Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 86 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100093924 TUBE PLUG,EXCHANGER,MODEL GK426,NBR | A | Reduce | Non-moving | 40 EA | – | 10 / 24 | 0 / 0 / 1 | – | 0% | −Rp 19.7M |
| 4100000436 BEARING,BALL,1ROW,DEEP GROOVE,6209 C3 | A | Reduce | Excess | 39 EA | – | 7 / 18 | 7 / 8 / 22 | – | 0% | −Rp 19.6M |
| 4100042357 TUBING,MODEL FV102,A182F11 | B | Monitor | Slow-moving | 4 M | – | 3 / 6 | 0 / 0 / 50 | reorder ~27 Jan 2027 | 2% | – |
| 4100006486 SEAL,MECHANICAL,TYPE WT170,A105 | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100011225 COUPLING,MODEL HR577,A105 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300056452 RING,WEAR,DWG.816-1584,FOR PP-139 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 2% | – |
| 4100065920 GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL | B | Reduce | Slow-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 19.4M |
| 4100043762 TRIM SET,CONTROL VALVE,TYPE OP605,INCOLO | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300071518 POSITIONER,VALVE,DWG.200-9734,FOR LCV-10 | S | Monitor | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 10% | – |
| 4300072684Long-lead COUPLING,DWG.494-3994,FOR PP-1945B | A | Reduce | Slow-moving | 10 SET | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 19.2M |
| 4300027493 RING,WEAR,DWG.722-2139,FOR PP-1720D | C | Reduce | Slow-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 19.2M |
| 4100061082 THERMOCOUPLE,N-1ELMNT,6.4X1300LG | A | Reduce | Non-moving | 9 EA | – | 4 / 11 | 3 / 3 / 6 | – | 0% | −Rp 19.2M |
| 4100060862 THERMOCOUPLE,N-2ELMNT,6.4X3600LG | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 3 / 3 / 6 | – | 0% | −Rp 19.2M |
| 4100061896 THERMOCOUPLE,J-2ELMNT,6.4X500LG | C | Reduce | Potentially obsolete | 3 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 19.2M |
| 4300068981 BEARING,THRUST PAD,DWG.247-4378,FOR KC-7 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100026758 STUDBOLT,1INX35MM,B16/4 | A | Monitor | Critical insurance spare | 7 EA | – | 2 / 3 | 27 / 27 / 54 | – | 2% | – |
| 4100025109 STUDBOLT,3/4INX105MM,B16/4 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 27 / 27 / 54 | – | 2% | – |
| 4100043090 TUBING,TYPE VK365,MONEL | C | Monitor | Slow-moving | 13 M | – | 15 / 43 | 0 / 0 / 100 | reorder ~12 Jan 2027 | 4% | – |
| 4100050009 POSITIONER,VALVE,SIZE CB811,NBR | S | Reduce | Slow-moving | 1 EA | 2 | 1 / 2 | don't stock | – | 0% | −Rp 19.0M |
| 4300015033 SEAL,LABYRINTH,DWG.103-3487,FOR KC-284A | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100028241 PIPE,2IN,SCH160,P11,SMLS,6M LG | A | Reduce | Non-moving | 14 LG | – | 3 / 8 | 0 / 0 / 3 | – | 0% | −Rp 18.8M |
| 4300046433 SEAT RING,VALVE,DWG.665-2531,FOR LCV-669 | A | Reduce | Excess | 5 EA | 2 | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 18.8M |
| 4200010458 FAN,COOLING MOTOR,DWG.315-3021,FOR PP-17 | B | Reduce | Non-moving | 17 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 18.8M |
| 4100003074 BEARING,BALL,1ROW,DEEP GROOVE,6306 C3 | C | Reduce | Potentially obsolete | 15 EA | – | 3 / 8 | 0 / 0 / 2 | – | 0% | −Rp 18.5M |
