Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 22 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300042890Sign-off BEARING,THRUST PAD,DWG.141-8626,FOR KT-7 | S | Reduce | Potentially obsolete | 115 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 25.2B |
| 4300066316 POSITIONER,VALVE,DWG.960-5905,FOR LCV-16 | A | ReorderNormal | Below reorder point | 3 EA | – | 1 / 2 | 4 / 4 / 6 | 3 by 01 Oct 2026 | 2% | Rp 119.8M |
| 4300002661Sign-off TRIM SET,CONTROL VALVE,DWG.690-4047,FOR | A | Reduce | Non-moving | 309 SET | – | 4 / 9 | don't stock | – | 0% | −Rp 24.3B |
| 4100025027 STUDBOLT,5/8INX85MM,B8M/8M | A | ReorderNormal | Slow-moving | 6 EA | – | 2 / 4 | 27 / 27 / 55 | 49 by 01 Oct 2026 | 2% | Rp 1.9M |
| 4100027510 STUDBOLT,1INX95MM,B7/2H | A | ReorderNormal | Below reorder point | 18 EA | – | 9 / 20 | 59 / 60 / 120 | 102 by 01 Oct 2026 | 2% | Rp 3.9M |
| 4300032784Sign-off VALVE,GOVERNOR,DWG.429-4839,FOR KT-624A | S | Reduce | Potentially obsolete | 97 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 23.1B |
| 4300000432Sign-off BEARING,JOURNAL,DWG.564-9398,FOR KT-202 | S | Reduce | Potentially obsolete | 105 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 23.0B |
| 4100047103 DIAPHRAGM,ACTUATOR,MODEL AV244,MONEL | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 4 / 4 / 6 | 4 by 01 Oct 2026 | 2% | Rp 17.5M |
| 4200001385 GLAND,CABLE,SIZE YL811,CS | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 3 | 4 / 4 / 9 | 7 by 01 Oct 2026 | 2% | Rp 889,553 |
| 4100087984Sign-off BLADE,ROTOR,SIZE HR661,A182F11 | A | Reduce | Non-moving | 63 SET | – | 0 / 0 | 2 / 3 / 4 | – | 0% | −Rp 22.5B |
| 4200008323 CABLE,INSTRUMENT,8PR X 1.5MM2,ARMOURED | A | TransferNormal | Slow-moving | 25 M | – | 16 / 26 | 49 / 50 / 100 | transfer 75 from 4200009142 | 2% | – |
| 4300040223Sign-off BEARING,JOURNAL,DWG.715-8833,FOR KT-419A | A | Reduce | Non-moving | 102 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 22.1B |
| 4300023603Sign-off BEARING,THRUST PAD,DWG.382-5575,FOR KT-8 | A | Reduce | Non-moving | 102 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 22.1B |
| 4100058304 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF | C | TransferHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 1 | transfer 1 from 4100057267 | 5% | – |
| 4300062525Sign-off BEARING,THRUST PAD,DWG.742-9434,FOR KT-8 | S | Reduce | Potentially obsolete | 100 SET | – | 4 / 9 | don't stock | – | 0% | −Rp 21.9B |
| 4100005704 SEAL,MECHANICAL,SIZE UP305,CS | A | ReorderNormal | Slow-moving | 2 SET | – | 1 / 3 | 3 / 3 / 4 | 2 by 01 Oct 2026 | 2% | Rp 189.2M |
| 4100011727 COUPLING,MODEL AO562,MONEL | C | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 5% | Rp 8.6M |
| 4300017017Sign-off BLADE,ROTOR,DWG.199-4131,FOR KT-264A | S | Reduce | Non-moving | 57 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 21.7B |
| 4100000731 BEARING,BALL,ANGULAR,NU311 | A | ReorderNormal | Below reorder point | 3 EA | – | 1 / 2 | 5 / 5 / 12 | 9 by 01 Oct 2026 | 2% | Rp 5.8M |
| 4100050611Long-lead SEAT RING,VALVE,TYPE ZH917,CS | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 3 / 3 / 5 | 3 by 01 Oct 2026 | 2% | Rp 30.6M |
| 4300014975Sign-off BEARING,THRUST PAD,DWG.758-2356,FOR KC-2 | B | Reduce | Non-moving | 95 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 20.8B |
| 4100027550 STUDBOLT,7/8INX45MM,B8M/8M | A | ReorderNormal | Slow-moving | 5 EA | – | 1 / 2 | 27 / 27 / 54 | 49 by 01 Oct 2026 | 2% | Rp 1.9M |
| 4100090379Sign-off VALVE,GOVERNOR,SIZE OU84,SS316 | A | Reduce | Non-moving | 86 ASS | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 20.3B |
| 4100040047 CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316 | A | TransferNormal | Below reorder point | 2 EA | – | 1 / 2 | 4 / 4 / 9 | transfer 7 from 4100040931 | 2% | – |
