Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 18 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100025846 STUDBOLT,1/2INX90MM,B16/4 | C | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 7 / 8 / 35 | 33 by 01 Oct 2026 | 30% | Rp 1.8M |
| 4300035679Sign-off BEARING,JOURNAL,DWG.565-7375,FOR KC-422A | S | Reduce | Potentially obsolete | 617 SET | – | 10 / 25 | don't stock | – | 0% | −Rp 135.3B |
| 4100071608 FIREBRICK,INSUL,28,76T,114W,230L | A | ReorderNormal | Below reorder point | 2,660 EA | – | 1,325 / 3,344 | 3,655 / 5,006 / 5,940 | 3,280 by 01 Oct 2026 | 13% | Rp 478.3M |
| 4100016135Safety-critical GASKET,SW,3IN,150#,PTFE | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 7 / 8 / 22 | 20 by 01 Oct 2026 | 13% | Rp 1.8M |
| 4100051301 SEAT RING,VALVE,SIZE LQ493,INCOLOY | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 1 / 1 / 3 | 3 by 01 Oct 2026 | 28% | Rp 33.8M |
| 4100079028 ANCHOR,REFRACTORY,SIZE TY222,A182F11 | A | ReorderNormal | Slow-moving | 1,040 EA | – | 39 / 111 | 1,143 / 1,753 / 2,840 | 1,800 by 01 Oct 2026 | 12% | Rp 75.6M |
| 4100024877 STUDBOLT,1/2INX70MM,B16/4 | A | ReorderNormal | Below reorder point | 13 EA | – | 12 / 26 | 40 / 42 / 91 | 78 by 01 Oct 2026 | 12% | Rp 5.1M |
| 4300001901Safety-critical SPRING,SAFETY VALVE,DWG.878-1852,FOR PRV | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 4 / 4 / 6 | 5 by 01 Oct 2026 | 12% | Rp 44.1M |
| 4100043951 TRIM SET,CONTROL VALVE,TYPE OO79,SS316 | C | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 27% | Rp 78.5M |
| 4100015549 GASKET,SHEET,8IN,600#,GR/304 | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 6 / 6 / 11 | 9 by 01 Oct 2026 | 12% | Rp 1.9M |
| 4200008235 CABLE,INSTRUMENT,4PR X 0.75MM2,ARMOURED | C | ReorderNormal | Below reorder point | 21 M | – | 7 / 12 | 31 / 44 / 193 | 172 by 01 Oct 2026 | 26% | Rp 7.3M |
| 4300014760 TRIM SET,CONTROL VALVE,DWG.917-9498,FOR | C | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 26% | Rp 78.5M |
| 4300067601 COUPLING,DWG.313-7620,FOR PP-1192 | A | ReorderNormal | Slow-moving | 1 SET | – | 0 / 0 | 2 / 2 / 4 | 3 by 01 Oct 2026 | 11% | Rp 102.4M |
| 4100024473Safety-critical STUDBOLT,1/2INX85MM,B16/4 | A | ReorderNormal | Below reorder point | 23 EA | – | 13 / 23 | 47 / 63 / 211 | 188 by 01 Oct 2026 | 11% | Rp 12.5M |
| 4200000319 TERMINAL,LUG,RING,5.5X3MM,CRIMP | A | ReorderNormal | Below reorder point | 100 EA | – | 17 / 45 | 207 / 220 / 447 | 336 by 01 Oct 2026 transfer 11 from 4200001273 | 11% | Rp 682,416 |
| 4100058923Long-lead TRANSMITTER,TEMP,SIZE XH198,INCOLOY | A | ReorderNormal | Slow-moving | 2 EA | 2 | 0 / 0 | 7 / 8 / 12 | 8 by 01 Oct 2026 | 11% | Rp 70.4M |
| 4100086395 FILTER ELEMENT,SEAL GAS,3MICRON,P/N FE-3 | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 3 | 5 / 5 / 12 | 10 by 01 Oct 2026 | 11% | Rp 27.7M |
| 4100050038 POSITIONER,VALVE,MODEL LC70,CS | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 25% | Rp 39.9M |
| 4300040482Sign-off SEAL,LABYRINTH,DWG.274-3179,FOR KT-419A | A | Reduce | Non-moving | 1,159 SET | – | 10 / 32 | 0 / 0 / 1 | – | 0% | −Rp 109.5B |
| 4100025354 STUDBOLT,1/2INX50MM,B7/2H | A | ReorderNormal | Slow-moving | 88 EA | – | 19 / 36 | 86 / 96 / 262 | 174 by 01 Oct 2026 | 11% | Rp 18.3M |
| 4100026430 STUDBOLT,5/8INX65MM,B8M/8M | A | ReorderNormal | TAM reserve | 17 EA | – | 7 / 16 | 51 / 54 / 102 | 85 by 01 Oct 2026 | 11% | Rp 3.2M |
| 4300008583 TRIM SET,CONTROL VALVE,DWG.799-9432,FOR | C | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 24% | Rp 78.5M |
| 4100027655 STUDBOLT,7/8INX80MM,B16/4 | A | ReorderNormal | Slow-moving | 9 EA | – | 7 / 14 | 52 / 54 / 102 | 93 by 01 Oct 2026 | 11% | Rp 3.5M |
| 4100016143Safety-critical GASKET,RING,6IN,300#,GR/304 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 6 / 6 / 15 | 14 by 01 Oct 2026 | 10% | Rp 28.7M |
| 4100099761 BOLT,ANCHOR,SIZE PF180,A105 | A | ReorderNormal | Below reorder point | 3 EA | – | 2 / 5 | 6 / 7 / 30 | 27 by 01 Oct 2026 | 10% | Rp 273,645 |
