Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
860 spare parts
Order value Rp 8.9B · excess value Rp 106.7B · page 15 of 18
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100066953Safety-criticalSign-off SPRING,SAFETY VALVE,MODEL LO568,SS316 | S | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 8.8M |
| 4300006288Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.762-7599,FOR PRV | S | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 8.8M |
| 4100019521Safety-criticalLong-leadSign-off O-RING,EPDM,280MM ID,3.5MM CS | A | Reduce | Excess | 758 EA | – | 13 / 35 | 19 / 25 / 64 | – | 0% | −Rp 8.7M |
| 4100067878Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,TYPE WO963,CS | A | Reduce | Excess | 9 EA | 1 | 0 / 0 | 5 / 5 / 7 | – | 0% | −Rp 8.4M |
| 4100046673Safety-criticalSign-off PACKING SET,VALVE,TYPE GG142,NBR | C | Reduce | Slow-moving | 4 SET | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 7.7M |
| 4100016866Safety-criticalSign-off GASKET,SHEET,4IN,150#,PTFE | A | Reduce | Slow-moving | 13 EA | – | 1 / 2 | 2 / 2 / 4 | – | 0% | −Rp 7.2M |
| 4100054988Safety-criticalSign-off SWITCH,LIMIT,TYPE FC512,A182F11 | A | Reduce | Non-moving | 3 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 6.0M |
| 4100055238Safety-criticalSign-off SWITCH,LIMIT,TYPE HL327,SS304 | A | Reduce | Slow-moving | 7 EA | – | 0 / 0 | 0 / 0 / 6 | – | 0% | −Rp 6.0M |
| 4100025227Safety-critical STUDBOLT,7/8INX105MM,B7/2H | A | Monitor | Critical insurance spare | 9 EA | – | 2 / 6 | 0 / 0 / 27 | reorder ~28 Apr 2030 | 1% | – |
| 4100019799Safety-criticalSign-off O-RING,NBR,270MM ID,3.5MM CS | A | Reduce | Excess | 33 EA | – | 15 / 24 | 9 / 9 / 17 | – | 0% | −Rp 5.2M |
| 4100053848Safety-critical SWITCH,LIMIT,TYPE NT140,NBR | C | Monitor | Stockout | 0 EA | 3 | 0 / 0 | 2 / 2 / 4 | reorder ~13 Dec 2027 | 0% | – |
| 4100046274Safety-criticalSign-off PACKING SET,VALVE,TYPE MX325,A105 | A | Reduce | Non-moving | 3 SET | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 3.8M |
| 4100052805Safety-criticalLong-lead SOLENOID VALVE,SIZE FG705,GRAPHITE | B | Monitor | Slow-moving | 3 EA | – | 1 / 2 | 2 / 2 / 4 | reorder ~01 Jul 2027 | 0% | – |
| 4100024869Safety-criticalSign-off STUDBOLT,3/4INX95MM,B8M/8M | A | Reduce | Excess | 444 EA | – | 95 / 215 | 93 / 100 / 215 | – | 0% | −Rp 3.5M |
| 4100054056Safety-critical SWITCH,LIMIT,TYPE KM477,INCOLOY | A | Monitor | Insurance gap | 0 EA | 1 | 0 / 0 | 0 / 0 / 2 | reorder ~05 Aug 2063 | 0% | – |
| 4100024362Safety-criticalSign-off STUDBOLT,5/8INX30MM,B16/4 | A | Reduce | Excess | 571 EA | – | 188 / 503 | 98 / 122 / 459 | – | 0% | −Rp 2.7M |
| 4100027474Safety-critical STUDBOLT,3/4INX80MM,B16/4 | A | Monitor | Critical insurance spare | 10 EA | – | 2 / 5 | 0 / 0 / 27 | reorder ~31 Jul 2035 | 0% | – |
| 4100015694Safety-critical GASKET,RING,1-1/2IN,600#,GR/304 | A | Maintain | Critical insurance spare | 3 EA | – | 2 / 4 | 0 / 0 / 4 | – | 0% | – |
| 4100016093Safety-criticalSign-off GASKET,RING,12IN,150#,GRAPHITE | A | Reduce | Non-moving | 13 EA | – | 10 / 17 | 0 / 0 / 4 | – | 0% | −Rp 1.9M |
| 4100023694Safety-criticalSign-off O-RING,NBR,56MM ID,5.3MM CS | B | Reduce | Non-moving | 50 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | −Rp 1.9M |
| 4100023784Safety-critical O-RING,NBR,49MM ID,5.3MM CS | A | Maintain | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 3 | – | 0% | – |
| 4100017840Safety-criticalSign-off GASKET,SW,12IN,300#,PTFE | A | Reduce | Non-moving | 11 EA | – | 4 / 11 | 0 / 0 / 4 | – | 0% | −Rp 1.5M |
| 4100053941Safety-critical SWITCH,LIMIT,MODEL EU665,SS304 | A | Monitor | Slow-moving | 3 EA | – | 1 / 2 | 2 / 2 / 4 | reorder ~08 Mar 2028 | 0% | – |
| 4100018144Safety-criticalSign-off GASKET,SHEET,2IN,300#,GR/304 | A | Reduce | Non-moving | 14 EA | – | 10 / 18 | 4 / 4 / 8 | – | 0% | −Rp 1.3M |