| 4100084500Sign-off SEAL,LABYRINTH,SIZE ZA516,NBR | S | Reduce | Non-moving | 210 SET | – | 10 / 31 | don't stock | – | 0% | −Rp 19.9B |
| 4300019407Safety-critical DISC,SAFETY VALVE,DWG.744-3405,FOR PRV-1 | A | ReorderNormal | Below reorder point | 6 EA | – | 1 / 3 | 6 / 7 / 10 | 4 by 01 Oct 2026 | 2% | Rp 50.2M |
| 4100020013 O-RING,EPDM,83MM ID,2.5MM CS | S | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 3 | 3 by 01 Oct 2026 | 10% | Rp 661,716 |
| 4300033066Sign-off BEARING,JOURNAL,DWG.289-2816,FOR KT-624A | S | Reduce | Potentially obsolete | 89 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 19.5B |
| 4300042365Sign-off BEARING,JOURNAL,DWG.554-5540,FOR KC-210D | S | Reduce | Potentially obsolete | 39 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 19.4B |
| 4100000182Sign-off BEARING,ROLLER,CYL,1ROW,6313 C3 | A | Reduce | Excess | 4,534 EA | 71 | 87 / 212 | 17 / 21 / 33 | – | 0% | −Rp 19.4B |
| 4100068240Safety-criticalSign-off DISC,SAFETY VALVE,TYPE TN130,A182F11 | S | Reduce | Non-moving | 1,544 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 19.4B |
| 4100005461 SEAL,MECHANICAL,SIZE RQ741,MONEL | A | ReorderNormal | Slow-moving | 2 SET | – | 1 / 2 | 3 / 3 / 4 | 2 by 01 Oct 2026 | 2% | Rp 189.2M |
| 4300059683 THERMOWELL,DWG.287-6281,FOR TEL-1939 | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 4% | Rp 6.1M |
| 4100008911 SLEEVE,SHAFT,MODEL LQ969,NBR | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 3 / 3 / 5 | 3 by 01 Oct 2026 | 2% | Rp 24.3M |
| 4300003671Sign-off BEARING,JOURNAL,DWG.900-4575,FOR KT-397A | A | Reduce | Non-moving | 88 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 19.1B |
| 4200011116 FAN,COOLING MOTOR,DWG.429-6924,FOR PP-21 | S | ReorderHigh | Stockout | 0 EA | – | 1 / 2 | 0 / 0 / 2 | 2 by 01 Oct 2026 | 9% | Rp 2.5M |
| 4300033168Sign-off BEARING,THRUST PAD,DWG.504-5968,FOR KT-6 | S | Reduce | Potentially obsolete | 84 SET | – | 4 / 11 | don't stock | – | 0% | −Rp 18.4B |
| 4300037695 SLEEVE,SHAFT,DWG.960-2684,FOR PP-1213 | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 4% | Rp 8.1M |
| 4300043172Sign-off BEARING,THRUST PAD,DWG.715-9195,FOR KT-7 | S | Reduce | Potentially obsolete | 83 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 18.2B |
| 4100026963 STUDBOLT,1/2INX60MM,B8M/8M | A | ReorderNormal | Slow-moving | 12 EA | – | 8 / 15 | 44 / 44 / 88 | 76 by 01 Oct 2026 | 2% | Rp 1.2M |
| 4300011714Sign-off BEARING,THRUST PAD,DWG.127-9635,FOR KT-3 | S | Reduce | Potentially obsolete | 82 SET | – | 3 / 9 | don't stock | – | 0% | −Rp 18.0B |
| 4300005461Sign-off BEARING,JOURNAL,DWG.646-4211,FOR KT-460B | A | Reduce | Non-moving | 83 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 18.0B |
| 4100029100 PIPE,3/4IN,SCH40,SS316,SMLS,6M LG | A | ReorderNormal | Below reorder point | 5 LG | – | 1 / 3 | 6 / 6 / 12 | 7 by 01 Oct 2026 | 2% | Rp 21.0M |
| 4100076511 CERAMIC FIBER,BLANKET,50T,128KG/M3,1260C | S | TransferHigh | Stockout | 0 RL | – | 0 / 0 | 0 / 0 / 2 | transfer 2 from 4100075418 | 9% | – |
| 4100019838 O-RING,VITON,83MM ID,3.5MM CS | A | ReorderNormal | Slow-moving | 1 EA | – | 0 / 0 | 3 / 3 / 6 | 5 by 01 Oct 2026 | 2% | Rp 198,420 |
| 4200002827 GLAND,CABLE,TYPE NH907,INCOLOY | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 3 / 3 / 6 | 5 by 01 Oct 2026 | 2% | Rp 919,575 |
| 4300040146Sign-off BEARING,JOURNAL,DWG.979-6862,FOR KT-419A | A | Reduce | Non-moving | 80 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 17.3B |
| 4300027214Sign-off IMPELLER,DWG.570-5609,FOR PP-1764 | B | Reduce | Non-moving | 168 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 17.2B |
| 4300015502Sign-off BEARING,THRUST PAD,DWG.108-7548,FOR KC-3 | A | Reduce | Slow-moving | 79 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 17.1B |
| 4300038168Sign-off TRIM SET,CONTROL VALVE,DWG.470-4972,FOR | B | Reduce | Non-moving | 216 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 17.0B |