Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 75 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300015331Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.330-6972,FOR PRV | A | Reduce | Non-moving | 6 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 44.1M |
| 4300010161Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.249-6223,FOR PRV | S | Reduce | Non-moving | 6 EA | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 44.1M |
| 4300059383Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.954-5392,FOR PRV | S | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 44.1M |
| 4300066103Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.256-4241,FOR PRV | S | Reduce | Non-moving | 6 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 44.1M |
| 4300050272Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.643-2731,FOR PRV | S | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 44.1M |
| 4100061994Long-lead THERMOCOUPLE,N-1ELMNT,8X700LG | A | Reduce | Non-moving | 8 EA | 2 | 2 / 6 | 2 / 2 / 3 | – | 0% | −Rp 43.8M |
| 4100073733 CASTABLE,REFRACTORY,INSUL,1600DEG C | A | Reduce | Slow-moving | 1,483 KG | – | 661 / 1,101 | 239 / 272 / 485 | – | 0% | −Rp 43.8M |
| 4100043008 TUBING,TYPE PZ68,SS316 | C | Monitor | Healthy | 9 M | – | 9 / 28 | 0 / 0 / 55 | reorder ~29 Nov 2026 | 10% | – |
| 4100057232Long-lead TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF | A | Reduce | Excess | 8 EA | – | 4 / 6 | 5 / 5 / 7 | – | 0% | −Rp 43.0M |
| 4300021216 COUPLING,DWG.205-4920,FOR KC-155D | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 42.8M |
| 4300057610 COUPLING,DWG.238-6563,FOR KC-235D | A | Reduce | Non-moving | 6 SET | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 42.8M |
| 4300024222 COUPLING,DWG.580-3169,FOR KC-373 | S | Reduce | Potentially obsolete | 5 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 42.8M |
| 4300041960 COUPLING,DWG.135-4615,FOR PP-1404A | C | Reduce | Potentially obsolete | 5 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 42.8M |
| 4100011015 COUPLING,MODEL PJ969,VITON | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 42.8M |
| 4300018963 COUPLING,DWG.609-1469,FOR PP-1872B | B | Reduce | Non-moving | 6 SET | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 42.8M |
| 4300034191 COUPLING,DWG.908-3400,FOR PP-1906B | S | Reduce | Potentially obsolete | 5 SET | – | 4 / 6 | don't stock | – | 0% | −Rp 42.8M |
| 4300007650 COUPLING,DWG.561-9664,FOR PP-715A | B | Reduce | Non-moving | 6 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 42.8M |
| 4100011900 COUPLING,TYPE ED71,A105 | A | Reduce | Non-moving | 6 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 42.8M |
| 4300051382 TRIM SET,CONTROL VALVE,DWG.192-2715,FOR | C | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 9% | – |
| 4200003476 TERMINAL BLOCK,TYPE ZJ887,SS304 | C | Reduce | Potentially obsolete | 625 EA | – | 10 / 28 | don't stock | – | 0% | −Rp 42.4M |
| 4300057149 THERMOWELL,DWG.876-3527,FOR BF-102-BRN24 | C | Reduce | Potentially obsolete | 7 EA | – | 5 / 7 | don't stock | – | 0% | −Rp 42.4M |
| 4300003760 SPRING,SAFETY VALVE,DWG.440-7121,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300004016 SPRING,SAFETY VALVE,DWG.110-7031,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300004069 SPRING,SAFETY VALVE,DWG.935-7459,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300004727 SPRING,SAFETY VALVE,DWG.187-9971,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300040053 SPRING,SAFETY VALVE,DWG.181-2519,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300040135 SPRING,SAFETY VALVE,DWG.649-3670,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 5 / 12 | 1 / 1 / 2 | – | 4% | – |
| 4300040373 SPRING,SAFETY VALVE,DWG.690-4884,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300040457 SPRING,SAFETY VALVE,DWG.552-2510,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300040616 SPRING,SAFETY VALVE,DWG.427-6643,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300040811 SPRING,SAFETY VALVE,DWG.462-3792,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300022625 SPRING,SAFETY VALVE,DWG.149-3007,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300022794 SPRING,SAFETY VALVE,DWG.700-6023,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300023365 SPRING,SAFETY VALVE,DWG.737-9864,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4100049481 POSITIONER,VALVE,MODEL XP107,SS304 | B | Monitor | Slow-moving | 2 EA | – | 1 / 3 | 0 / 0 / 3 | – | 5% | – |
| 4100046290 PACKING SET,VALVE,SIZE MB162,NBR | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 42.3M |
| 4100007317 IMPELLER,SIZE TB815,NBR | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 4% | – |
| 4100017014 GASKET,SW,12IN,600#,PTFE | A | Reduce | Slow-moving | 214 EA | – | 5 / 10 | 4 / 4 / 8 | – | 0% | −Rp 42.0M |
| 4100081119 BEARING,JOURNAL,TYPE WN576,PTFE | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 4% | – |
| 4300006815 COUPLING,DWG.722-2520,FOR KC-536A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300031707Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,DWG.964-9423,FOR PRV | S | Reduce | Slow-moving | 13 EA | 3 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 41.7M |
| 4100087063 FILTER ELEMENT,LUBE OIL,3MICRON,P/N FE-7 | S | Reduce | Potentially obsolete | 15 EA | – | 4 / 11 | don't stock | – | 0% | −Rp 41.6M |
| 4300060166 TRIM SET,CONTROL VALVE,DWG.211-3188,FOR | C | Reduce | Excess | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 41.5M |
| 4200010870 FAN,COOLING MOTOR,DWG.657-4086,FOR PP-11 | C | Reduce | Excess | 35 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 41.4M |
| 4100001827 BEARING,BALL,ANGULAR,7213 C3 | A | Reduce | Excess | 32 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 41.3M |
| 4100082849 BEARING,THRUST PAD,SIZE QK24,MONEL | A | Monitor | Insurance gap | 0 SET | – | 5 / 8 | 0 / 0 / 1 | – | 4% | – |
| 4100012838 RING,WEAR,SIZE DW276,INCOLOY | A | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 40.9M |
| 4300058870 RING,WEAR,DWG.400-4004,FOR PP-1141A | B | Reduce | Non-moving | 6 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 40.9M |
| 4300027760 RING,WEAR,DWG.674-1582,FOR PP-1872A | S | Reduce | Potentially obsolete | 5 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 40.9M |
| 4100013139 RING,WEAR,MODEL QX377,A105 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 1 / 1 / 4 | – | 0% | −Rp 40.9M |