Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 23 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300057532Sign-off BEARING,JOURNAL,DWG.552-3302,FOR KC-235D | A | Reduce | Non-moving | 76 SET | – | 10 / 31 | don't stock | – | 0% | −Rp 16.7B |
| 4300033680Sign-off VALVE,GOVERNOR,DWG.495-6060,FOR KT-624A | S | Reduce | Potentially obsolete | 69 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 16.4B |
| 4300020381Sign-off POSITIONER,VALVE,DWG.411-7766,FOR PCV-43 | A | Reduce | Non-moving | 410 EA | – | 5 / 10 | don't stock | – | 0% | −Rp 16.4B |
| 4300017292Sign-off BLADE,ROTOR,DWG.412-5365,FOR KT-264A | S | Reduce | Non-moving | 42 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 16.0B |
| 4100093455Long-lead TUBE PLUG,EXCHANGER,MODEL GX784,SS316 | A | ReorderNormal | Slow-moving | 5 EA | 3 | 0 / 0 | 11 / 12 / 17 | 9 by 01 Oct 2026 | 2% | Rp 3.6M |
| 4300070474Long-leadSign-off BLADE,ROTOR,DWG.912-7135,FOR KT-513 | A | Reduce | Non-moving | 19 SET | 5 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 16.0B |
| 4200000931 TERMINAL,LUG,RING,1.25X5MM,CRIMP | A | ReorderNormal | Slow-moving | 293 EA | – | 78 / 246 | 493 / 500 / 1,000 | 707 by 01 Oct 2026 | 2% | Rp 1.4M |
| 4100084505Sign-off SEAL,LABYRINTH,SIZE GP190,CS | A | Reduce | Excess | 92 SET | 1 | 1 / 2 | 8 / 11 / 12 | – | 0% | −Rp 15.8B |
| 4300044656Sign-off BEARING,THRUST PAD,DWG.652-1023,FOR KC-2 | B | Reduce | Slow-moving | 73 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 15.8B |
| 4300047647 POSITIONER,VALVE,DWG.588-8164,FOR FCV-19 | B | ReorderNormal | Below reorder point | 1 EA | – | 1 / 3 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 2% | Rp 39.9M |
| 4100024822Safety-critical STUDBOLT,7/8INX100MM,B16/4 | A | ReorderNormal | Below reorder point | 78 EA | – | 14 / 32 | 104 / 119 / 365 | 287 by 01 Oct 2026 | 2% | Rp 10.9M |
| 4300046831Sign-off TRIM SET,CONTROL VALVE,DWG.284-7790,FOR | A | Reduce | Non-moving | 198 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 15.5B |
| 4100005834Sign-off SEAL,MECHANICAL,MODEL YJ232,PTFE | C | Reduce | Non-moving | 163 SET | – | 5 / 16 | don't stock | – | 0% | −Rp 15.4B |
| 4100031630 TEE,3/4IN,SCH80,A234WPB,BW | C | ReorderHigh | Stockout | 0 EA | – | 1 / 3 | 0 / 0 / 3 | 3 by 01 Oct 2026 | 3% | Rp 460,302 |
| 4100084561 SEAL,LABYRINTH,SIZE KV508,A105 | A | ReorderNormal | Critical insurance spare | 2 SET | – | 1 / 2 | 3 / 3 / 4 | 2 by 01 Oct 2026 | 2% | Rp 189.2M |
| 4300067522Sign-off POSITIONER,VALVE,DWG.521-1582,FOR PCV-19 | S | Reduce | Potentially obsolete | 371 EA | – | 10 / 27 | don't stock | – | 0% | −Rp 14.8B |
| 4300051726Sign-off BEARING,JOURNAL,DWG.637-1266,FOR KC-397A | A | Reduce | Slow-moving | 68 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 14.7B |
| 4100047077 DIAPHRAGM,ACTUATOR,SIZE MM165,SS304 | A | ReorderNormal | Slow-moving | 4 EA | – | 1 / 2 | 5 / 6 / 9 | 5 by 01 Oct 2026 | 1% | Rp 21.9M |
| 4100014505Long-lead GASKET,SHEET,12IN,150#,PTFE | A | ReorderNormal | Below reorder point | 14 EA | 12 | 7 / 14 | 26 / 35 / 79 | 53 by 01 Oct 2026 | 1% | Rp 2.8M |
| 4300044859Safety-criticalLong-lead SPRING,SAFETY VALVE,DWG.321-6873,FOR PRV | A | ReorderNormal | Below reorder point | 1 EA | 1 | 1 / 2 | 3 / 3 / 5 | 3 by 01 Oct 2026 | 1% | Rp 35.0M |
| 4200000357 TERMINAL,LUG,FORK,1.25X4MM,CRIMP | A | ReorderNormal | Slow-moving | 5 EA | – | 3 / 8 | 99 / 100 / 200 | 195 by 01 Oct 2026 | 1% | Rp 396,045 |
| 4300007980Sign-off BEARING,JOURNAL,DWG.294-2267,FOR KC-527 | A | Reduce | Non-moving | 64 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 14.0B |
| 4300023167Sign-off BEARING,THRUST PAD,DWG.931-5777,FOR KT-8 | A | Reduce | Non-moving | 65 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 14.0B |
| 4300002575Sign-off TRIM SET,CONTROL VALVE,DWG.730-2392,FOR | B | Reduce | Non-moving | 178 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 13.9B |
