Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 21 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100026543 STUDBOLT,7/8INX80MM,B8M/8M | A | ReorderNormal | Slow-moving | 4 EA | – | 1 / 3 | 11 / 12 / 27 | 23 by 01 Oct 2026 | 3% | Rp 1.9M |
| 4100047235 DIAPHRAGM,ACTUATOR,SIZE KA639,SS304 | A | ReorderNormal | Below reorder point | 1 EA | – | 1 / 2 | 3 / 3 / 4 | 3 by 01 Oct 2026 | 3% | Rp 13.2M |
| 4100075647 CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C | A | TransferNormal | Slow-moving | 3 RL | – | 1 / 2 | 5 / 6 / 14 | transfer 11 from 4100076053 | 3% | – |
| 4100103722 TAPE,PTFE,25MMX15M | C | TransferNormal | Below reorder point | 1 RL | – | 1 / 2 | 5 / 5 / 8 | transfer 7 from 4100103558, 4100104039, 4100103642 | 7% | – |
| 4100103805 TAPE,PTFE,25MMX10M | C | ReorderNormal | Below reorder point | 2 RL | – | 1 / 2 | 6 / 6 / 10 | 8 by 01 Oct 2026 | 7% | Rp 104,776 |
| 4300008803Safety-critical NOZZLE,SAFETY VALVE,DWG.750-8988,FOR PRV | S | ReorderNormal | Slow-moving | 2 EA | – | 1 / 3 | 4 / 4 / 6 | 4 by 01 Oct 2026 | 3% | Rp 81.1M |
| 4300065707 SEAT RING,VALVE,DWG.569-7672,FOR TCV-131 | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 7% | Rp 11.3M |
| 4200000484 TERMINAL,LUG,RING,8X5MM,CRIMP | A | ReorderNormal | Slow-moving | 75 EA | – | 39 / 62 | 252 / 260 / 520 | 445 by 01 Oct 2026 | 3% | Rp 903,795 |
| 4100093458Long-lead TUBE PLUG,EXCHANGER,SIZE LW281,SS304 | A | ReorderNormal | Below reorder point | 3 EA | – | 2 / 3 | 6 / 6 / 9 | 6 by 01 Oct 2026 | 3% | Rp 9.6M |
| 4300053370Sign-off SEAL,LABYRINTH,DWG.334-4885,FOR KC-222B | A | Reduce | Non-moving | 343 SET | – | 10 / 28 | 0 / 0 / 1 | – | 0% | −Rp 32.3B |
| 4300037827 RING,WEAR,DWG.104-3517,FOR PP-942D | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 2 | 2 by 01 Oct 2026 | 7% | Rp 5.7M |
| 4100043783Long-lead TRIM SET,CONTROL VALVE,TYPE QO725,VITON | A | ReorderNormal | Below reorder point | 3 SET | – | 1 / 2 | 4 / 4 / 6 | 3 by 01 Oct 2026 | 3% | Rp 100.2M |
| 4100055430Long-leadSign-off TRANSMITTER,PRESS,MODEL DY707,INCOLOY | A | Reduce | Excess | 756 EA | 9 | 15 / 28 | 8 / 11 / 14 | – | 0% | −Rp 32.0B |
| 4200005196 LAMP,LED,36W,24VDC,E27 | B | ReorderNormal | Slow-moving | 2 EA | – | 1 / 3 | 3 / 3 / 6 | 4 by 01 Oct 2026 | 4% | Rp 679,424 |
| 4100091603 GREASE,LITHIUM,NLGI 2,16KG | A | ReorderNormal | Slow-moving | 38 KG | – | 13 / 32 | 194 / 218 / 1,075 | 1,037 by 01 Oct 2026 | 3% | Rp 95.3M |
| 4300035320Sign-off TRIM SET,CONTROL VALVE,DWG.448-3595,FOR | B | Reduce | Non-moving | 405 SET | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 31.7B |
| 4300074763Sign-off BEARING,JOURNAL,DWG.451-9674,FOR KC-853D | B | Reduce | Non-moving | 144 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 31.6B |