| 4100087119 FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-4 | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 5 / 6 / 13 | 11 by 01 Oct 2026 | 10% | Rp 33.3M |
| 4200006541 FAN,COOLING MOTOR,MODEL TX506,VITON | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 4 / 4 / 6 | 5 by 01 Oct 2026 | 10% | Rp 6.3M |
| 4100005608 SEAL,MECHANICAL,TYPE EQ517,MONEL | A | ReorderNormal | Slow-moving | 1 SET | – | 1 / 2 | 3 / 3 / 4 | 3 by 01 Oct 2026 | 10% | Rp 283.8M |
| 4300003237Long-leadSign-off BLADE,ROTOR,DWG.232-7091,FOR KT-397A | A | Reduce | Non-moving | 207 SET | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 94.9B |
| 4100033183 FLANGE,SO,8IN,150#,A105,RF | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 10 / 10 / 15 | 13 by 01 Oct 2026 | 9% | Rp 12.6M |
| 4100108636 OIL,LUBRICANT,ISO VG 220,SYNTHETIC,209L | A | TransferNormal | Slow-moving | 4 L | – | 1 / 2 | 39 / 40 / 73 | transfer 69 from 4100107016 | 9% | – |
| 4100094160 TUBE PLUG,EXCHANGER,SIZE DV624,VITON | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 2 / 2 / 4 | 4 by 01 Oct 2026 | 21% | Rp 2.0M |
| 4100072467 FIREBRICK,INSUL,28,76T,114W,230L | C | ReorderHigh | Stockout | 0 EA | – | 0 / 0 | 0 / 0 / 400 | 400 by 01 Oct 2026 | 21% | Rp 63.0M |
| 4100088232Sign-off BLADE,ROTOR,SIZE GR627,SS304 | S | Reduce | Potentially obsolete | 245 SET | – | 4 / 8 | don't stock | – | 0% | −Rp 93.5B |
| 4100000532Long-lead BEARING,ROLLER,CYL,1ROW,6319 | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 5 / 5 / 10 | 8 by 01 Oct 2026 | 9% | Rp 20.3M |
| 4300051311 COUPLING,DWG.237-7110,FOR PP-244A | C | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 2 / 2 / 4 | 4 by 01 Oct 2026 | 20% | Rp 34.2M |
| 4100017230Safety-critical GASKET,SHEET,1IN,300#,PTFE | A | ReorderNormal | Slow-moving | 3 EA | – | 1 / 3 | 12 / 12 / 19 | 16 by 01 Oct 2026 | 9% | Rp 3.4M |
| 4300060648 COUPLING,DWG.241-4360,FOR KC-843 | S | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 0 / 0 / 3 | 3 by 01 Oct 2026 | 45% | Rp 25.7M |
| 4300054058 SLEEVE,SHAFT,DWG.370-7275,FOR PP-1766A | A | ReorderNormal | Slow-moving | 1 EA | – | 0 / 0 | 2 / 2 / 4 | 3 by 01 Oct 2026 | 9% | Rp 24.3M |
| 4300028288 TRIM SET,CONTROL VALVE,DWG.663-2115,FOR | C | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 20% | Rp 78.5M |
| 4100016423 GASKET,SHEET,3IN,150#,GR/304 | A | ReorderNormal | Below reorder point | 3 EA | – | 1 / 3 | 4 / 4 / 11 | 8 by 01 Oct 2026 | 9% | Rp 17.3M |
| 4100049141 POSITIONER,VALVE,SIZE OZ128,CS | C | ReorderHigh | Stockout | 0 EA | – | 1 / 3 | 0 / 0 / 1 | 1 by 01 Oct 2026 | 19% | Rp 39.9M |
| 4300030789 SLEEVE,SHAFT,DWG.796-2907,FOR PP-1320D | B | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 3 / 3 / 5 | 4 by 01 Oct 2026 | 11% | Rp 32.4M |
| 4100026647 STUDBOLT,7/8INX50MM,B8M/8M | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 31 / 32 / 62 | 60 by 01 Oct 2026 | 9% | Rp 632,760 |
| 4100015663Safety-critical GASKET,SW,8IN,600#,PTFE | C | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 10 / 10 / 16 | 14 by 01 Oct 2026 | 8% | Rp 986,384 |
| 4100016049 GASKET,SW,1IN,600#,PTFE | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 10 / 10 / 16 | 14 by 01 Oct 2026 | 8% | Rp 3.0M |
| 4100043044 TUBING,TYPE JV11,SS304 | B | ReorderNormal | Below reorder point | 35 M | – | 19 / 44 | 70 / 78 / 163 | 128 by 01 Oct 2026 | 10% | Rp 11.5M |
| 4100079731 ANCHOR,REFRACTORY,MODEL SS521,A105 | S | ReorderHigh | Slow-moving | 10 EA | – | 8 / 18 | 24 / 50 / 191 | 181 by 01 Oct 2026 | 41% | Rp 7.6M |
| 4100005289Long-lead SEAL,MECHANICAL,MODEL BN65,MONEL | A | ReorderNormal | Slow-moving | 3 SET | – | 1 / 2 | 3 / 4 / 6 | 3 by 01 Oct 2026 | 8% | Rp 294.7M |
| 4300070721Sign-off SEAL,LABYRINTH,DWG.296-1883,FOR KT-513 | A | Reduce | Non-moving | 848 SET | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 80.1B |