744-9022,FOR KT-308B | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300010305Sign-off BLADE,ROTOR,DWG.914-6586,FOR KT-383A | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4100088887Sign-off BLADE,ROTOR,MODEL GJ23,INCOLOY | S | Reduce | Potentially obsolete | 3 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 1.1B |
| 4300069428Sign-off BLADE,ROTOR,DWG.415-2527,FOR KT-513 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300069875Sign-off BLADE,ROTOR,DWG.237-1746,FOR KT-513 | A | Reduce | Slow-moving | 7 SET | – | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 1.1B |
| 4300062392Sign-off BLADE,ROTOR,DWG.115-2618,FOR KT-875 | S | Reduce | Potentially obsolete | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300042119Sign-off SEAL,LABYRINTH,DWG.399-2779,FOR KC-801 | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100085875Sign-off SEAL,LABYRINTH,TYPE JP581,A105 | A | Reduce | Non-moving | 13 SET | – | 10 / 30 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300069765Sign-off SEAL,LABYRINTH,DWG.960-4309,FOR KT-513 | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100006762Sign-off SEAL,MECHANICAL,MODEL ZT596,VITON | C | Reduce | Potentially obsolete | 12 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 1.1B |
| 4100054029Safety-criticalSign-off SWITCH,LIMIT,MODEL FP829,SS316 | A | Reduce | Non-moving | 192 EA | – | 4 / 7 | 0 / 0 / 2 | – | 0% | −Rp 1.1B |
| 4100060032Sign-off TRANSMITTER,TEMP,TYPE XW845,MONEL | A | Reduce | Non-moving | 34 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300035206Sign-off IMPELLER,DWG.471-5834,FOR PP-508D | A | Reduce | Non-moving | 11 EA | – | 10 / 29 | don't stock | – | 0% | −Rp 1.1B |
| 4300065290Sign-off IMPELLER,DWG.747-8400,FOR PP-805B | B | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300058257Sign-off IMPELLER,DWG.903-8672,FOR PP-900A | A | Reduce | Non-moving | 12 EA | – | 5 / 14 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100001810Long-lead BEARING,ROLLER,CYL,1ROW,7212BDB | B | ReorderNormal | Below reorder point | 5 EA | – | 1 / 3 | 6 / 6 / 9 | 4 by 01 Oct 2026 | 0% | Rp 1.5M |
| 4100078533Sign-off BURNER TIP,MODEL PU160,A105 | A | Reduce | Non-moving | 75 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 1.1B |
| 4100015829 GASKET,SHEET,10IN,150#,GR/304 | B | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 428,908 |
| 4300008904Sign-off SEAT RING,VALVE,DWG.314-9080,FOR FCV-127 | A | Reduce | Non-moving | 99 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300047690Sign-off SEAT RING,VALVE,DWG.481-6913,FOR PCV-629 | A | Reduce | Non-moving | 99 EA | – | 5 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300053200Sign-off TRIM SET,CONTROL VALVE,DWG.811-3912,FOR | B | Reduce | Non-moving | 14 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 1.1B |
| 4300052411Sign-off TRIM SET,CONTROL VALVE,DWG.585-2014,FOR | B | Reduce | Non-moving | 14 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300044768Sign-off BEARING,THRUST PAD,DWG.361-6679,FOR KC-2 | B | Reduce | Non-moving | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300074594Sign-off BEARING,JOURNAL,DWG.436-7360,FOR KC-226 | A | Reduce | Non-moving | 6 SET | – | 4 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300057594Sign-off BEARING,THRUST PAD,DWG.918-5139,FOR KC-2 | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300025922Sign-off BEARING,JOURNAL,DWG.781-5184,FOR KC-247A | A | Reduce | Non-moving | 6 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100083032Sign-off BEARING,THRUST PAD,MODEL SR125,INCOLOY | A | Reduce | Non-moving | 6 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300007525Sign-off BEARING,THRUST PAD,DWG.152-7649,FOR KC-3 | S | Reduce | Potentially obsolete | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300024208Sign-off BEARING,JOURNAL,DWG.439-9310,FOR KC-373 | S | Reduce | Potentially obsolete | 5 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 1.1B |
| 4300015606Sign-off BEARING,THRUST PAD,DWG.892-1703,FOR KC-3 | A | Reduce | Non-moving | 6 SET | – | 5 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300046295Sign-off BEARING,JOURNAL,DWG.841-5970,FOR KC-538 | S | Reduce | Excess | 5 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 1.1B |