| 4100017960 GASKET,SW,3IN,300#,GR/304 | A | ReorderNormal | Critical insurance spare | 2 EA | – | 2 / 3 | 4 / 4 / 8 | 6 by 01 Oct 2026 | 3% | Rp 1.3M |
| 4300059510Sign-off BEARING,JOURNAL,DWG.508-4052,FOR KC-984C | S | Reduce | Potentially obsolete | 142 SET | – | 5 / 11 | don't stock | – | 0% | −Rp 31.1B |
| 4300008110Safety-critical NOZZLE,SAFETY VALVE,DWG.456-3720,FOR PRV | A | ReorderNormal | Below reorder point | 2 EA | – | 0 / 0 | 3 / 3 / 5 | 3 by 01 Oct 2026 | 3% | Rp 60.8M |
| 4100024593 STUDBOLT,3/4INX65MM,B8M/8M | A | ReorderNormal | Slow-moving | 78 EA | – | 13 / 36 | 99 / 118 / 332 | 254 by 01 Oct 2026 | 3% | Rp 4.0M |
| 4100107173 OIL,LUBRICANT,ISO VG 32,SYNTHETIC,5L | A | ReorderNormal | Below reorder point | 29 L | – | 37 / 55 | 34 / 40 / 117 | 88 by 01 Oct 2026 | 3% | Rp 20.8M |
| 4300018762 RING,WEAR,DWG.575-8357,FOR PP-1892B | S | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 15% | Rp 8.2M |
| 4100027642Safety-critical STUDBOLT,1INX75MM,B8M/8M | A | ReorderNormal | Critical insurance spare | 10 EA | – | 5 / 14 | 27 / 27 / 54 | 44 by 01 Oct 2026 | 3% | Rp 1.7M |
| 4100028481 PIPE,10IN,SCH80,SS316,SMLS,6M LG | A | ReorderNormal | Slow-moving | 2 LG | – | 1 / 2 | 4 / 4 / 12 | 10 by 01 Oct 2026 | 3% | Rp 21.7M |
| 4100076683 CERAMIC FIBER,BLANKET,50T,128KG/M3,1260C | S | TransferNormal | Slow-moving | 1 RL | – | 1 / 3 | 1 / 1 / 6 | transfer 5 from 4100075418 | 15% | – |
| 4100024203Safety-critical STUDBOLT,5/8INX115MM,B8M/8M | A | ReorderNormal | Below reorder point | 390 EA | – | 464 / 1,158 | 395 / 545 / 1,213 | 823 by 01 Oct 2026 | 3% | Rp 40.0M |
| 4100026971Safety-critical STUDBOLT,1/2INX115MM,B7/2H | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 39 / 40 / 80 | 78 by 01 Oct 2026 | 3% | Rp 2.9M |
| 4300011255Sign-off VALVE,GOVERNOR,DWG.211-6002,FOR KT-383A | S | Reduce | Potentially obsolete | 125 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 29.8B |
| 4300068872Sign-off BEARING,JOURNAL,DWG.204-7311,FOR KC-732D | A | Reduce | Non-moving | 135 SET | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 29.4B |
| 4300041988Long-lead TRIM SET,CONTROL VALVE,DWG.162-1687,FOR | B | ReorderNormal | Slow-moving | 2 SET | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 4% | Rp 52.4M |
| 4300046279Sign-off BEARING,JOURNAL,DWG.522-2455,FOR KC-538 | S | Reduce | Potentially obsolete | 133 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 29.2B |
| 4300070224Sign-off BEARING,THRUST PAD,DWG.377-8479,FOR KT-5 | A | Reduce | Non-moving | 133 SET | – | 5 / 10 | 0 / 0 / 1 | – | 0% | −Rp 28.9B |
