Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
730 spare parts
Order value Rp 21.0B · excess value Rp 227.6B · page 7 of 15
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300072051 IMPELLER,DWG.744-4573,FOR PP-1809B | A | Reduce | Slow-moving | 6 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 408.4M |
| 4100053827Safety-criticalLong-leadSign-off SWITCH,LIMIT,TYPE MV248,MONEL | A | Reduce | Slow-moving | 48 EA | – | 1 / 2 | 2 / 2 / 3 | – | 0% | −Rp 400.2M |
| 4300045773 POSITIONER,VALVE,DWG.346-2863,FOR TCV-13 | A | Reduce | Slow-moving | 12 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 399.2M |
| 4300030524 TRIM SET,CONTROL VALVE,DWG.861-2752,FOR | C | Reduce | Slow-moving | 5 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 392.5M |
| 4100045270Safety-criticalSign-off PACKING SET,VALVE,MODEL VM646,SS316 | A | Reduce | Slow-moving | 117 SET | – | 1 / 3 | 9 / 10 / 15 | – | 0% | −Rp 391.8M |
| 4300016945 BLADE,ROTOR,DWG.171-5383,FOR KT-264A | S | Reduce | Slow-moving | 1 SET | – | 0 / 0 | don't stock | – | 5% | −Rp 381.5M |
| 4300017527 SEAL,LABYRINTH,DWG.539-9147,FOR KT-264A | S | Reduce | Slow-moving | 4 SET | – | 1 / 3 | don't stock | – | 5% | −Rp 378.4M |
| 4300065372 TRIM SET,CONTROL VALVE,DWG.118-7618,FOR | C | Reduce | Slow-moving | 2 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 377.1M |
| 4100050253 SEAT RING,VALVE,TYPE AN778,GRAPHITE | A | Reduce | Slow-moving | 35 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 372.2M |
| 4100064393 GAUGE,PRESSURE,0-16KG/CM2,4IN DIAL | A | TransferNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | transfer 1 from 4100064605 | 0% | – |
| 4300015164Long-lead SLEEVE,SHAFT,DWG.456-9747,FOR PP-1448B | B | Reduce | Slow-moving | 30 EA | 5 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 359.8M |
| 4300055451 POSITIONER,VALVE,DWG.427-1646,FOR TCV-12 | C | Reduce | Slow-moving | 9 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 359.3M |
| 4100050651Long-lead SEAT RING,VALVE,MODEL SK982,A105 | B | Reduce | Slow-moving | 42 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 357.2M |
| 4300012471Long-lead IMPELLER,DWG.214-8960,FOR PP-745 | B | Reduce | Slow-moving | 4 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 353.2M |
| 4100054335Safety-criticalLong-leadSign-off SWITCH,LIMIT,MODEL HR328,VITON | S | Reduce | Slow-moving | 59 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 339.6M |
| 4300059568 COUPLING,DWG.282-1232,FOR KC-984C | S | Reduce | Slow-moving | 39 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 333.7M |
| 4100012094 COUPLING,MODEL NI577,A182F11 | A | Reduce | Slow-moving | 41 SET | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 325.1M |
| 4300037928Long-lead POSITIONER,VALVE,DWG.671-9954,FOR PCV-39 | A | Reduce | Slow-moving | 14 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 323.7M |
| 4300027953 TRIM SET,CONTROL VALVE,DWG.588-5315,FOR | A | Reduce | Slow-moving | 6 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 314.0M |
| 4300021251Long-lead BEARING,THRUST PAD,DWG.520-6840,FOR KC-1 | A | Reduce | Slow-moving | 6 SET | 1 | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 313.3M |
| 4100046532Safety-critical PACKING SET,VALVE,TYPE TL515,MONEL | A | ReorderNormal | Slow-moving | 2 SET | – | 0 / 0 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 3.8M |
| 4100005491 SEAL,MECHANICAL,TYPE WL931,CS | C | Reduce | Slow-moving | 5 SET | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 283.8M |
| 4100006551 SEAL,MECHANICAL,SIZE UR238,CS | B | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 283.8M |
| 4100066992Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,SIZE JR376,VITON | A | Reduce | Slow-moving | 35 EA | 1 | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 279.9M |
