Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 17 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100019660 O-RING,VITON,184MM ID,5.3MM CS | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 12 / 13 / 28 | 26 by 01 Oct 2026 | 25% | Rp 2.4M |
| 4100005386 SEAL,MECHANICAL,MODEL EH530,A182F11 | A | ReorderNormal | Slow-moving | 2 SET | – | 0 / 0 | 4 / 5 / 7 | 5 by 01 Oct 2026 | 25% | Rp 472.9M |
| 4100015570 GASKET,RING,10IN,600#,PTFE | B | ReorderNormal | Below reorder point | 5 EA | – | 2 / 6 | 15 / 17 / 42 | 37 by 01 Oct 2026 | 31% | Rp 7.9M |
| 4100059992 TRANSMITTER,TEMP,TYPE XP405,PTFE | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 3 / 3 / 5 | 4 by 01 Oct 2026 | 25% | Rp 136.6M |
| 4100019638 O-RING,EPDM,286MM ID,2.5MM CS | A | ReorderNormal | Below reorder point | 1 EA | – | 2 / 5 | 8 / 8 / 20 | 19 by 01 Oct 2026 | 24% | Rp 753,996 |
| 4300005012Sign-off VALVE,GOVERNOR,DWG.250-6485,FOR KT-460B | A | Reduce | Non-moving | 988 ASS | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 235.2B |
| 4100101773 ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B | C | TransferHigh | Stockout | 0 CAN | – | 5 / 9 | 7 / 8 / 48 | transfer 48 from 4100101905, 4100101705, 4100102446 | 52% | – |
| 4300004481Sign-off BLADE,ROTOR,DWG.831-1269,FOR KT-397A | A | Reduce | Non-moving | 610 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 232.3B |
| 4100059023 TRANSMITTER,TEMP,TYPE CE324,CS | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 4 / 4 / 6 | 5 by 01 Oct 2026 | 23% | Rp 170.7M |
| 4100025651 STUDBOLT,1INX115MM,B7/2H | A | ReorderNormal | Slow-moving | 21 EA | – | 5 / 12 | 132 / 144 / 343 | 322 by 01 Oct 2026 | 23% | Rp 12.2M |
| 4300042157 SEAL,LABYRINTH,DWG.417-4406,FOR KC-801 | A | ReorderNormal | Slow-moving | 1 SET | – | 0 / 0 | 2 / 2 / 4 | 3 by 01 Oct 2026 | 22% | Rp 283.8M |
| 4100008748Long-lead SLEEVE,SHAFT,MODEL AY661,MONEL | A | ReorderNormal | Slow-moving | 2 EA | 1 | 1 / 3 | 6 / 7 / 9 | 6 by 01 Oct 2026 | 22% | Rp 98.6M |
| 4100015095 GASKET,RING,8IN,150#,GR/304 | A | ReorderNormal | Below reorder point | 1 EA | 2 | 1 / 2 | 11 / 11 / 19 | 16 by 01 Oct 2026 | 22% | Rp 9.9M |
| 4100015404 GASKET,SW,3/4IN,300#,PTFE | A | ReorderNormal | Slow-moving | 4 EA | – | 1 / 2 | 20 / 21 / 44 | 40 by 01 Oct 2026 | 22% | Rp 8.6M |
| 4100103502 TAPE,PTFE,19MMX15M | C | ReorderHigh | Below reorder point | 4 RL | – | 2 / 4 | 18 / 24 / 131 | 110 by 01 Oct 2026 transfer 17 from 4100104353, 4100103607, 4100104489, 4100104110, 4100104014 | 47% | Rp 1.5M |
| 4100012709Long-lead RING,WEAR,MODEL SW887,INCOLOY | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 6 / 6 / 9 | 7 by 01 Oct 2026 | 21% | Rp 117.4M |
