Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 4 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100008829 SLEEVE,SHAFT,SIZE JT533,A182F11 | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 4 / 4 / 6 | 6 by 01 Oct 2026 | 44% | Rp 48.5M |
| 4100048576Long-lead POSITIONER,VALVE,TYPE YV85,NBR | A | ReorderCritical | Below reorder point | 1 EA | 1 | 1 / 2 | 7 / 9 / 12 | 10 by 01 Oct 2026 | 44% | Rp 188.5M |
| 4100014582Safety-critical GASKET,SHEET,3/4IN,150#,GRAPHITE | A | ReorderCritical | Below reorder point | 1 EA | – | 3 / 8 | 9 / 10 / 28 | 27 by 01 Oct 2026 | 44% | Rp 18.1M |
| 4100010766 COUPLING,SIZE JT313,NBR | A | ReorderCritical | Stockout | 0 SET | – | 1 / 2 | 4 / 4 / 7 | 7 by 01 Oct 2026 | 43% | Rp 59.9M |
| 4100082499Long-leadSign-off BEARING,THRUST PAD,TYPE EB16,CS | A | ReorderCritical | Below reorder point | 1 SET | 3 | 0 / 0 | 6 / 9 / 10 | 6 by 01 Oct 2026 | 43% | Rp 2.9B |
| 4100010855Long-lead COUPLING,SIZE LR162,PTFE | A | ReorderCritical | Stockout | 0 SET | – | 0 / 0 | 7 / 8 / 12 | 12 by 01 Oct 2026 | 43% | Rp 69.3M |
| 4100024686 STUDBOLT,7/8INX110MM,B7/2H | A | ReorderCritical | Stockout | 0 EA | – | 39 / 69 | 73 / 84 / 262 | 262 by 01 Oct 2026 | 42% | Rp 26.0M |
| 4100075746 CERAMIC FIBER,BLANKET,50T,96KG/M3,1260C | A | TransferCritical | Stockout | 0 RL | – | 1 / 2 | 4 / 4 / 8 | transfer 8 from 4100075634 | 41% | – |
| 4100000437Long-lead BEARING,BALL,1ROW,DEEP GROOVE,6214BDB | A | ReorderCritical | Stockout | 0 EA | – | 4 / 7 | 6 / 6 / 14 | 14 by 01 Oct 2026 | 41% | Rp 7.1M |
| 4100072624Long-lead FIREBRICK,INSUL,28,65T,114W,230L | A | ReorderCritical | Stockout | 0 EA | – | 23 / 41 | 174 / 200 / 306 | 306 by 01 Oct 2026 | 41% | Rp 56.5M |
| 4100046847Long-lead DIAPHRAGM,ACTUATOR,TYPE VB425,SS316 | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 4 / 4 / 6 | 6 by 01 Oct 2026 | 40% | Rp 52.3M |
| 4100014740Safety-critical GASKET,SW,12IN,150#,GRAPHITE | A | ReorderCritical | Below reorder point | 1 EA | – | 1 / 3 | 10 / 12 / 29 | 28 by 01 Oct 2026 | 40% | Rp 6.0M |
| 4100001053Long-lead BEARING,BALL,ANGULAR,7217 C3 | A | ReorderCritical | Stockout | 0 EA | – | 1 / 2 | 4 / 4 / 9 | 9 by 01 Oct 2026 | 40% | Rp 24.8M |
| 4100000874 BEARING,BALL,ANGULAR,6210BDB | A | ReorderCritical | Stockout | 0 EA | – | 1 / 2 | 6 / 6 / 12 | 12 by 01 Oct 2026 | 40% | Rp 17.1M |
| 4100014553Safety-critical GASKET,SHEET,3/4IN,300#,PTFE | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 12 / 13 / 32 | 32 by 01 Oct 2026 | 39% | Rp 32.2M |
