Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
730 spare parts
Order value Rp 21.0B · excess value Rp 227.6B · page 8 of 15
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100054712Safety-criticalLong-lead SWITCH,LIMIT,TYPE OX284,PTFE | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 7.6M |
| 4100046969 DIAPHRAGM,ACTUATOR,MODEL CD343,A105 | A | Reduce | Slow-moving | 50 EA | – | 2 / 3 | 5 / 6 / 9 | – | 0% | −Rp 179.7M |
| 4100057551 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART | C | Reduce | Slow-moving | 2 EA | 2 | 1 / 2 | don't stock | – | 0% | −Rp 174.4M |
| 4100037703 VALVE,GLOBE,1/2IN,150#,A216WCB,SW | C | Reduce | Slow-moving | 66 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 170.8M |
| 4100055881 TRANSMITTER,PRESS,SIZE EH447,A105 | C | Reduce | Slow-moving | 5 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 170.7M |
| 4100043468Long-lead TRIM SET,CONTROL VALVE,SIZE QH233,GRAPHI | B | Reduce | Slow-moving | 5 SET | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 165.6M |
| 4300037563 SEAT RING,VALVE,DWG.670-6373,FOR PCV-186 | S | Reduce | Slow-moving | 3 EA | 1 | 0 / 0 | don't stock | – | 0% | −Rp 163.8M |
| 4100017120Safety-critical GASKET,SW,12IN,600#,GR/304 | A | ReorderNormal | Slow-moving | 4 EA | – | 1 / 2 | 4 / 4 / 7 | 3 by 01 Oct 2026 | 0% | Rp 643,361 |
| 4300008011Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,DWG.353-6797,FOR PRV | A | Reduce | Slow-moving | 11 EA | 2 | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 162.7M |
| 4300025486Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,DWG.392-3943,FOR PRV-3 | S | Reduce | Slow-moving | 7 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 162.2M |
| 4300014185 POSITIONER,VALVE,DWG.920-8325,FOR FCV-16 | C | Reduce | Slow-moving | 4 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 159.7M |
| 4300002502 POSITIONER,VALVE,DWG.210-9005,FOR PCV-53 | S | Reduce | Slow-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4300073955Long-lead SEAT RING,VALVE,DWG.989-9791,FOR TCV-169 | B | Reduce | Slow-moving | 9 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 159.2M |
| 4300066398 TRIM SET,CONTROL VALVE,DWG.683-9831,FOR | A | Reduce | Slow-moving | 6 SET | – | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 157.0M |
| 4300009462 TRIM SET,CONTROL VALVE,DWG.371-4342,FOR | C | Reduce | Slow-moving | 2 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 157.0M |
| 4300024982 TRIM SET,CONTROL VALVE,DWG.867-7022,FOR | C | Reduce | Slow-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 157.0M |
| 4300063105 TRIM SET,CONTROL VALVE,DWG.100-9081,FOR | C | Reduce | Slow-moving | 2 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 157.0M |
| 4100028820 PIPE,3/4IN,SCH80,CS,SMLS,6M LG | A | Reduce | Slow-moving | 128 LG | – | 1 / 3 | 6 / 6 / 14 | – | 0% | −Rp 152.5M |
| 4100036958 VALVE,GLOBE,1/2IN,300#,A105,SW | C | Reduce | Slow-moving | 57 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 147.2M |
| 4300056433 SEAT RING,VALVE,DWG.313-1759,FOR FCV-154 | A | Reduce | Slow-moving | 19 EA | – | 0 / 0 | 3 / 3 / 6 | – | 0% | −Rp 146.6M |
| 4300028231Safety-criticalLong-leadSign-off NOZZLE,SAFETY VALVE,DWG.476-9874,FOR PRV | B | Reduce | Slow-moving | 5 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 145.4M |
| 4300072163Long-lead POSITIONER,VALVE,DWG.566-5883,FOR PCV-13 | A | Reduce | Slow-moving | 7 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 137.3M |
| 4100057562 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF | A | Reduce | Slow-moving | 7 EA | – | 2 / 5 | 2 / 2 / 3 | – | 0% | −Rp 136.6M |
| 4100044277Long-lead TRIM SET,CONTROL VALVE,MODEL YJ666,SS316 | B | Monitor | Slow-moving | 1 SET | – | 1 / 2 | 0 / 0 / 2 | reorder ~11 Mar 2028 | 17% | – |
