Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 73 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300035924 COUPLING,DWG.572-6975,FOR KC-624A | B | Reduce | Non-moving | 7 SET | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 51.3M |
| 4100062032 THERMOCOUPLE,J-1ELMNT,3.2X2300LG | S | Reduce | Potentially obsolete | 8 EA | – | 5 / 13 | don't stock | – | 0% | −Rp 51.2M |
| 4100062537 THERMOCOUPLE,K-1ELMNT,3.2X800LG | A | Reduce | Non-moving | 9 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 51.2M |
| 4300037432Long-lead IMPELLER,DWG.461-5488,FOR PP-500 | A | Reduce | Non-moving | 2 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 51.0M |
| 4100083258 BEARING,THRUST PAD,SIZE ZB806,GRAPHITE | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 5% | – |
| 4100025778 STUDBOLT,1INX95MM,B8M/8M | A | Monitor | Critical insurance spare | 22 EA | – | 10 / 21 | 53 / 54 / 81 | – | 5% | – |
| 4100076153 CERAMIC FIBER,BLANKET,25T,128KG/M3,1430C | A | Monitor | Critical insurance spare | 2 RL | – | 1 / 2 | 4 / 4 / 7 | – | 5% | – |
| 4300048153Safety-criticalSign-off DISC,SAFETY VALVE,DWG.742-4836,FOR PRV-1 | S | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 50.2M |
| 4100068165Safety-criticalSign-off DISC,SAFETY VALVE,MODEL VN981,CS | S | Reduce | Non-moving | 5 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 50.2M |
| 4300008272Safety-criticalSign-off DISC,SAFETY VALVE,DWG.965-2769,FOR PRV-9 | C | Reduce | Non-moving | 5 EA | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 50.2M |
| 4100083031 BEARING,THRUST PAD,TYPE KS393,VITON | A | Monitor | Insurance gap | 0 SET | – | 10 / 16 | 0 / 0 / 1 | – | 5% | – |
| 4200007259Long-lead FAN,COOLING MOTOR,SIZE DE861,NBR | B | Reduce | Non-moving | 59 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 50.0M |
| 4100091202 VALVE,GOVERNOR,SIZE LD214,SS304 | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 5% | – |
| 4100011527Long-lead COUPLING,SIZE MZ77,MONEL | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 49.9M |
| 4100034892 VALVE,GATE,1IN,150#,CF8,RF | C | Reduce | Potentially obsolete | 19 EA | – | 10 / 25 | don't stock | – | 0% | −Rp 49.9M |
| 4100039180 VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316 | C | Reduce | Potentially obsolete | 19 EA | – | 10 / 27 | don't stock | – | 0% | −Rp 49.9M |
| 4100039124 VALVE,NEEDLE,1/2IN ODT,6000PSI,SS316 | A | Reduce | Non-moving | 21 EA | – | 10 / 28 | 0 / 0 / 2 | – | 0% | −Rp 49.9M |
| 4100030647 ELBOW,90DEG,6IN,SCH80,SS316,BW | C | Reduce | Potentially obsolete | 227 EA | – | 3 / 8 | don't stock | – | 0% | −Rp 49.9M |
| 4100000664 BEARING,BALL,ANGULAR,7205 | A | Reduce | Excess | 33 EA | – | 3 / 7 | 5 / 5 / 11 | – | 0% | −Rp 49.8M |
| 4100018877 GASKET,SHEET,10IN,150#,PTFE | A | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 7 / 7 / 11 | – | 5% | – |
| 4300036071 POSITIONER,VALVE,DWG.543-1134,FOR TCV-38 | C | Reduce | Slow-moving | 2 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 49.5M |
| 4100016389 GASKET,SW,2IN,150#,GR/304 | A | Monitor | Critical insurance spare | 3 EA | – | 1 / 3 | 7 / 7 / 11 | – | 5% | – |
| 4100080989 BEARING,JOURNAL,MODEL TP313,GRAPHITE | S | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 25% | – |
| 4300052181 RING,WEAR,DWG.341-5118,FOR PP-1366A | S | Reduce | Potentially obsolete | 6 EA | – | 4 / 6 | don't stock | – | 0% | −Rp 49.1M |
| 4300053134 RING,WEAR,DWG.688-9930,FOR PP-1434 | B | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 49.1M |