| 4100080654Long-lead BEARING,JOURNAL,TYPE MU467,NBR | A | ReorderNormal | Slow-moving | 5 SET | 2 | 1 / 2 | 5 / 8 / 10 | 3 by 01 Oct 2026 | 3% | Rp 533.9M |
| 4100040496 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | C | TransferHigh | Stockout | 0 EA | – | 1 / 2 | 1 / 1 / 2 | transfer 2 from 4100040262 | 6% | – |
| 4100091960 GREASE,POLYUREA,NLGI 2,16KG | A | ReorderNormal | Below reorder point | 10 KG | – | 8 / 12 | 49 / 50 / 100 | 90 by 01 Oct 2026 | 3% | Rp 16.1M |
| 4100084333Sign-off BEARING,THRUST PAD,TYPE XK120,GRAPHITE | A | Reduce | Non-moving | 130 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 28.3B |
| 4100005685Sign-off SEAL,MECHANICAL,SIZE CD520,SS316 | A | Reduce | Non-moving | 300 SET | – | 3 / 10 | 0 / 0 / 1 | – | 0% | −Rp 28.3B |
| 4100019905Safety-critical O-RING,VITON,224MM ID,5.3MM CS | A | ReorderNormal | Below reorder point | 4 EA | – | 3 / 7 | 12 / 12 / 22 | 18 by 01 Oct 2026 | 3% | Rp 409,626 |
| 4100061807 THERMOCOUPLE,J-2ELMNT,3.2X3800LG | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 3 | 4 / 4 / 8 | 6 by 01 Oct 2026 | 3% | Rp 38.4M |
| 4300038021Sign-off TRIM SET,CONTROL VALVE,DWG.175-7643,FOR | B | Reduce | Non-moving | 342 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 26.8B |
| 4100036509 VALVE,GLOBE,1/2IN,150#,A105,SW | C | ReorderHigh | Stockout | 0 EA | – | 1 / 2 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 6% | Rp 2.6M |
| 4300026381Sign-off BEARING,THRUST PAD,DWG.648-3858,FOR KC-2 | S | Reduce | Potentially obsolete | 121 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 26.5B |
| 4100003120 BEARING,BALL,1ROW,DEEP GROOVE,NU305 C3 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 3 / 3 / 5 | 4 by 01 Oct 2026 | 3% | Rp 5.7M |
| 4100014754Safety-critical GASKET,SW,4IN,150#,GRAPHITE | A | ReorderNormal | Below reorder point | 6 EA | – | 3 / 9 | 10 / 11 / 32 | 26 by 01 Oct 2026 | 3% | Rp 5.6M |
| 4300039576Sign-off BEARING,THRUST PAD,DWG.327-7279,FOR KT-4 | A | Reduce | Non-moving | 120 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 26.1B |
| 4300074143Sign-off TRIM SET,CONTROL VALVE,DWG.994-9217,FOR | B | Reduce | Non-moving | 330 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 25.9B |
| 4300038074 SLEEVE,SHAFT,DWG.138-8914,FOR PP-1598B | A | ReorderNormal | Below reorder point | 1 EA | – | 0 / 0 | 3 / 3 / 4 | 3 by 01 Oct 2026 | 3% | Rp 24.3M |
| 4200008302 CABLE,INSTRUMENT,2PR X 1.5MM2,ARMOURED | A | ReorderNormal | Slow-moving | 1 M | – | 1 / 3 | 10 / 10 / 20 | 15 by 01 Oct 2026 transfer 4 from 4200008641 | 3% | Rp 834,330 |
| 4200000780 TERMINAL,LUG,FORK,5.5X6MM,CRIMP | C | ReorderHigh | Stockout | 0 EA | – | 328 / 547 | 0 / 0 / 2,536 | 2,536 by 01 Oct 2026 | 6% | Rp 5.2M |