| 4100046965 DIAPHRAGM,ACTUATOR,SIZE EV892,SS304 | A | ReorderNormal | Below reorder point | 2 EA | – | 0 / 0 | 5 / 6 / 10 | 8 by 01 Oct 2026 | 21% | Rp 35.1M |
| 4100061222 THERMOCOUPLE,J-1ELMNT,3.2X3500LG | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 4 / 4 / 7 | 6 by 01 Oct 2026 | 21% | Rp 12.4M |
| 4100026990Safety-critical STUDBOLT,3/4INX110MM,B16/4 | A | ReorderNormal | Slow-moving | 18 EA | – | 16 / 42 | 100 / 108 / 244 | 226 by 01 Oct 2026 | 21% | Rp 8.5M |
| 4300014662 SEAT RING,VALVE,DWG.818-3913,FOR TCV-182 | A | ReorderNormal | Slow-moving | 1 EA | – | 0 / 0 | 3 / 3 / 5 | 4 by 01 Oct 2026 | 21% | Rp 45.1M |
| 4100062573 THERMOCOUPLE,N-2ELMNT,6.4X1600LG | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 4 / 4 / 8 | 7 by 01 Oct 2026 | 21% | Rp 44.8M |
| 4100079353 ANCHOR,REFRACTORY,TYPE UL206,SS304 | A | ReorderNormal | TAM reserve | 334 EA | – | 0 / 0 | 621 / 700 / 1,092 | 758 by 01 Oct 2026 | 20% | Rp 31.8M |
| 4100026095 STUDBOLT,1/2INX50MM,B8M/8M | A | ReorderNormal | Slow-moving | 15 EA | – | 3 / 8 | 50 / 54 / 108 | 93 by 01 Oct 2026 | 20% | Rp 7.7M |
| 4100016281 GASKET,RING,12IN,150#,GR/304 | A | ReorderNormal | Below reorder point | 6 EA | – | 5 / 8 | 21 / 25 / 74 | 68 by 01 Oct 2026 | 20% | Rp 14.6M |
| 4100025390 STUDBOLT,1INX30MM,B16/4 | A | ReorderNormal | Slow-moving | 6 EA | – | 5 / 13 | 38 / 40 / 88 | 82 by 01 Oct 2026 | 20% | Rp 1.4M |
| 4100007611 IMPELLER,TYPE NO705,NBR | A | ReorderNormal | Slow-moving | 1 EA | – | 0 / 0 | 2 / 2 / 4 | 3 by 01 Oct 2026 | 19% | Rp 306.3M |
| 4100045791Safety-critical PACKING SET,VALVE,TYPE EV605,MONEL | C | ReorderNormal | Slow-moving | 1 SET | – | 1 / 2 | 4 / 4 / 6 | 5 by 01 Oct 2026 | 19% | Rp 19.2M |
| 4100024968 STUDBOLT,5/8INX50MM,B16/4 | A | ReorderNormal | Below reorder point | 2 EA | – | 1 / 3 | 23 / 24 / 47 | 45 by 01 Oct 2026 | 19% | Rp 764,955 |
| 4100055552Long-lead TRANSMITTER,PRESS,SIZE IG306,SS304 | A | ReorderNormal | Slow-moving | 2 EA | – | 3 / 5 | 5 / 6 / 8 | 6 by 01 Oct 2026 | 18% | Rp 185.7M |
| 4100019618Safety-critical O-RING,NBR,257MM ID,2.5MM CS | A | ReorderNormal | Below reorder point | 2 EA | – | 0 / 0 | 12 / 12 / 26 | 24 by 01 Oct 2026 | 18% | Rp 4.7M |
| 4100067997Safety-critical DISC,SAFETY VALVE,SIZE OT516,SS304 | A | ReorderNormal | Below reorder point | 3 EA | – | 0 / 0 | 5 / 6 / 12 | 9 by 01 Oct 2026 | 18% | Rp 112.9M |
| 4100061538 THERMOCOUPLE,K-2ELMNT,6.4X3400LG | A | ReorderNormal | Slow-moving | 2 EA | – | 0 / 0 | 5 / 6 / 13 | 11 by 01 Oct 2026 | 18% | Rp 31.7M |
| 4100020384 O-RING,NBR,123MM ID,5.3MM CS | B | ReorderNormal | Below reorder point | 2 EA | – | 1 / 2 | 9 / 9 / 19 | 17 by 01 Oct 2026 | 22% | Rp 674,628 |
