Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 35 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300072305Sign-off TRIM SET,CONTROL VALVE,DWG.926-8944,FOR | C | Reduce | Potentially obsolete | 18 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.4B |
| 4300028691Long-lead SEAL,LABYRINTH,DWG.909-2064,FOR KC-419A | A | ReorderNormal | Slow-moving | 2 SET | 2 | 0 / 0 | 4 / 4 / 5 | 1 by 01 Oct 2026 | 0% | Rp 94.6M |
| 4100054828Safety-criticalLong-lead SWITCH,LIMIT,MODEL NG637,INCOLOY | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 13.9M |
| 4300035187Sign-off TRIM SET,CONTROL VALVE,DWG.274-8443,FOR | C | Reduce | Non-moving | 29 SET | 2 | 4 / 13 | don't stock | – | 0% | −Rp 1.4B |
| 4300067563Safety-criticalSign-off DISC,SAFETY VALVE,DWG.869-6806,FOR PRV-6 | S | Reduce | Non-moving | 111 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.4B |
| 4300055933 IMPELLER,DWG.464-2602,FOR PP-200A | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 102.1M |
| 4100038317Sign-off VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316 | A | Reduce | Excess | 520 EA | – | 4 / 13 | 6 / 6 / 9 | – | 0% | −Rp 1.3B |
| 4300024915 DEMISTER PAD,DWG.431-5597,FOR VD-1044 | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 30.9M |
| 4100043475Sign-off TRIM SET,CONTROL VALVE,TYPE DM761,PTFE | A | Reduce | Non-moving | 18 SET | – | 5 / 12 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300051414Sign-off TRIM SET,CONTROL VALVE,DWG.683-1894,FOR | C | Reduce | Potentially obsolete | 17 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4100056873Sign-off TRANSMITTER,PRESS,MODEL RY162,CS | C | Reduce | Potentially obsolete | 39 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300063252Sign-off SEAT RING,VALVE,DWG.450-5515,FOR FCV-118 | A | Reduce | Non-moving | 119 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300041390Sign-off IMPELLER,DWG.743-4153,FOR PP-1323 | A | Reduce | Non-moving | 13 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 1.3B |
| 4300052275Sign-off DEMISTER PAD,DWG.719-5055,FOR CL-1871 | B | Reduce | Non-moving | 87 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300033490Sign-off SEAL,LABYRINTH,DWG.324-2695,FOR KT-624A | S | Reduce | Potentially obsolete | 14 SET | – | 4 / 6 | don't stock | – | 0% | −Rp 1.3B |
| 4100053125Safety-criticalSign-off SOLENOID VALVE,TYPE GE269,NBR | C | Reduce | Non-moving | 118 EA | – | 10 / 15 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300051506Sign-off COUPLING,DWG.412-9206,FOR PP-1224A | A | Reduce | Non-moving | 155 SET | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300044717Sign-off BEARING,JOURNAL,DWG.638-2911,FOR KC-225D | B | Reduce | Non-moving | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300025997Sign-off BEARING,THRUST PAD,DWG.598-9847,FOR KC-2 | A | Reduce | Non-moving | 7 SET | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4100083688Sign-off BEARING,THRUST PAD,SIZE FC451,PTFE | S | Reduce | Potentially obsolete | 6 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 1.3B |
| 4300024472Sign-off BEARING,JOURNAL,DWG.484-8331,FOR KC-426D | A | Reduce | Non-moving | 6 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 1.3B |
| 4300020021Sign-off BEARING,THRUST PAD,DWG.634-3756,FOR KC-4 | A | Reduce | Non-moving | 6 SET | – | 4 / 10 | don't stock | – | 0% | −Rp 1.3B |
| 4100081693Sign-off BEARING,JOURNAL,SIZE CR941,PTFE | A | Reduce | Non-moving | 7 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300056625Sign-off BEARING,THRUST PAD,DWG.217-5661,FOR KC-4 | A | Reduce | Non-moving | 7 SET | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300006955Sign-off BEARING,JOURNAL,DWG.110-2159,FOR KC-536A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300006566Sign-off BEARING,THRUST PAD,DWG.830-4426,FOR KC-6 | A | Reduce | Non-moving | 6 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 1.3B |
