Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
860 spare parts
Order value Rp 8.9B · excess value Rp 106.7B · page 18 of 18
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100014098Safety-critical GASKET,RING,4IN,300#,GRAPHITE | A | Monitor | Stockout | 0 EA | 140 | 189 / 526 | 42 / 57 / 142 | – | 0% | – |
| 4100024320Safety-critical STUDBOLT,1/2INX45MM,B7/2H | A | Monitor | Healthy | 156 EA | 448 | 34 / 96 | 108 / 134 / 442 | – | 0% | – |
| 4100024318Safety-critical STUDBOLT,5/8INX45MM,B16/4 | A | Monitor | Healthy | 527 EA | 741 | 325 / 730 | 147 / 193 / 659 | – | 0% | – |
| 4100014165Safety-critical GASKET,SHEET,1-1/2IN,600#,GRAPHITE | A | Monitor | Healthy | 48 EA | 30 | 33 / 101 | 16 / 21 / 64 | – | 0% | – |
| 4100045035Safety-criticalLong-lead PACKING SET,VALVE,MODEL FN612,NBR | A | Monitor | Healthy | 3 SET | 73 | 0 / 0 | 15 / 22 / 35 | – | 0% | – |
| 4100019363Safety-critical O-RING,NBR,139MM ID,2.5MM CS | A | Monitor | Healthy | 35 EA | 154 | 23 / 51 | 54 / 74 / 234 | – | 0% | – |
| 4100019326Safety-critical O-RING,NBR,41MM ID,5.3MM CS | A | Monitor | Healthy | 62 EA | 330 | 34 / 89 | 50 / 71 / 408 | – | 0% | – |
| 4100019372Safety-critical O-RING,VITON,24MM ID,5.3MM CS | A | Monitor | Healthy | 180 EA | 172 | 47 / 146 | 41 / 55 / 233 | – | 0% | – |
| 4100019559Safety-criticalLong-lead O-RING,VITON,252MM ID,5.3MM CS | A | Maintain | Healthy | 59 EA | 34 | 16 / 43 | 22 / 29 / 76 | – | 0% | – |
| 4100019606Safety-critical O-RING,EPDM,83MM ID,5.3MM CS | A | Monitor | Slow-moving | 11 EA | 11 | 6 / 13 | 6 / 6 / 14 | – | 0% | – |
← PreviousPage 18 / 18