Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 48 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100045270Safety-criticalSign-off PACKING SET,VALVE,MODEL VM646,SS316 | A | Reduce | Slow-moving | 117 SET | – | 1 / 3 | 9 / 10 / 15 | – | 0% | −Rp 391.8M |
| 4300031512 TRIM SET,CONTROL VALVE,DWG.242-1067,FOR | C | Reduce | Potentially obsolete | 3 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 391.4M |
| 4100048706Long-lead POSITIONER,VALVE,TYPE OW115,CS | A | Reduce | Excess | 18 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 391.2M |
| 4300063674Long-lead TRIM SET,CONTROL VALVE,DWG.377-3855,FOR | B | Reduce | Non-moving | 5 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 388.4M |
| 4100071193Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL FO711,A105 | A | Reduce | Non-moving | 20 EA | – | 5 / 12 | 0 / 0 / 1 | – | 0% | −Rp 385.2M |
| 4100010642 COUPLING,SIZE NF889,NBR | A | Reduce | Non-moving | 50 SET | – | 0 / 0 | 2 / 2 / 5 | – | 0% | −Rp 385.0M |
| 4300064322 RING,WEAR,DWG.433-7568,FOR PP-1194 | A | Reduce | Non-moving | 48 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 384.7M |
| 4100088555 BLADE,ROTOR,SIZE LW323,CS | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300016945 BLADE,ROTOR,DWG.171-5383,FOR KT-264A | S | Reduce | Slow-moving | 1 SET | – | 0 / 0 | don't stock | – | 5% | −Rp 381.5M |
| 4300017602 BLADE,ROTOR,DWG.367-1982,FOR KT-264A | S | Reduce | Non-moving | 1 SET | – | 1 / 2 | don't stock | – | 5% | −Rp 381.5M |
| 4300017676 BLADE,ROTOR,DWG.638-3042,FOR KT-264A | S | Reduce | Non-moving | 1 SET | – | 0 / 0 | don't stock | – | 5% | −Rp 381.5M |
| 4300017953 BLADE,ROTOR,DWG.330-9621,FOR KT-264A | S | Reduce | Non-moving | 1 SET | – | 0 / 0 | don't stock | – | 5% | −Rp 381.5M |
| 4300013534 BLADE,ROTOR,DWG.859-2392,FOR KT-308B | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 381.5M |
| 4300011077 BLADE,ROTOR,DWG.930-3607,FOR KT-383A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300011200 BLADE,ROTOR,DWG.196-1352,FOR KT-383A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300003533 BLADE,ROTOR,DWG.514-9511,FOR KT-397A | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 381.5M |
| 4300004557 BLADE,ROTOR,DWG.247-1840,FOR KT-397A | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 381.5M |
| 4300040344 BLADE,ROTOR,DWG.795-3083,FOR KT-419A | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 381.5M |
| 4300033469 BLADE,ROTOR,DWG.349-8111,FOR KT-624A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300033633 BLADE,ROTOR,DWG.965-2242,FOR KT-624A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4100089360 BLADE,ROTOR,TYPE JD317,PTFE | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300043087 BLADE,ROTOR,DWG.585-7720,FOR KT-778A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4100088751 BLADE,ROTOR,MODEL EX445,SS316 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 381.5M |
| 4100088326 BLADE,ROTOR,TYPE BC340,A182F11 | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300062455 BLADE,ROTOR,DWG.577-8326,FOR KT-875 | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4100085036 SEAL,LABYRINTH,TYPE YP972,GRAPHITE | A | Reduce | Non-moving | 5 SET | – | 4 / 6 | 0 / 0 / 1 | – | 0% | −Rp 378.4M |
| 4100085012 SEAL,LABYRINTH,MODEL VE45,GRAPHITE | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4100085759 SEAL,LABYRINTH,SIZE YQ733,PTFE | S | Reduce | Potentially obsolete | 4 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 378.4M |
| 4300056064 SEAL,LABYRINTH,DWG.926-6848,FOR KC-588 | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 378.4M |
| 4300002742 SEAL,LABYRINTH,DWG.801-6167,FOR KC-778A | A | Reduce | Non-moving | 5 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 378.4M |
| 4100085396 SEAL,LABYRINTH,MODEL OB571,MONEL | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 378.4M |
| 4300017527 SEAL,LABYRINTH,DWG.539-9147,FOR KT-264A | S | Reduce | Slow-moving | 4 SET | – | 1 / 3 | don't stock | – | 5% | −Rp 378.4M |
| 4300011292 SEAL,LABYRINTH,DWG.321-6202,FOR KT-383A | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4300011884 SEAL,LABYRINTH,DWG.920-7029,FOR KT-383A | S | Reduce | Potentially obsolete | 4 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 378.4M |
| 4300029404 SEAL,LABYRINTH,DWG.138-1519,FOR KT-447 | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4300032459 SEAL,LABYRINTH,DWG.433-3354,FOR KT-624A | S | Reduce | Potentially obsolete | 4 SET | – | 4 / 13 | don't stock | – | 0% | −Rp 378.4M |
| 4100085264 SEAL,LABYRINTH,TYPE DK850,VITON | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4300062428 SEAL,LABYRINTH,DWG.877-9157,FOR KT-875 | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4100040209 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | B | TransferNormal | Below reorder point | 2 EA | – | 0 / 0 | 2 / 2 / 4 | transfer 2 from 4100040262 | 0% | – |
| 4300065372 TRIM SET,CONTROL VALVE,DWG.118-7618,FOR | C | Reduce | Slow-moving | 2 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 377.1M |
| 4100058579 TRANSMITTER,DIFF.PRESS,0~5000MMH2O,FF | B | Reduce | Non-moving | 11 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 307.3M |
| 4100089858Long-lead VALVE,GOVERNOR,TYPE NC948,A105 | A | Reduce | Excess | 5 ASS | 2 | 1 / 2 | 2 / 2 / 3 | – | 0% | −Rp 373.5M |
| 4100050253 SEAT RING,VALVE,TYPE AN778,GRAPHITE | A | Reduce | Slow-moving | 35 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 372.2M |
| 4100056408Long-lead TRANSMITTER,PRESS,TYPE FO290,SS304 | B | Reduce | Excess | 16 EA | 7 | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 370.9M |
| 4100075782 CERAMIC FIBER,BLANKET,25T,128KG/M3,1260C | A | Monitor | Insurance gap | 0 RL | – | 3 / 5 | 6 / 6 / 10 | – | 37% | – |
| 4100000951 BEARING,ROLLER,CYL,1ROW,7211BDB | A | ReorderNormal | Below reorder point | 4 EA | – | 1 / 2 | 4 / 4 / 6 | 2 by 01 Oct 2026 | 0% | Rp 2.8M |
| 4300011421 SPRING,SAFETY VALVE,DWG.951-7394,FOR KT- | S | Reduce | Potentially obsolete | 42 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 370.4M |
| 4100079201 ANCHOR,REFRACTORY,MODEL WD458,SS304 | A | Monitor | Critical insurance spare | 11 EA | – | 10 / 15 | 889 / 1,050 / 1,609 | – | 37% | – |
| 4300030961 COUPLING,DWG.607-7675,FOR PP-1834B | B | Reduce | Non-moving | 44 SET | – | 3 / 4 | 0 / 0 / 1 | – | 0% | −Rp 367.9M |
| 4300068742Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.744-8907,FOR PRV | C | Reduce | Non-moving | 19 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 365.0M |