Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
730 spare parts
Order value Rp 21.0B · excess value Rp 227.6B · page 6 of 15
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300063555Sign-off IMPELLER,DWG.154-5317,FOR PP-1453B | B | Reduce | Slow-moving | 16 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 1.4B |
| 4100062787 THERMOWELL,MODEL IR194,NBR | B | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 6.1M |
| 4300028691Long-lead SEAL,LABYRINTH,DWG.909-2064,FOR KC-419A | A | ReorderNormal | Slow-moving | 2 SET | 2 | 0 / 0 | 4 / 4 / 5 | 1 by 01 Oct 2026 | 0% | Rp 94.6M |
| 4100054828Safety-criticalLong-lead SWITCH,LIMIT,MODEL NG637,INCOLOY | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 13.9M |
| 4300024915 DEMISTER PAD,DWG.431-5597,FOR VD-1044 | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 30.9M |
| 4100066587Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,TYPE IM339,A105 | S | Reduce | Slow-moving | 44 EA | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 1.2B |
| 4300069875Sign-off BLADE,ROTOR,DWG.237-1746,FOR KT-513 | A | Reduce | Slow-moving | 7 SET | – | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 1.1B |
| 4100015829 GASKET,SHEET,10IN,150#,GR/304 | B | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 428,908 |
| 4300061326Sign-off BEARING,JOURNAL,DWG.810-3712,FOR KC-890A | S | Reduce | Slow-moving | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300034084Safety-critical DISC,SAFETY VALVE,DWG.889-1837,FOR PRV-9 | S | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 12.5M |
| 4100087529 FILTER ELEMENT,SEAL GAS,25MICRON,P/N FE- | A | Reduce | Slow-moving | 324 EA | – | 9 / 16 | 6 / 6 / 11 | – | 0% | −Rp 867.6M |
| 4300063462Safety-critical NOZZLE,SAFETY VALVE,DWG.687-6162,FOR PRV | S | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 20.3M |
| 4300061510 SEAL,LABYRINTH,DWG.896-6351,FOR KC-890A | S | Reduce | Slow-moving | 17 SET | 2 | 0 / 0 | don't stock | – | 0% | −Rp 810.7M |
| 4300071207 SLEEVE,SHAFT,DWG.936-9975,FOR PP-497A | B | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 8.1M |
| 4200002114 GLAND,CABLE,SIZE XL225,SS304 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 183,915 |
| 4200010213 FAN,COOLING MOTOR,DWG.610-5789,FOR PP-10 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 1.3M |
| 4100039125Long-lead VALVE,NEEDLE,1/4IN NPT,6000PSI,SS316 | B | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 4.4M |
| 4100001194Long-lead BEARING,BALL,ANGULAR,6209-2Z | A | ReorderNormal | Slow-moving | 5 EA | 2 | 1 / 2 | 6 / 7 / 14 | 7 by 01 Oct 2026 | 0% | Rp 9.3M |
| 4300031439 IMPELLER,DWG.308-5244,FOR PP-1886B | B | Reduce | Slow-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 714.7M |
| 4100056485 TRANSMITTER,PRESS,TYPE OL864,SS304 | C | Reduce | Slow-moving | 12 EA | 1 | 5 / 14 | 0 / 0 / 2 | – | 0% | −Rp 694.6M |
| 4100096678 DEMISTER PAD,TYPE KF347,SS316 | A | Reduce | Slow-moving | 47 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 694.1M |
| 4100061070 THERMOCOUPLE,K-1ELMNT,8X1100LG | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 12.8M |
| 4100105145Long-lead SCREEN,WIRE,TYPE CF689,NBR | A | ReorderNormal | Slow-moving | 4 SHT | 1 | 3 / 6 | 5 / 5 / 9 | 4 by 01 Oct 2026 | 0% | Rp 1.9M |
| 4200007851Long-lead FAN,COOLING MOTOR,MODEL IV858,INCOLOY | B | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 1.9M |
