Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 70 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100008961 SLEEVE,SHAFT,SIZE MS315,A182F11 | A | Reduce | Non-moving | 10 EA | – | 3 / 7 | 1 / 1 / 2 | – | 0% | −Rp 64.7M |
| 4100001611 BEARING,ROLLER,CYL,1ROW,7206BDB | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 2 / 2 / 4 | – | 6% | – |
| 4300018045 SPRING,SAFETY VALVE,DWG.604-3310,FOR KT- | S | Reduce | Excess | 4 EA | 1 | 0 / 0 | don't stock | – | 0% | −Rp 63.8M |
| 4100060681Long-lead TRANSMITTER,TEMP,TYPE SN564,INCOLOY | B | Reduce | Slow-moving | 5 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 63.5M |
| 4100106999 OIL,LUBRICANT,ISO VG 150,SYNTHETIC,20L | A | Reduce | Excess | 538 L | 1,322 | 533 / 795 | 74 / 105 / 271 | – | 0% | −Rp 63.5M |
| 4100037631 VALVE,GLOBE,1-1/2IN,800#,A216WCB,SW | C | Reduce | Slow-moving | 25 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 63.1M |
| 4300047637Long-lead TRIM SET,CONTROL VALVE,DWG.947-5211,FOR | B | Monitor | Slow-moving | 1 SET | – | 1 / 2 | 0 / 0 / 2 | reorder ~06 Oct 2028 | 8% | – |
| 4300060888Safety-criticalSign-off DISC,SAFETY VALVE,DWG.188-7917,FOR PRV-1 | A | Reduce | Non-moving | 6 EA | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 62.7M |
| 4300065162Safety-criticalSign-off DISC,SAFETY VALVE,DWG.248-7149,FOR PRV-1 | A | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 62.7M |
| 4300055093Safety-criticalSign-off DISC,SAFETY VALVE,DWG.551-5960,FOR PRV-6 | S | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 62.7M |
| 4100061384 THERMOCOUPLE,J-2ELMNT,6.4X2400LG | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 6% | – |
| 4100061399 THERMOCOUPLE,J-2ELMNT,6.4X2000LG | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 6% | – |
| 4100098444 SCREW,TAPPING,M3X25MM,SS304 | A | Monitor | Critical insurance spare | 3 EA | – | 2 / 3 | 227 / 234 / 372 | – | 6% | – |
| 4100098842 SCREW,TAPPING,M3X10MM,CS ZN | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 227 / 234 / 372 | – | 6% | – |
| 4100078385 BURNER TIP,TYPE HR63,INCOLOY | C | Reduce | Potentially obsolete | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 62.0M |
| 4100073773 CASTABLE,REFRACTORY,DENSE,1300DEG C | C | Reduce | Slow-moving | 1,669 KG | – | 0 / 0 | 45 / 50 / 100 | – | 0% | −Rp 61.8M |
| 4300001190 SPRING,SAFETY VALVE,DWG.358-7675,FOR KT- | S | Reduce | Potentially obsolete | 7 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 61.7M |
| 4300043156 SPRING,SAFETY VALVE,DWG.374-2513,FOR KT- | S | Reduce | Potentially obsolete | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 61.7M |
| 4100097492 DEMISTER PAD,TYPE SI739,CS | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 61.7M |
| 4300072290 DEMISTER PAD,DWG.305-2316,FOR VD-1291 | B | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 61.7M |
| 4300037444 DEMISTER PAD,DWG.544-4072,FOR VD-1889 | S | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 61.7M |
| 4300074093 DEMISTER PAD,DWG.706-7405,FOR VD-782A | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 61.7M |
| 4300027053 DEMISTER PAD,DWG.474-7189,FOR VD-958 | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 61.7M |
| 4100045222Safety-criticalSign-off PACKING SET,VALVE,SIZE VJ426,A105 | A | Reduce | Slow-moving | 21 SET | – | 0 / 0 | 3 / 3 / 5 | – | 0% | −Rp 61.5M |
| 4300040519Long-lead BLADE,ROTOR,DWG.512-1363,FOR KT-419A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 6% | – |
| 4300057944 POSITIONER,VALVE,DWG.565-2072,FOR PCV-15 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 14% | – |
| 4100081040 BEARING,JOURNAL,SIZE MW654,GRAPHITE | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 6% | – |
| 4100033040 FLANGE,BLIND,12IN,150#,SS316,RF | A | Reduce | Excess | 65 EA | – | 14 / 34 | 18 / 20 / 35 | – | 0% | −Rp 60.9M |
| 4100070612Safety-criticalSign-off NOZZLE,SAFETY VALVE,SIZE NA405,PTFE | C | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300041634Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.834-7495,FOR PRV | A | Reduce | Non-moving | 4 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300061620Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.418-3366,FOR PRV | A | Reduce | Non-moving | 4 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300066610Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.881-5641,FOR PRV | C | Reduce | Slow-moving | 4 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4100071235Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL OF25,SS304 | C | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300018631Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.582-4694,FOR PRV | S | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300066742Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.376-9183,FOR PRV | S | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300068746Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.165-7543,FOR PRV | C | Reduce | Non-moving | 4 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300020998Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.450-6314,FOR PRV | S | Reduce | Non-moving | 4 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300027634Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.146-9989,FOR PRV | S | Reduce | Non-moving | 4 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300027670Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.966-2250,FOR PRV | S | Reduce | Non-moving | 4 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300031846Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.465-7903,FOR PRV | S | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4100016027 GASKET,RING,3/4IN,600#,GRAPHITE | A | Reduce | Non-moving | 287 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | −Rp 60.7M |
| 4300071774 THERMOWELL,DWG.743-4805,FOR TEL-1895 | B | Reduce | Non-moving | 10 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 60.5M |
| 4100062929 THERMOWELL,SIZE RR32,SS304 | C | Reduce | Potentially obsolete | 10 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 60.5M |
| 4100038553 VALVE,NEEDLE,3/4IN NPT,3000PSI,SS316 | B | Reduce | Non-moving | 23 EA | – | 5 / 10 | don't stock | – | 0% | −Rp 60.5M |
| 4100040867 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | B | TransferNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | transfer 1 from 4100040262 | 0% | – |
| 4100033701 FLANGE,BLIND,1/4IN,600#,A105,RF | A | Reduce | Non-moving | 70 EA | – | 3 / 7 | 0 / 0 / 5 | – | 0% | −Rp 60.3M |
| 4300074266 COUPLING,DWG.743-2818,FOR PP-1396A | A | Reduce | Non-moving | 8 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 59.9M |
| 4300010227 COUPLING,DWG.786-9208,FOR PP-278 | A | Reduce | Non-moving | 9 SET | – | 2 / 6 | 1 / 1 / 2 | – | 0% | −Rp 59.9M |
| 4300009377 COUPLING,DWG.817-8670,FOR PP-1374 | B | Reduce | Non-moving | 8 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 59.9M |
| 4100054163Safety-criticalSign-off SWITCH,LIMIT,SIZE GK804,NBR | A | Reduce | Non-moving | 12 EA | – | 5 / 14 | 0 / 0 / 2 | – | 0% | −Rp 59.6M |