Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 133 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4200004146 TERMINAL BLOCK,MODEL RV118,GRAPHITE | C | Reduce | Potentially obsolete | 6 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 407,508 |
| 4100106632 SCREEN,WIRE,MODEL UZ71,VITON | A | Reduce | Non-moving | 4 SHT | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 406,675 |
| 4100108503 OIL,LUBRICANT,ISO VG 46,MINERAL,5L | B | Maintain | Critical insurance spare | 6 L | – | 2 / 5 | 0 / 0 / 11 | – | 0% | – |
| 4100059079 TRANSMITTER,TEMP,TYPE VZ467,A105 | A | Maintain | Healthy | 5 EA | – | 0 / 0 | 3 / 3 / 5 | – | 0% | – |
| 4100020757 O-RING,EPDM,285MM ID,3.5MM CS | B | Reduce | Non-moving | 16 EA | – | 4 / 11 | 3 / 3 / 6 | – | 0% | −Rp 396,840 |
| 4100020219 O-RING,EPDM,230MM ID,2.5MM CS | A | Reduce | Excess | 17 EA | – | 1 / 2 | 4 / 4 / 7 | – | 0% | −Rp 396,840 |
| 4100023016Safety-criticalSign-off O-RING,NBR,219MM ID,2.5MM CS | A | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | −Rp 396,840 |
| 4300034469 SLEEVE,SHAFT,DWG.872-5428,FOR PP-376A | C | Monitor | Stockout | 0 EA | 2 | 0 / 0 | 1 / 1 / 3 | reorder ~16 Jul 2027 | 0% | – |
| 4200000689 TERMINAL,LUG,RING,1.25X6MM,CRIMP | A | Reduce | Slow-moving | 1,910 EA | – | 296 / 786 | 0 / 0 / 162 | – | 0% | −Rp 395,280 |
| 4100074708 CASTABLE,REFRACTORY,DENSE,1300DEG C | S | Reduce | Potentially obsolete | 9 KG | – | 4 / 12 | don't stock | – | 2% | −Rp 394,556 |
| 4300008489Long-lead SEAL,LABYRINTH,DWG.662-8839,FOR KC-391D | A | Monitor | Stockout | 0 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100055602 TRANSMITTER,PRESS,TYPE CE893,VITON | A | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300048591 DEMISTER PAD,DWG.447-4126,FOR VD-1129 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300046378 DEMISTER PAD,DWG.576-2741,FOR VD-316 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300046424 DEMISTER PAD,DWG.176-2955,FOR VD-316 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300028201 DEMISTER PAD,DWG.837-2864,FOR VD-436 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300015127 RING,WEAR,DWG.936-4718,FOR PP-296A | S | Maintain | No stock needed | 0 EA | – | 10 / 25 | don't stock | – | 0% | – |
| 4100026463 STUDBOLT,1INX65MM,B7/2H | B | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 0 / 0 / 27 | – | 0% | – |
| 4100088290 BLADE,ROTOR,TYPE VD801,GRAPHITE | A | Maintain | Critical insurance spare | 1 SET | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4100059540 TRANSMITTER,TEMP,SIZE DY698,A105 | A | Monitor | Slow-moving | 2 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | – |
| 4100049857 POSITIONER,VALVE,TYPE GS768,MONEL | C | Maintain | No stock needed | 0 EA | – | 10 / 27 | don't stock | – | 0% | – |
| 4300048422 POSITIONER,VALVE,DWG.681-8847,FOR PCV-15 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300065227 POSITIONER,VALVE,DWG.776-3603,FOR PCV-19 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300066562 POSITIONER,VALVE,DWG.607-9124,FOR PCV-44 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100093851 TUBE PLUG,EXCHANGER,MODEL RH898,CS | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100086272Long-lead FILTER ELEMENT,SEAL GAS,3MICRON,P/N FE-2 | A | Monitor | Healthy | 13 EA | – | 7 / 16 | 9 / 12 / 18 | reorder ~24 Oct 2026 | 0% | – |
| 4200001295 TERMINAL,LUG,PIN,5.5X3MM,CRIMP | B | Monitor | Critical insurance spare | 10 EA | – | 2 / 4 | 0 / 0 / 162 | reorder ~08 Jun 2034 | 0% | – |
| 4300015573Long-lead BEARING,THRUST PAD,DWG.938-8400,FOR KC-3 | A | Monitor | Stockout | 0 SET | 2 | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4100040324 CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316 | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 368,559 |
| 4100041163 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | C | Reduce | Potentially obsolete | 3 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 368,559 |
| 4100041219 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | Reduce | Non-moving | 4 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 368,559 |
| 4100041007 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | C | Reduce | Potentially obsolete | 3 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 368,559 |
| 4100064492 GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL | C | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4200002048 GLAND,CABLE,SIZE GD968,PTFE | C | Reduce | Potentially obsolete | 2 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 367,830 |
| 4200001884 GLAND,CABLE,SIZE WM192,INCOLOY | A | Reduce | Non-moving | 4 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 367,830 |
| 4200002472 GLAND,CABLE,SIZE EK454,CS | B | Reduce | Non-moving | 4 EA | – | 3 / 9 | 0 / 0 / 2 | – | 0% | −Rp 367,830 |
| 4200002341 GLAND,CABLE,SIZE KN130,INCOLOY | A | Reduce | Non-moving | 4 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 367,830 |
| 4200001603 GLAND,CABLE,SIZE WE520,SS304 | S | Reduce | Potentially obsolete | 2 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 367,830 |
| 4100101880 ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-A | C | Reduce | Potentially obsolete | 5 CAN | – | 2 / 6 | don't stock | – | 0% | −Rp 364,953 |
| 4300009615 COUPLING,DWG.416-2971,FOR PP-319 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100021279 O-RING,EPDM,286MM ID,3.5MM CS | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300016420 SEAT RING,VALVE,DWG.797-7789,FOR PCV-195 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100022239 O-RING,NBR,41MM ID,2.5MM CS | S | Reduce | Potentially obsolete | 9 EA | – | 5 / 8 | don't stock | – | 0% | −Rp 357,156 |
| 4100020170 O-RING,NBR,228MM ID,3.5MM CS | A | Reduce | Non-moving | 12 EA | – | 3 / 6 | 0 / 0 / 3 | – | 0% | −Rp 357,156 |
| 4100093029 GREASE,LITHIUM,NLGI 3,1KG | A | Reduce | Non-moving | 2 KG | – | 2 / 4 | don't stock | – | 0% | −Rp 356,981 |
| 4100092269 GREASE,LITHIUM,NLGI 3,1KG | A | Reduce | Non-moving | 2 KG | – | 2 / 5 | don't stock | – | 100% | −Rp 356,981 |
| 4100091911 GREASE,POLYUREA,NLGI 3,0.4KG | C | Reduce | Non-moving | 2 KG | – | 1 / 2 | don't stock | – | 0% | −Rp 356,981 |
| 4100031620 TEE,3/4IN,3000#,A234WPB,SW | A | Reduce | Slow-moving | 3 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 356,602 |
| 4100014289 GASKET,RING,1/4IN,300#,GRAPHITE | A | Monitor | Healthy | 4 EA | 7 | 3 / 8 | 9 / 10 / 27 | reorder ~23 Oct 2026 | 0% | – |
| 4200001273 TERMINAL,LUG,RING,5.5X3MM,CRIMP | B | Monitor | Critical insurance spare | 11 EA | – | 2 / 5 | 0 / 0 / 162 | reorder ~02 Aug 2035 | 0% | – |