| 4100009154 SLEEVE,SHAFT,SIZE ML130,SS316 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100084604 SEAL,LABYRINTH,SIZE NP820,MONEL | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 9% | – |
| 4100088993 BLADE,ROTOR,MODEL YV90,CS | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 9% | – |
| 4100016059 GASKET,RING,1IN,600#,GR/304 | A | Monitor | Critical insurance spare | 3 EA | – | 2 / 4 | 4 / 4 / 8 | – | 2% | – |
| 4100017158 GASKET,SW,6IN,150#,GR/304 | A | Reduce | Slow-moving | 94 EA | – | 1 / 3 | 4 / 4 / 8 | – | 0% | −Rp 18.4M |
| 4100009505 SLEEVE,SHAFT,SIZE GB890,A182F11 | C | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 4% | – |
| 4100036359 VALVE,GATE,3IN,800#,A216WCB,SW | C | Reduce | Potentially obsolete | 7 EA | – | 4 / 10 | don't stock | – | 0% | −Rp 18.4M |
| 4100035083 VALVE,GATE,1/2IN,800#,CF8,RF | A | Reduce | Non-moving | 11 EA | – | 3 / 8 | 2 / 2 / 4 | – | 0% | −Rp 18.4M |
| 4100034846 VALVE,GATE,1/4IN,150#,A216WCB,RF | A | Reduce | Non-moving | 9 EA | – | 4 / 6 | 0 / 0 / 2 | – | 0% | −Rp 18.4M |
| 4100038835 VALVE,NEEDLE,3/4IN NPT,3000PSI,SS316 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 18.4M |
| 4100039048 VALVE,NEEDLE,1/4IN ODT,6000PSI,SS316 | B | Reduce | Non-moving | 9 EA | – | 5 / 13 | 0 / 0 / 2 | – | 0% | −Rp 18.4M |
| 4300052308 DEMISTER PAD,DWG.725-4451,FOR CL-1871 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300012969 SEAL,LABYRINTH,DWG.305-2263,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300013105 SEAL,LABYRINTH,DWG.757-1634,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300014026 SEAL,LABYRINTH,DWG.589-7944,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 10 / 24 | 0 / 0 / 1 | – | 2% | – |
| 4100029756 ELBOW,90DEG,3/4IN,SCH40,A234WPB,BW | B | Reduce | Excess | 620 EA | – | 76 / 129 | 17 / 22 / 70 | – | 0% | −Rp 18.2M |
| 4100062639 THERMOWELL,MODEL XD472,CS | A | Reduce | Slow-moving | 5 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 18.2M |
| 4300058640 THERMOWELL,DWG.329-9570,FOR TEL-1454A | S | Reduce | Potentially obsolete | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 18.2M |
| 4100062755 THERMOWELL,TYPE LN904,VITON | A | Reduce | Non-moving | 3 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 18.2M |
| 4300002125 THERMOWELL,DWG.541-1481,FOR TEL-1920-44B | B | Reduce | Non-moving | 3 EA | – | 3 / 4 | don't stock | – | 0% | −Rp 18.2M |
| 4300066627 THERMOWELL,DWG.310-6258,FOR TEL-936B-11B | S | Reduce | Potentially obsolete | 3 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 18.2M |
| 4100075042 CASTABLE,REFRACTORY,INSUL,1700DEG C | S | Monitor | Potentially obsolete | 5 KG | – | 2 / 6 | 0 / 0 / 91 | reorder ~04 Nov 2026 | 9% | – |
| 4100055007 SWITCH,LIMIT,TYPE PX108,PTFE | A | Reduce | Non-moving | 5 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 17.9M |
| 4300028743 TRIM SET,CONTROL VALVE,DWG.323-7085,FOR | C | Maintain | No stock needed | 0 SET | – | 5 / 8 | don't stock | – | 4% | – |
| 4300018605 COUPLING,DWG.721-3940,FOR PP-601 | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4200005011 LAMP,LED,50W,24VDC,FLOOD | A | Reduce | Non-moving | 46 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 17.7M |