| 4300068129Sign-off BEARING,THRUST PAD,DWG.286-7188,FOR KC-7 | A | Reduce | Non-moving | 7 SET | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300020231Sign-off BEARING,JOURNAL,DWG.579-9524,FOR KC-730 | S | Reduce | Potentially obsolete | 6 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 1.3B |
| 4300044563Sign-off BEARING,JOURNAL,DWG.459-6496,FOR KC-752A | A | Reduce | Non-moving | 7 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300056760Sign-off BEARING,JOURNAL,DWG.208-5372,FOR KC-856A | S | Reduce | Potentially obsolete | 6 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 1.3B |
| 4300017845Sign-off BEARING,JOURNAL,DWG.885-8191,FOR KT-264A | S | Reduce | Non-moving | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300013133Sign-off BEARING,THRUST PAD,DWG.534-8702,FOR KT-3 | A | Reduce | Non-moving | 7 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300011902Sign-off BEARING,THRUST PAD,DWG.367-5251,FOR KT-3 | S | Reduce | Potentially obsolete | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4100084429Sign-off BEARING,THRUST PAD,TYPE JQ628,CS | S | Reduce | Potentially obsolete | 6 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 1.3B |
| 4300003349Sign-off BEARING,THRUST PAD,DWG.424-7639,FOR KT-3 | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300004763Sign-off BEARING,JOURNAL,DWG.739-4923,FOR KT-397A | A | Reduce | Non-moving | 7 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300040185Sign-off BEARING,JOURNAL,DWG.958-8638,FOR KT-419A | A | Reduce | Non-moving | 7 SET | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300032988Sign-off BEARING,THRUST PAD,DWG.143-7475,FOR KT-6 | S | Reduce | Potentially obsolete | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300022638Sign-off BEARING,JOURNAL,DWG.761-8071,FOR KT-856A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300062995Sign-off BEARING,THRUST PAD,DWG.824-9331,FOR KT-8 | S | Reduce | Potentially obsolete | 6 SET | – | 3 / 8 | don't stock | – | 0% | −Rp 1.3B |
| 4100034556Long-leadSign-off VALVE,GATE,1-1/2IN,300#,CF8,RF | A | Reduce | Excess | 287 EA | 1,326 | 82 / 247 | 61 / 101 / 121 | – | 0% | −Rp 1.3B |
| 4300064530Sign-off TRIM SET,CONTROL VALVE,DWG.569-8706,FOR | C | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300045259Sign-off TRIM SET,CONTROL VALVE,DWG.886-3613,FOR | C | Reduce | Potentially obsolete | 16 SET | – | 5 / 11 | don't stock | – | 0% | −Rp 1.3B |
| 4300065098Sign-off TRIM SET,CONTROL VALVE,DWG.962-8139,FOR | B | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300064696Sign-off TRIM SET,CONTROL VALVE,DWG.874-7438,FOR | B | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4100066587Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,TYPE IM339,A105 | S | Reduce | Slow-moving | 44 EA | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 1.2B |
| 4100084699Sign-off SEAL,LABYRINTH,TYPE NE801,NBR | A | Reduce | Non-moving | 14 SET | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4100005796Sign-off SEAL,MECHANICAL,TYPE NA301,MONEL | A | Reduce | Non-moving | 14 SET | – | 5 / 15 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300049667Sign-off IMPELLER,DWG.382-5149,FOR PP-1106A | C | Reduce | Excess | 15 EA | – | 0 / 0 | 1 / 2 / 3 | – | 0% | −Rp 1.2B |
| 4100008297Sign-off IMPELLER,MODEL PQ202,CS | B | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |