Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 79 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300031566 SEAT RING,VALVE,DWG.794-4259,FOR LCV-169 | S | Reduce | Potentially obsolete | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 33.8M |
| 4300047979 SEAT RING,VALVE,DWG.637-6743,FOR LCV-201 | S | Reduce | Potentially obsolete | 3 EA | – | 3 / 4 | don't stock | – | 0% | −Rp 33.8M |
| 4300066917 SEAT RING,VALVE,DWG.771-6590,FOR PCV-165 | C | Reduce | Potentially obsolete | 3 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 33.8M |
| 4300037618 SEAT RING,VALVE,DWG.997-5818,FOR PCV-186 | S | Reduce | Potentially obsolete | 3 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 33.8M |
| 4300066550 SEAT RING,VALVE,DWG.320-8444,FOR PCV-443 | C | Reduce | Potentially obsolete | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 33.8M |
| 4300019589 SEAT RING,VALVE,DWG.211-4148,FOR PCV-606 | A | Reduce | Non-moving | 4 EA | – | 3 / 4 | 0 / 0 / 1 | – | 0% | −Rp 33.8M |
| 4300037794 SEAT RING,VALVE,DWG.581-4603,FOR PCV-945 | S | Reduce | Potentially obsolete | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 33.8M |
| 4300028808 SEAT RING,VALVE,DWG.115-4497,FOR TCV-124 | C | Reduce | Potentially obsolete | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 33.8M |
| 4100051803 SEAT RING,VALVE,TYPE IP941,A182F11 | A | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 33.8M |
| 4300060189 SEAT RING,VALVE,DWG.687-7443,FOR TCV-808 | C | Reduce | Excess | 4 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 33.8M |
| 4300066476 SEAT RING,VALVE,DWG.965-7697,FOR TCV-647 | A | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 33.8M |
| 4300049249 RING,WEAR,DWG.359-3516,FOR PP-1744 | C | Reduce | Slow-moving | 11 EA | – | 0 / 0 | 1 / 1 / 4 | – | 0% | −Rp 33.8M |
| 4100033753 FLANGE,BLIND,12IN,300#,A105,RF | B | Reduce | Non-moving | 36 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 33.4M |
| 4100010899 COUPLING,TYPE AR741,SS316 | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4100087748 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-6 | S | Reduce | Non-moving | 12 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 33.3M |
| 4100087229 FILTER ELEMENT,FUEL GAS,3MICRON,P/N FE-6 | A | Reduce | Non-moving | 14 EA | – | 3 / 9 | 0 / 0 / 2 | – | 0% | −Rp 33.3M |
| 4100087958 FILTER ELEMENT,FUEL GAS,25MICRON,P/N FE- | A | Reduce | Non-moving | 16 EA | – | 3 / 7 | 2 / 2 / 4 | – | 0% | −Rp 19.4M |
| 4300063682Long-lead SEAT RING,VALVE,DWG.415-3503,FOR FCV-158 | A | Reduce | Non-moving | 3 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 33.0M |
| 4300012470 TRIM SET,CONTROL VALVE,DWG.716-1068,FOR | C | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 7% | – |
| 4100004154 BEARING,BALL,ANGULAR,6309BDB | B | Reduce | Non-moving | 25 EA | – | 10 / 30 | 0 / 0 / 2 | – | 0% | −Rp 32.8M |
| 4100107186 OIL,LUBRICANT,ISO VG 100,SYNTHETIC,209L | A | Reduce | Excess | 307 L | – | 81 / 246 | 33 / 36 / 99 | – | 0% | −Rp 32.7M |
| 4100012567 RING,WEAR,TYPE KI909,INCOLOY | A | Reduce | Non-moving | 5 EA | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 32.7M |
| 4300058050 RING,WEAR,DWG.297-2892,FOR PP-1325 | B | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 32.7M |
| 4100012398 RING,WEAR,TYPE HK465,VITON | A | Reduce | Non-moving | 5 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 32.7M |
| 4300039257 RING,WEAR,DWG.755-8913,FOR PP-224 | C | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 32.7M |
| 4300049122 RING,WEAR,DWG.148-9352,FOR PP-246C | A | Reduce | Non-moving | 5 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 32.7M |
| 4300007299 RING,WEAR,DWG.244-5605,FOR PP-251C | A | Reduce | Slow-moving | 7 EA | – | 1 / 3 | 2 / 2 / 3 | – | 0% | −Rp 32.7M |
| 4300014574 RING,WEAR,DWG.783-5584,FOR PP-287D | B | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 32.7M |
| 4300074493 SLEEVE,SHAFT,DWG.868-7856,FOR PP-1070B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 4% | – |
| 4300034317 SLEEVE,SHAFT,DWG.591-4129,FOR PP-479 | B | Monitor | Insurance gap | 0 EA | – | 2 / 4 | 1 / 1 / 2 | – | 4% | – |
| 4100028974 PIPE,1/4IN,SCH80,SS316,SMLS,6M LG | A | Reduce | Non-moving | 25 LG | – | 10 / 25 | 3 / 3 / 6 | – | 0% | −Rp 32.5M |
| 4300009432 POSITIONER,VALVE,DWG.659-5969,FOR TCV-14 | C | Reduce | Slow-moving | 1 EA | 4 | 0 / 0 | don't stock | – | 0% | −Rp 32.5M |
| 4300005188 SEAL,LABYRINTH,DWG.174-3049,FOR KT-460B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4300005502 SEAL,LABYRINTH,DWG.706-6143,FOR KT-460B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4300005805 SEAL,LABYRINTH,DWG.834-2325,FOR KT-460B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100010086 SLEEVE,SHAFT,SIZE MT972,SS304 | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 32.4M |
| 4100008869 SLEEVE,SHAFT,SIZE OW156,A105 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 32.4M |
| 4300039428 SLEEVE,SHAFT,DWG.557-7347,FOR PP-1865A | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 32.4M |
| 4100009367 SLEEVE,SHAFT,SIZE ZZ844,PTFE | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 32.4M |
| 4300014286 SLEEVE,SHAFT,DWG.444-1399,FOR PP-615A | B | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 32.4M |
| 4300019338 SLEEVE,SHAFT,DWG.391-1414,FOR PP-739 | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 32.4M |
| 4100009113 SLEEVE,SHAFT,SIZE VI745,MONEL | S | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 16% | – |
| 4100060391 TRANSMITTER,TEMP,TYPE DB570,SS304 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100073754 CASTABLE,REFRACTORY,INSUL,1500DEG C | S | Monitor | Slow-moving | 4 KG | – | 1 / 3 | 0 / 0 / 100 | reorder ~16 Oct 2026 | 16% | – |
| 4100025156 STUDBOLT,1/2INX110MM,B8M/8M | A | Monitor | Critical insurance spare | 4 EA | – | 3 / 5 | 27 / 27 / 54 | – | 3% | – |
| 4100062340 THERMOCOUPLE,J-2ELMNT,3.2X3900LG | B | Reduce | Non-moving | 5 EA | – | 3 / 5 | don't stock | – | 0% | −Rp 32.0M |
| 4100062407Long-lead THERMOCOUPLE,K-2ELMNT,8X2300LG | A | Reduce | Slow-moving | 4 EA | 2 | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 31.9M |
| 4100065283 GAUGE,PRESSURE,0-40KG/CM2,6IN DIAL | C | Reduce | Potentially obsolete | 12 EA | – | 3 / 8 | don't stock | – | 0% | −Rp 29.2M |
| 4100065020 GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL | C | Reduce | Potentially obsolete | 12 EA | – | 3 / 5 | don't stock | – | 0% | −Rp 31.9M |
| 4100038512 VALVE,NEEDLE,3/4IN NPT,3000PSI,SS316 | A | Reduce | Non-moving | 14 EA | – | 5 / 12 | 0 / 0 / 2 | – | 0% | −Rp 31.5M |