| 4100018591Safety-criticalSign-off GASKET,SW,1/2IN,600#,GR/304 | B | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | −Rp 1.3M |
| 4300008048Safety-criticalLong-lead DISC,SAFETY VALVE,DWG.949-9112,FOR PRV-8 | A | Monitor | Slow-moving | 3 EA | 1 | 1 / 2 | 3 / 3 / 6 | reorder ~22 Jan 2029 | 0% | – |
| 4100017269Safety-critical GASKET,SW,3IN,150#,GR/304 | B | Monitor | Critical insurance spare | 2 EA | – | 1 / 3 | 0 / 0 / 4 | reorder ~08 Jul 2074 | 0% | – |
| 4100018424Safety-criticalSign-off GASKET,SW,4IN,300#,PTFE | B | Reduce | Non-moving | 9 EA | – | 3 / 6 | 0 / 0 / 4 | – | 0% | −Rp 1.1M |
| 4100026692Safety-critical STUDBOLT,1INX60MM,B8M/8M | A | Maintain | Healthy | 89 EA | – | 25 / 45 | 44 / 46 / 92 | – | 0% | – |
| 4100025547Safety-criticalSign-off STUDBOLT,3/4INX115MM,B7/2H | A | Reduce | Non-moving | 77 EA | – | 2 / 3 | 26 / 27 / 54 | – | 0% | −Rp 869,561 |
| 4100019241Safety-criticalSign-off GASKET,SW,1/4IN,150#,GRAPHITE | A | Reduce | Non-moving | 8 EA | – | 4 / 6 | 0 / 0 / 4 | – | 0% | −Rp 857,815 |
| 4100014252Safety-criticalSign-off GASKET,RING,1IN,300#,PTFE | A | Reduce | Excess | 41 EA | – | 9 / 18 | 10 / 12 / 35 | – | 0% | −Rp 760,809 |
| 4100014625Safety-criticalSign-off GASKET,RING,10IN,150#,GRAPHITE | A | Reduce | Excess | 51 EA | – | 8 / 22 | 16 / 18 / 48 | – | 0% | −Rp 643,361 |
| 4100020350Safety-criticalSign-off O-RING,EPDM,275MM ID,5.3MM CS | B | Reduce | Non-moving | 22 EA | – | 10 / 18 | 3 / 3 / 6 | – | 0% | −Rp 634,944 |
| 4300019230Safety-critical DISC,SAFETY VALVE,DWG.804-9777,FOR PRV-1 | S | Monitor | Slow-moving | 4 EA | – | 1 / 3 | 0 / 0 / 4 | – | 0% | – |
| 4100023579Safety-criticalSign-off O-RING,VITON,123MM ID,3.5MM CS | A | Reduce | Non-moving | 15 EA | – | 2 / 6 | 0 / 0 / 3 | – | 0% | −Rp 476,208 |
| 4100017697Safety-criticalSign-off GASKET,SW,4IN,150#,PTFE | S | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | −Rp 428,908 |
| 4100023016Safety-criticalSign-off O-RING,NBR,219MM ID,2.5MM CS | A | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | −Rp 396,840 |
| 4100020062Safety-criticalSign-off O-RING,EPDM,37MM ID,3.5MM CS | S | Reduce | Non-moving | 10 EA | – | 4 / 9 | 0 / 0 / 3 | – | 0% | −Rp 277,788 |
| 4100014935Safety-criticalSign-off GASKET,SW,1-1/2IN,150#,GR/304 | A | Reduce | Excess | 14 EA | – | 0 / 0 | 6 / 6 / 12 | – | 0% | −Rp 273,412 |
| 4100017603Safety-critical GASKET,SW,6IN,600#,GRAPHITE | A | Monitor | Slow-moving | 12 EA | – | 0 / 0 | 7 / 7 / 14 | – | 0% | – |
| 4100022777Safety-criticalSign-off O-RING,EPDM,242MM ID,2.5MM CS | A | Reduce | Non-moving | 9 EA | – | 2 / 5 | 0 / 0 / 3 | – | 0% | −Rp 238,104 |
| 4100021964Safety-criticalSign-off O-RING,VITON,65MM ID,5.3MM CS | A | Reduce | Non-moving | 9 EA | – | 3 / 6 | 0 / 0 / 3 | – | 0% | −Rp 238,104 |
| 4100018562Safety-criticalSign-off GASKET,SHEET,12IN,150#,GR/304 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 4 / 4 / 8 | – | 0% | −Rp 214,454 |
| 4100016563Safety-criticalSign-off GASKET,SHEET,1/4IN,150#,GRAPHITE | A | Reduce | Non-moving | 5 EA | – | 3 / 4 | 0 / 0 / 4 | – | 0% | −Rp 214,454 |
| 4100021574Safety-criticalSign-off O-RING,EPDM,201MM ID,3.5MM CS | B | Reduce | Slow-moving | 19 EA | – | 0 / 0 | 7 / 7 / 14 | – | 0% | −Rp 198,420 |
| 4100022520Safety-criticalSign-off O-RING,NBR,145MM ID,2.5MM CS | A | Reduce | Non-moving | 8 EA | – | 4 / 10 | 0 / 0 / 3 | – | 0% | −Rp 198,420 |
| 4100014225Safety-criticalSign-off GASKET,SW,8IN,600#,GRAPHITE | A | Reduce | Excess | 99 EA | 18 | 5 / 8 | 22 / 28 / 93 | – | 0% | −Rp 191,637 |
| 4100023259Safety-criticalSign-off O-RING,VITON,80MM ID,3.5MM CS | S | Reduce | Non-moving | 7 EA | – | 4 / 9 | 0 / 0 / 3 | – | 0% | −Rp 158,736 |
| 4100018570Safety-critical GASKET,RING,6IN,150#,PTFE | C | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~28 Aug 2403 | 0% | – |