| 4300008421 BEARING,THRUST PAD,DWG.225-8271,FOR KC-3 | A | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300002973 BEARING,JOURNAL,DWG.350-7276,FOR KC-930C | A | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300012879 BEARING,THRUST PAD,DWG.680-9661,FOR KT-3 | A | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4100088684Long-lead BLADE,ROTOR,MODEL PD172,CS | A | Reduce | Slow-moving | 6 SET | 2 | 1 / 3 | 2 / 2 / 3 | – | 0% | −Rp 627.6M |
| 4300009963 THERMOWELL,DWG.486-4487,FOR TEL-1113B | S | Reduce | Slow-moving | 101 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 611.1M |
| 4100091568 GREASE,POLYUREA,NLGI 3,1KG | A | Reduce | Slow-moving | 4,774 KG | – | 2,000 / 3,344 | 284 / 330 / 819 | – | 0% | −Rp 564.4M |
| 4300030549 POSITIONER,VALVE,DWG.452-1178,FOR PCV-16 | C | Reduce | Slow-moving | 14 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 558.8M |
| 4100000792 BEARING,BALL,ANGULAR,7210-2Z | A | Reduce | Slow-moving | 177 EA | 2 | 2 / 6 | 6 / 6 / 11 | – | 0% | −Rp 553.2M |
| 4300026571 SLEEVE,SHAFT,DWG.642-4324,FOR PP-1470A | C | Reduce | Slow-moving | 69 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 541.9M |
| 4100037989 VALVE,GLOBE,1-1/2IN,150#,A216WCB,RF | C | Reduce | Slow-moving | 124 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 538.1M |
| 4100055093Long-lead SWITCH,LIMIT,TYPE QS260,GRAPHITE | B | Reduce | Slow-moving | 92 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 536.5M |
| 4200001659 GLAND,CABLE,SIZE EJ969,SS304 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 152,634 |
| 4100001290 BEARING,BALL,ANGULAR,6316 | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 2.8M |
| 4100047204 DIAPHRAGM,ACTUATOR,SIZE BN577,NBR | A | Reduce | Slow-moving | 122 EA | – | 1 / 3 | 3 / 3 / 5 | – | 0% | −Rp 512.9M |
| 4300052598Long-lead THERMOWELL,DWG.800-1331,FOR TEL-1793 | A | Reduce | Slow-moving | 87 EA | 3 | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 511.8M |
| 4100077965 BURNER TIP,TYPE ON116,SS316 | A | Reduce | Slow-moving | 44 EA | – | 0 / 0 | 6 / 8 / 11 | – | 0% | −Rp 511.2M |
| 4300041337 RING,WEAR,DWG.485-6283,FOR PP-1323 | A | Reduce | Slow-moving | 67 EA | – | 1 / 2 | 3 / 3 / 5 | – | 0% | −Rp 507.5M |
| 4300064291Long-lead SLEEVE,SHAFT,DWG.359-7852,FOR PP-1194 | A | ReorderNormal | Slow-moving | 6 EA | – | 1 / 3 | 6 / 6 / 9 | 3 by 01 Oct 2026 | 0% | Rp 17.8M |
| 4300024303 SLEEVE,SHAFT,DWG.795-6835,FOR PP-1577D | B | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 8.1M |
| 4300025098 TRIM SET,CONTROL VALVE,DWG.735-1041,FOR | C | Reduce | Slow-moving | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 471.0M |
| 4300021926 COUPLING,DWG.846-3101,FOR PP-1938A | S | Reduce | Slow-moving | 55 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 470.5M |
| 4300051949Safety-critical NOZZLE,SAFETY VALVE,DWG.321-7117,FOR PRV | S | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 20.3M |
| 4300067877 POSITIONER,VALVE,DWG.384-9469,FOR LCV-82 | C | Reduce | Slow-moving | 11 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 439.1M |
| 4300048735 BEARING,THRUST PAD,DWG.890-4016,FOR KC-1 | A | Reduce | Slow-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 438.5M |
| 4300069530 BEARING,THRUST PAD,DWG.538-1924,FOR KT-5 | A | Reduce | Slow-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 438.5M |
| 4300046040 IMPELLER,DWG.609-4392,FOR PP-1604A | A | Reduce | Slow-moving | 6 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 408.4M |