| 4100052914Safety-criticalSign-off SOLENOID VALVE,MODEL YM973,NBR | A | Reduce | Slow-moving | 24 EA | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 134.5M |
| 4100044568Long-lead TRIM SET,CONTROL VALVE,SIZE FZ730,SS316 | A | Reduce | Slow-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 132.8M |
| 4300035047Long-lead TRIM SET,CONTROL VALVE,DWG.842-2356,FOR | B | Reduce | Slow-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 128.9M |
| 4100048845 POSITIONER,VALVE,SIZE AX247,MONEL | C | Reduce | Slow-moving | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 124.2M |
| 4300046702Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.454-3583,FOR PRV | C | Reduce | Slow-moving | 8 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 121.7M |
| 4300007220 POSITIONER,VALVE,DWG.179-2303,FOR FCV-10 | A | Reduce | Slow-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 119.8M |
| 4300053212 POSITIONER,VALVE,DWG.263-4027,FOR FCV-17 | B | Reduce | Slow-moving | 4 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 119.8M |
| 4300032091 POSITIONER,VALVE,DWG.500-2450,FOR TCV-12 | C | Reduce | Slow-moving | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 119.8M |
| 4300048322 POSITIONER,VALVE,DWG.410-5669,FOR PCV-15 | C | Reduce | Slow-moving | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 119.6M |
| 4100028631 PIPE,3/4IN,STD,P11,SMLS,6M LG | S | Reduce | Slow-moving | 68 LG | – | 21 / 43 | don't stock | – | 0% | −Rp 116.4M |
| 4300030971Long-lead THERMOWELL,DWG.235-2769,FOR BF-112-COIL1 | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 2.3M |
| 4100050274Long-lead SEAT RING,VALVE,TYPE KA462,GRAPHITE | A | Reduce | Slow-moving | 5 EA | – | 1 / 2 | 2 / 2 / 3 | – | 0% | −Rp 113.8M |
| 4300064449Long-lead DEMISTER PAD,DWG.751-7240,FOR CL-932 | A | Reduce | Slow-moving | 4 EA | 2 | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 111.0M |
| 4100003633 BEARING,BALL,ANGULAR,6204 C3 | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 1.4M |
| 4100028191 PIPE,3/4IN,SCH40,CS,SMLS,6M LG | A | Reduce | Slow-moving | 107 LG | – | 5 / 15 | 20 / 24 / 47 | – | 0% | −Rp 102.7M |
| 4300057769 IMPELLER,DWG.185-2505,FOR PP-225A | A | Reduce | Slow-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 102.1M |
| 4300015149 IMPELLER,DWG.517-8968,FOR PP-296A | S | Reduce | Slow-moving | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 102.1M |
| 4300041268 IMPELLER,DWG.519-9771,FOR PP-651A | A | Reduce | Slow-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 102.1M |
| 4300025182 SEAT RING,VALVE,DWG.482-6567,FOR LCV-170 | S | Reduce | Slow-moving | 9 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 101.5M |
| 4300067049Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.426-5391,FOR PRV | A | Reduce | Slow-moving | 7 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 101.4M |
| 4100061924 THERMOCOUPLE,J-2ELMNT,3.2X1000LG | S | Monitor | Slow-moving | 1 EA | – | 1 / 3 | 0 / 0 / 5 | reorder ~11 Nov 2026 | 50% | – |
| 4300038481Long-lead COUPLING,DWG.594-8820,FOR PP-123 | B | Reduce | Slow-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.7M |
| 4300025421 SEAL,LABYRINTH,DWG.949-3405,FOR KC-373B | S | Reduce | Slow-moving | 1 SET | – | 0 / 0 | don't stock | – | 14% | −Rp 94.6M |
| 4100005349 SEAL,MECHANICAL,MODEL HV667,MONEL | A | Reduce | Slow-moving | 5 SET | – | 0 / 0 | 3 / 3 / 4 | – | 0% | −Rp 94.6M |
| 4300035665 BEARING,JOURNAL,DWG.777-8151,FOR KC-422A | S | Reduce | Slow-moving | 1 SET | 2 | 0 / 0 | don't stock | – | 0% | −Rp 92.7M |
| 4300010076 TRIM SET,CONTROL VALVE,DWG.251-1444,FOR | C | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 88.0M |