Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 25 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100000725 BEARING,BALL,1ROW,DEEP GROOVE,7216 | A | ReorderNormal | Below reorder point | 4 EA | – | 0 / 0 | 5 / 5 / 10 | 6 by 01 Oct 2026 | 1% | Rp 8.5M |
| 4300027243Sign-off TRIM SET,CONTROL VALVE,DWG.242-9801,FOR | B | Reduce | Non-moving | 102 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 8.0B |
| 4100040998 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | C | TransferHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 1 | transfer 1 from 4100040262 | 2% | – |
| 4300024298 COUPLING,DWG.860-3503,FOR PP-1577D | B | ReorderNormal | Slow-moving | 1 SET | – | 1 / 3 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 1% | Rp 8.6M |
| 4100012268Sign-off COUPLING,SIZE FV668,MONEL | B | Reduce | Non-moving | 930 SET | – | 10 / 27 | 1 / 1 / 2 | – | 0% | −Rp 7.9B |
| 4100000936 BEARING,BALL,1ROW,DEEP GROOVE,NU312 C3 | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 4 / 4 / 6 | 4 by 01 Oct 2026 | 1% | Rp 5.7M |
| 4300032299Sign-off BEARING,THRUST PAD,DWG.641-9838,FOR KT-6 | S | Reduce | Potentially obsolete | 36 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 7.9B |
| 4300027073Sign-off IMPELLER,DWG.140-1299,FOR PP-103 | A | Reduce | Non-moving | 78 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 7.9B |
| 4100093366Long-lead TUBE PLUG,EXCHANGER,TYPE IV372,GRAPHITE | A | ReorderNormal | Below reorder point | 5 EA | – | 1 / 3 | 6 / 7 / 12 | 7 by 01 Oct 2026 | 1% | Rp 6.5M |
| 4300000469Sign-off SEAL,LABYRINTH,DWG.417-3615,FOR KT-202 | S | Reduce | Potentially obsolete | 81 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 7.7B |
| 4100005553 SEAL,MECHANICAL,MODEL VD78,A105 | A | ReorderNormal | Slow-moving | 4 SET | – | 1 / 2 | 4 / 5 / 6 | 2 by 01 Oct 2026 | 1% | Rp 189.2M |
| 4300063014Sign-off BLADE,ROTOR,DWG.941-3991,FOR KT-875 | S | Reduce | Potentially obsolete | 20 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 7.6B |
| 4100041746 TUBING,TYPE HS18,NBR | A | ReorderNormal | Below reorder point | 135 M | – | 23 / 72 | 133 / 152 / 239 | 104 by 01 Oct 2026 | 1% | Rp 47.1M |
| 4100031430 TEE,1/2IN,SCH80,A105,SW | C | ReorderHigh | Stockout | 0 EA | – | 1 / 3 | 0 / 0 / 4 | 4 by 01 Oct 2026 | 2% | Rp 2.1M |
| 4300006888Sign-off BEARING,THRUST PAD,DWG.415-1961,FOR KC-5 | A | Reduce | Non-moving | 35 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 7.5B |
| 4300049382Sign-off BEARING,JOURNAL,DWG.851-1839,FOR KC-867D | A | Reduce | Non-moving | 35 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 7.5B |
| 4300044087Sign-off VALVE,GOVERNOR,DWG.908-7149,FOR KT-778A | S | Reduce | Potentially obsolete | 31 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 7.4B |
| 4100099995 BOLT,ANCHOR,TYPE CE837,CS | A | ReorderNormal | Slow-moving | 4 EA | – | 1 / 2 | 5 / 5 / 15 | 11 by 01 Oct 2026 | 1% | Rp 220,099 |
| 4300048261 TRAY VALVE,DWG.749-2086,FOR CL-721 | B | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 2 / 2 / 3 | 2 by 01 Oct 2026 | 1% | Rp 169,050 |
| 4100060554Sign-off TRANSMITTER,TEMP,TYPE PA728,VITON | A | Reduce | Non-moving | 216 EA | – | 5 / 7 | 0 / 0 / 1 | – | 0% | −Rp 7.3B |
| 4100045507Safety-criticalLong-lead PACKING SET,VALVE,MODEL IV777,NBR | A | ReorderNormal | Below reorder point | 2 SET | 2 | 1 / 2 | 4 / 5 / 8 | 4 by 01 Oct 2026 | 1% | Rp 47.7M |
| 4300055413 TRIM SET,CONTROL VALVE,DWG.419-6187,FOR | A | ReorderNormal | Slow-moving | 1 SET | – | 0 / 0 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 1% | Rp 78.5M |
| 4100014955 GASKET,SHEET,8IN,150#,PTFE | A | ReorderNormal | Slow-moving | 4 EA | – | 2 / 6 | 6 / 6 / 11 | 7 by 01 Oct 2026 | 1% | Rp 1.5M |
| 4300017964Sign-off BLADE,ROTOR,DWG.416-4642,FOR KT-264A | S | Reduce | Non-moving | 19 SET | – | 4 / 11 | don't stock | – | 0% | −Rp 7.2B |
| 4300042773Sign-off BLADE,ROTOR,DWG.592-1402,FOR KT-778A | S | Reduce | Potentially obsolete | 19 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 7.2B |