| 4300024150 POSITIONER,VALVE,DWG.377-2513,FOR FCV-44 | C | Reduce | Slow-moving | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 279.4M |
| 4300021303 DEMISTER PAD,DWG.966-2648,FOR VD-1232 | A | Reduce | Slow-moving | 20 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 277.7M |
| 4100093593Long-lead TUBE PLUG,EXCHANGER,TYPE PY213,CS | B | ReorderNormal | Slow-moving | 2 EA | – | 1 / 3 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 674,760 |
| 4100038301 VALVE,NEEDLE,1/4IN ODT,6000PSI,SS316 | B | Reduce | Slow-moving | 104 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 268.1M |
| 4300026630Long-lead IMPELLER,DWG.607-3719,FOR PP-1194B | A | Reduce | Slow-moving | 6 EA | 1 | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 267.6M |
| 4100044174Long-lead TRIM SET,CONTROL VALVE,MODEL CH513,PTFE | B | Reduce | Slow-moving | 3 SET | 2 | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 254.5M |
| 4100002246 BEARING,ROLLER,CYL,1ROW,7217BDB | C | Reduce | Slow-moving | 55 EA | 2 | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 250.8M |
| 4100013480 RING,WEAR,TYPE AF486,INCOLOY | A | Reduce | Slow-moving | 33 EA | – | 1 / 2 | 2 / 2 / 3 | – | 0% | −Rp 245.6M |
| 4300031057 POSITIONER,VALVE,DWG.836-8655,FOR PCV-17 | C | Reduce | Slow-moving | 6 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 239.5M |
| 4100092383 GREASE,POLYUREA,NLGI 2,180KG | B | Reduce | Slow-moving | 1,336 KG | – | 371 / 964 | don't stock | – | 3% | −Rp 238.5M |
| 4300010081 TRIM SET,CONTROL VALVE,DWG.802-8767,FOR | C | Reduce | Slow-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 235.5M |
| 4300044990 TRIM SET,CONTROL VALVE,DWG.712-4719,FOR | C | Reduce | Slow-moving | 3 SET | – | 0 / 0 | don't stock | – | 1% | −Rp 235.5M |
| 4300065738 TRIM SET,CONTROL VALVE,DWG.650-1329,FOR | C | Reduce | Slow-moving | 3 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 235.5M |
| 4300028964Long-lead BEARING,JOURNAL,DWG.849-3712,FOR KC-223 | A | Reduce | Slow-moving | 3 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 235.0M |
| 4300031739Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,DWG.711-8826,FOR PRV | S | Reduce | Slow-moving | 12 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 234.5M |
| 4100047815 DIAPHRAGM,ACTUATOR,MODEL BT304,A105 | C | Reduce | Slow-moving | 54 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 232.3M |
| 4300057046 POSITIONER,VALVE,DWG.789-7783,FOR TCV-12 | C | Reduce | Slow-moving | 4 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 231.0M |
| 4300013893Long-lead BEARING,JOURNAL,DWG.555-9072,FOR KT-308B | A | Reduce | Slow-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 229.2M |
| 4100082146 BEARING,JOURNAL,TYPE DY422,INCOLOY | A | Reduce | Slow-moving | 3 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 219.3M |
| 4300061390 BEARING,JOURNAL,DWG.243-1834,FOR KC-890A | S | Reduce | Slow-moving | 1 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 219.3M |
| 4300035071 TRIM SET,CONTROL VALVE,DWG.633-4297,FOR | S | Reduce | Slow-moving | 1 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 217.5M |
| 4100062582Long-lead THERMOWELL,MODEL IH758,MONEL | A | Reduce | Slow-moving | 25 EA | 13 | 0 / 0 | 6 / 7 / 10 | – | 0% | −Rp 211.6M |
| 4100007703 IMPELLER,MODEL QG966,A105 | S | Reduce | Slow-moving | 1 EA | 2 | 1 / 2 | don't stock | – | 0% | −Rp 208.6M |
| 4300049268 POSITIONER,VALVE,DWG.209-1986,FOR PCV-64 | B | Reduce | Slow-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 199.6M |
| 4300018516Safety-criticalLong-lead SPRING,SAFETY VALVE,DWG.241-9369,FOR PRV | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 0% | Rp 6.3M |
| 4300073301 SEAT RING,VALVE,DWG.706-3803,FOR FCV-108 | A | Reduce | Slow-moving | 19 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 191.8M |