| 4100013159 RING,WEAR,TYPE ST76,SS304 | A | Reduce | Non-moving | 8 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 49.1M |
| 4300014212 RING,WEAR,DWG.975-5483,FOR PP-442A | A | Reduce | Non-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 49.1M |
| 4300059899 SLEEVE,SHAFT,DWG.528-1149,FOR PP-138 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 48.5M |
| 4300018822 SLEEVE,SHAFT,DWG.335-9138,FOR PP-1892B | S | Reduce | Potentially obsolete | 6 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 48.5M |
| 4300050390 SLEEVE,SHAFT,DWG.140-9813,FOR PP-489A | A | Reduce | Non-moving | 7 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 48.5M |
| 4100009658 SLEEVE,SHAFT,MODEL XD985,NBR | B | Reduce | Non-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 48.5M |
| 4300001806 SLEEVE,SHAFT,DWG.555-8251,FOR PP-570 | B | Reduce | Non-moving | 8 EA | – | 5 / 8 | 1 / 1 / 2 | – | 0% | −Rp 48.5M |
| 4300018848 SLEEVE,SHAFT,DWG.487-3938,FOR PP-596A | B | Reduce | Non-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 48.5M |
| 4300010057 SLEEVE,SHAFT,DWG.709-8689,FOR PP-891C | A | Reduce | Non-moving | 7 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 48.5M |
| 4100080844 BEARING,JOURNAL,SIZE FR556,SS304 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 5% | – |
| 4100062676 THERMOWELL,TYPE FZ140,CS | C | Reduce | Potentially obsolete | 8 EA | – | 4 / 12 | don't stock | – | 0% | −Rp 48.4M |
| 4300034908 THERMOWELL,DWG.569-6715,FOR TEL-552 | A | Reduce | Non-moving | 8 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 48.4M |
| 4100069027Safety-criticalLong-lead DISC,SAFETY VALVE,SIZE GC837,GRAPHITE | S | Monitor | Slow-moving | 1 EA | – | 1 / 3 | 0 / 0 / 3 | reorder ~03 May 2028 | 5% | – |
| 4100047905 DIAPHRAGM,ACTUATOR,TYPE KN903,MONEL | B | Reduce | Non-moving | 12 EA | – | 10 / 18 | 0 / 0 / 1 | – | 0% | −Rp 48.2M |
| 4100047549 DIAPHRAGM,ACTUATOR,MODEL CI872,A105 | B | Reduce | Non-moving | 12 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 48.2M |
| 4100023711 O-RING,VITON,186MM ID,2.5MM CS | S | Reduce | Potentially obsolete | 1,218 EA | – | 10 / 30 | 0 / 0 / 3 | – | 0% | −Rp 48.2M |
| 4100054583 SWITCH,LIMIT,MODEL VN615,SS304 | C | Reduce | Potentially obsolete | 8 EA | – | 5 / 15 | don't stock | – | 0% | −Rp 47.7M |
| 4100054217Safety-criticalSign-off SWITCH,LIMIT,MODEL VN264,NBR | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 47.7M |
| 4200005841 LAMP,LED,9W,24VDC,T8 | B | Reduce | Non-moving | 120 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 47.6M |
| 4300061877Long-lead TRIM SET,CONTROL VALVE,DWG.344-2308,FOR | A | Reduce | Non-moving | 2 SET | 2 | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 47.6M |
| 4100048477 DIAPHRAGM,ACTUATOR,TYPE ZR602,A182F11 | C | Reduce | Excess | 6 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 47.4M |
| 4100032857Long-lead FLANGE,WN,10IN,600#,SS316,RF | A | Reduce | Excess | 465 EA | 2,107 | 70 / 189 | 228 / 329 / 414 | – | 0% | −Rp 47.3M |
| 4100087655 FILTER ELEMENT,LUBE OIL,25MICRON,P/N FE- | A | Reduce | Non-moving | 19 EA | – | 4 / 9 | 0 / 0 / 2 | – | 0% | – |
| 4100032503 TEE,6IN,3000#,A234WPB,BW | C | Reduce | Potentially obsolete | 89 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 47.1M |
| 4100004678 BEARING,ROLLER,CYL,1ROW,NU317BDB | A | Reduce | Non-moving | 35 EA | – | 10 / 16 | 0 / 0 / 2 | – | 0% | −Rp 47.0M |