| 4200001422 GLAND,CABLE,SIZE UC872,A105 | A | ReorderNormal | Below reorder point | 1 EA | – | 0 / 0 | 5 / 5 / 10 | 9 by 01 Oct 2026 | 18% | Rp 1.7M |
| 4100020051 O-RING,EPDM,20MM ID,3.5MM CS | A | ReorderNormal | Below reorder point | 1 EA | – | 1 / 2 | 13 / 13 / 24 | 23 by 01 Oct 2026 | 18% | Rp 912,732 |
| 4300033228Sign-off BLADE,ROTOR,DWG.933-4759,FOR KT-624A | S | Reduce | Potentially obsolete | 461 SET | – | 5 / 16 | don't stock | – | 0% | −Rp 175.9B |
| 4100020134Safety-critical O-RING,EPDM,63MM ID,3.5MM CS | A | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 8 / 8 / 19 | 17 by 01 Oct 2026 | 17% | Rp 674,628 |
| 4300039461Long-leadSign-off BEARING,THRUST PAD,DWG.563-7426,FOR KT-4 | A | Reduce | Non-moving | 862 SET | 1 | 10 / 30 | 0 / 0 / 1 | – | 0% | −Rp 168.6B |
| 4100076597 CERAMIC FIBER,BLANKET,25T,96KG/M3,1260C | A | TransferNormal | Slow-moving | 1 RL | – | 1 / 2 | 4 / 4 / 9 | transfer 8 from 4100076970 | 17% | – |
| 4100033024 FLANGE,SO,1-1/2IN,300#,SS316,RF | A | ReorderNormal | Below reorder point | 11 EA | – | 3 / 6 | 18 / 23 / 77 | 66 by 01 Oct 2026 | 16% | Rp 18.9M |
| 4100031195 TEE,1-1/2IN,SCH40,A105,BW | A | ReorderNormal | Below reorder point | 8 EA | – | 33 / 50 | 18 / 23 / 73 | 65 by 01 Oct 2026 | 16% | Rp 37.0M |
| 4100028031 PIPE,1-1/2IN,STD,CS,SMLS,6M LG | A | ReorderNormal | Below reorder point | 2 LG | – | 1 / 3 | 6 / 7 / 19 | 17 by 01 Oct 2026 | 16% | Rp 29.1M |
| 4100045425Safety-critical PACKING SET,VALVE,TYPE WL414,SS316 | A | ReorderNormal | Slow-moving | 1 SET | – | 1 / 2 | 4 / 4 / 6 | 5 by 01 Oct 2026 | 15% | Rp 19.2M |
| 4100015432 GASKET,SHEET,6IN,150#,PTFE | A | ReorderNormal | Slow-moving | 4 EA | – | 3 / 5 | 13 / 14 / 27 | 23 by 01 Oct 2026 | 15% | Rp 4.9M |
| 4100099790 BOLT,ANCHOR,SIZE WP610,CS | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 4 / 4 / 15 | 14 by 01 Oct 2026 | 15% | Rp 198,940 |
| 4100046333 PACKING SET,VALVE,TYPE JY575,VITON | C | ReorderHigh | Stockout | 0 SET | – | 0 / 0 | 2 / 2 / 4 | 4 by 01 Oct 2026 | 32% | Rp 38.4M |
| 4100003401 BEARING,ROLLER,CYL,1ROW,7218 C3 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 6 / 6 / 10 | 9 by 01 Oct 2026 | 14% | Rp 12.8M |
| 4100015050 GASKET,SW,3/4IN,150#,GR/304 | B | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 4 / 4 / 9 | 8 by 01 Oct 2026 | 17% | Rp 11.2M |
| 4100025739Safety-critical STUDBOLT,7/8INX85MM,B16/4 | A | ReorderNormal | Below reorder point | 12 EA | – | 8 / 22 | 85 / 91 / 198 | 186 by 01 Oct 2026 | 14% | Rp 7.0M |
| 4100024792Safety-critical STUDBOLT,7/8INX40MM,B8M/8M | B | ReorderNormal | Slow-moving | 30 EA | – | 19 / 41 | 62 / 66 / 143 | 113 by 01 Oct 2026 | 14% | Rp 4.3M |