| 4100057029Sign-off TRANSMITTER,PRESS,SIZE AT947,A182F11 | A | Reduce | Non-moving | 405 EA | – | 10 / 29 | don't stock | – | 0% | −Rp 13.8B |
| 4100082609Sign-off BEARING,THRUST PAD,SIZE JG460,GRAPHITE | A | Reduce | Slow-moving | 71 SET | – | 1 / 2 | 5 / 6 / 8 | – | 0% | −Rp 13.8B |
| 4300040317Sign-off SEAL,LABYRINTH,DWG.720-8850,FOR KT-419A | A | Reduce | Non-moving | 147 SET | – | 4 / 12 | 0 / 0 / 1 | – | 0% | −Rp 13.8B |
| 4300038715Sign-off TRIM SET,CONTROL VALVE,DWG.445-2946,FOR | B | Reduce | Slow-moving | 175 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 13.7B |
| 4100083983Sign-off BEARING,THRUST PAD,MODEL YQ708,NBR | S | Reduce | Potentially obsolete | 62 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 13.6B |
| 4100005164Sign-off SEAL,MECHANICAL,TYPE WB489,NBR | A | Reduce | Excess | 160 SET | – | 8 / 16 | 10 / 15 / 17 | – | 0% | −Rp 13.5B |
| 4300006514Sign-off BEARING,THRUST PAD,DWG.679-7906,FOR KC-6 | A | Reduce | Non-moving | 61 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 13.4B |
| 4100009852Long-lead SLEEVE,SHAFT,SIZE NP593,VITON | B | ReorderNormal | Below reorder point | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 2% | Rp 21.2M |
| 4300060102Sign-off IMPELLER,DWG.356-3768,FOR PP-389 | B | Reduce | Non-moving | 128 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 13.0B |
| 4300013999Sign-off BEARING,JOURNAL,DWG.865-9598,FOR KT-308B | A | Reduce | Non-moving | 60 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 12.9B |
| 4100045376Safety-criticalLong-lead PACKING SET,VALVE,SIZE LZ906,A182F11 | A | ReorderNormal | Below reorder point | 6 SET | – | 1 / 3 | 5 / 7 / 11 | 5 by 01 Oct 2026 | 1% | Rp 22.8M |
| 4300060991Sign-off IMPELLER,DWG.423-2687,FOR PP-490 | S | Reduce | Excess | 139 EA | 2 | 1 / 3 | don't stock | – | 0% | −Rp 12.6B |
| 4100078099Sign-off BURNER TIP,TYPE EM980,A182F11 | A | Reduce | Non-moving | 816 EA | – | 10 / 30 | 2 / 2 / 3 | – | 0% | −Rp 12.6B |
| 4300000678Sign-off BLADE,ROTOR,DWG.103-7258,FOR KT-202 | S | Reduce | Potentially obsolete | 33 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 12.6B |
| 4300022992Sign-off BLADE,ROTOR,DWG.854-5510,FOR KT-856A | A | Reduce | Non-moving | 34 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 12.6B |
| 4100045889 PACKING SET,VALVE,SIZE DS488,PTFE | A | ReorderNormal | Slow-moving | 1 SET | – | 1 / 3 | 2 / 2 / 3 | 2 by 01 Oct 2026 | 1% | Rp 7.7M |
| 4100108034 OIL,LUBRICANT,ISO VG 68,MINERAL,5L | A | TransferNormal | Critical insurance spare | 2 L | – | 2 / 5 | 11 / 11 / 22 | transfer 20 from 4100107224 | 1% | – |
| 4300053466Sign-off BEARING,JOURNAL,DWG.834-6937,FOR KC-773A | S | Reduce | Potentially obsolete | 56 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 12.3B |
| 4300000850Sign-off VALVE,GOVERNOR,DWG.603-8266,FOR KT-202 | S | Reduce | Potentially obsolete | 100 ASS | – | 1 / 3 | don't stock | – | 0% | −Rp 12.3B |
| 4100001661 BEARING,BALL,ANGULAR,NU304-2Z | B | ReorderNormal | Slow-moving | 5 EA | – | 1 / 3 | 8 / 8 / 13 | 8 by 01 Oct 2026 | 2% | Rp 11.4M |
| 4100080753 BEARING,JOURNAL,SIZE AU67,SS304 | A | ReorderNormal | Slow-moving | 2 SET | – | 1 / 3 | 2 / 2 / 3 | 1 by 01 Oct 2026 | 1% | Rp 219.3M |
| 4100014772Safety-critical GASKET,SW,1-1/2IN,300#,PTFE | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 4 / 4 / 8 | 6 by 01 Oct 2026 | 1% | Rp 195,348 |
| 4300043851Sign-off BEARING,JOURNAL,DWG.874-2221,FOR KT-778A | S | Reduce | Potentially obsolete | 54 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 11.8B |
| 4100093574Long-lead TUBE PLUG,EXCHANGER,MODEL XG57,GRAPHITE | A | ReorderNormal | Slow-moving | 2 EA | 1 | 1 / 3 | 6 / 6 / 9 | 6 by 01 Oct 2026 | 1% | Rp 1.9M |
| 4300031783Sign-off TRIM SET,CONTROL VALVE,DWG.287-2156,FOR | B | Reduce | Non-moving | 150 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 11.8B |
| 4100015849Safety-critical GASKET,SW,1IN,300#,GR/304 | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 4 / 4 / 8 | 6 by 01 Oct 2026 | 1% | Rp 1.3M |