| 4100107834 OIL,LUBRICANT,ISO VG 220,MINERAL,209L | B | ReorderNormal | Critical insurance spare | 4 L | – | 2 / 6 | 11 / 11 / 22 | 18 by 01 Oct 2026 | 1% | Rp 2.8M |
| 4300013827Sign-off VALVE,GOVERNOR,DWG.276-3583,FOR KT-308B | A | Reduce | Non-moving | 30 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 7.1B |
| 4100005651 SEAL,MECHANICAL,SIZE GF387,INCOLOY | A | ReorderNormal | Slow-moving | 5 SET | – | 1 / 3 | 5 / 6 / 7 | 2 by 01 Oct 2026 | 1% | Rp 189.2M |
| 4100049045 POSITIONER,VALVE,TYPE FH249,NBR | B | ReorderNormal | Below reorder point | 2 EA | – | 1 / 3 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 1% | Rp 79.8M |
| 4300041538Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.504-9186,FOR PRV | C | Reduce | Non-moving | 345 EA | – | 10 / 29 | 0 / 0 / 1 | – | 0% | −Rp 7.0B |
| 4300067275Sign-off TRIM SET,CONTROL VALVE,DWG.665-5966,FOR | B | Reduce | Slow-moving | 89 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 6.9B |
| 4300004913Sign-off BLADE,ROTOR,DWG.450-5633,FOR KT-397A | A | Reduce | Non-moving | 19 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 6.9B |
| 4300042528Sign-off BLADE,ROTOR,DWG.372-8371,FOR KT-778A | S | Reduce | Potentially obsolete | 18 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 6.9B |
| 4300032955Sign-off BEARING,THRUST PAD,DWG.196-9985,FOR KT-6 | S | Reduce | Potentially obsolete | 31 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 6.8B |
| 4100025065Safety-critical STUDBOLT,7/8INX110MM,B16/4 | A | ReorderNormal | Below reorder point | 33 EA | 32 | 24 / 36 | 98 / 104 / 178 | 113 by 01 Oct 2026 | 1% | Rp 13.8M |
| 4300061412Sign-off SEAL,LABYRINTH,DWG.738-3975,FOR KC-890A | S | Reduce | Potentially obsolete | 71 SET | – | 10 / 30 | don't stock | – | 0% | −Rp 6.7B |
| 4100089800Sign-off VALVE,GOVERNOR,MODEL DN230,MONEL | A | Reduce | Non-moving | 29 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 6.7B |
| 4300021611Sign-off POSITIONER,VALVE,DWG.966-9487,FOR PCV-12 | S | Reduce | Potentially obsolete | 166 EA | – | 5 / 10 | don't stock | – | 0% | −Rp 6.6B |
| 4300002017Sign-off BEARING,THRUST PAD,DWG.153-5125,FOR KC-6 | A | Reduce | Non-moving | 30 SET | – | 5 / 16 | don't stock | – | 0% | −Rp 6.6B |
| 4100055819Sign-off TRANSMITTER,PRESS,TYPE ZL636,A182F11 | C | Reduce | Potentially obsolete | 191 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 6.5B |
| 4300034190 RING,WEAR,DWG.207-6181,FOR PP-1721A | A | ReorderNormal | Below reorder point | 1 EA | – | 0 / 0 | 2 / 2 / 3 | 2 by 01 Oct 2026 | 1% | Rp 35.8M |
| 4100057095Sign-off TRANSMITTER,PRESS,MODEL NR472,NBR | C | Reduce | Potentially obsolete | 188 EA | – | 4 / 8 | don't stock | – | 0% | −Rp 6.4B |
| 4200001543 GLAND,CABLE,MODEL GF985,A182F11 | A | ReorderNormal | Below reorder point | 1 EA | – | 1 / 3 | 2 / 2 / 4 | 3 by 01 Oct 2026 | 1% | Rp 160,164 |
| 4300022284Sign-off BLADE,ROTOR,DWG.538-7570,FOR KT-856A | A | Reduce | Non-moving | 16 SET | 1 | 5 / 10 | 0 / 0 / 1 | – | 0% | −Rp 6.4B |
| 4300017581Sign-off BEARING,THRUST PAD,DWG.511-7858,FOR KT-2 | S | Reduce | Slow-moving | 29 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 6.4B |
| 4300042994Sign-off BEARING,JOURNAL,DWG.359-7646,FOR KT-778A | S | Reduce | Potentially obsolete | 29 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 6.4B |
| 4300064562Sign-off TRIM SET,CONTROL VALVE,DWG.258-3783,FOR | C | Reduce | Potentially obsolete | 81 SET | – | 2 / 3 | don't stock | – | 0% | −Rp 6.4B |
| 4100066120Safety-criticalLong-lead SPRING,SAFETY VALVE,TYPE HO480,A182F11 | A | ReorderNormal | Slow-moving | 3 EA | – | 1 / 3 | 4 / 4 / 6 | 3 by 01 Oct 2026 | 1% | Rp 47.7M |
| 4300052029Long-leadSign-off TRIM SET,CONTROL VALVE,DWG.446-3534,FOR | A | Reduce | Excess | 75 SET | 2 | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 6.2B |
| 4300050426Sign-off TRIM SET,CONTROL VALVE,DWG.205-1549,FOR | C | Reduce | Excess | 79 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 6.2B |