| 4100047000Long-lead DIAPHRAGM,ACTUATOR,SIZE WS199,NBR | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 5 | 5 by 01 Oct 2026 | 39% | Rp 59.7M |
| 4100008564 IMPELLER,SIZE HY82,A105 | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 4 / 4 / 6 | 6 by 01 Oct 2026 | 39% | Rp 612.6M |
| 4300030794 SLEEVE,SHAFT,DWG.609-1906,FOR PP-1320D | B | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 5 | 5 by 01 Oct 2026 | 48% | Rp 40.4M |
| 4100053594Safety-criticalLong-lead SWITCH,LIMIT,MODEL LY687,GRAPHITE | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 6 / 6 / 10 | 10 by 01 Oct 2026 | 39% | Rp 69.1M |
| 4100014371Safety-critical GASKET,SHEET,1/4IN,600#,PTFE | A | ReorderCritical | Stockout | 0 EA | – | 15 / 22 | 9 / 10 / 25 | 25 by 01 Oct 2026 | 38% | Rp 5.4M |
| 4100043354Long-leadSign-off TRIM SET,CONTROL VALVE,TYPE FG409,A105 | A | ReorderCritical | Stockout | 0 SET | 3 | 0 / 0 | 6 / 8 / 10 | 7 by 01 Oct 2026 | 37% | Rp 1.3B |
| 4100082577 BEARING,THRUST PAD,MODEL DK254,GRAPHITE | A | ReorderCritical | Stockout | 0 SET | – | 0 / 0 | 2 / 2 / 3 | 3 by 01 Oct 2026 | 37% | Rp 657.8M |
| 4100034981 VALVE,GATE,4IN,800#,CF8,RF | A | ReorderCritical | Stockout | 0 EA | – | 1 / 2 | 6 / 6 / 13 | 13 by 01 Oct 2026 | 37% | Rp 34.2M |
| 4100000788 BEARING,BALL,ANGULAR,NU318BDB | A | ReorderCritical | Stockout | 0 EA | 1 | 1 / 2 | 4 / 4 / 9 | 8 by 01 Oct 2026 | 36% | Rp 26.7M |
| 4100050635Long-lead SEAT RING,VALVE,MODEL GA514,SS304 | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 4 / 4 / 6 | 6 by 01 Oct 2026 | 36% | Rp 70.9M |
| 4100043447 TRIM SET,CONTROL VALVE,MODEL YO607,SS316 | A | ReorderCritical | Stockout | 0 SET | – | 0 / 0 | 5 / 6 / 9 | 9 by 01 Oct 2026 | 36% | Rp 706.4M |
| 4100028227 PIPE,3IN,SCH40,SS316,SMLS,6M LG | A | ReorderCritical | Slow-moving | 2 LG | – | 1 / 2 | 18 / 20 / 38 | 36 by 01 Oct 2026 | 36% | Rp 61.6M |
| 4100035524 VALVE,GATE,10IN,150#,A105,SW | A | ReorderCritical | Slow-moving | 1 EA | – | 1 / 2 | 13 / 15 / 25 | 24 by 01 Oct 2026 | 36% | Rp 63.1M |
| 4100082549 BEARING,THRUST PAD,MODEL DQ121,VITON | A | ReorderCritical | Below reorder point | 1 SET | – | 1 / 2 | 3 / 4 / 5 | 4 by 01 Oct 2026 | 35% | Rp 877.0M |
| 4100082772Sign-off BEARING,THRUST PAD,SIZE KZ121,GRAPHITE | A | ReorderCritical | Slow-moving | 1 SET | – | 1 / 2 | 2 / 4 / 7 | 6 by 01 Oct 2026 | 35% | Rp 1.3B |
| 4300047163Safety-criticalLong-lead SPRING,SAFETY VALVE,DWG.601-7012,FOR PRV | S | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 5 | 5 by 01 Oct 2026 | 35% | Rp 19.7M |
| 4100069671Safety-critical NOZZLE,SAFETY VALVE,TYPE UO887,A182F11 | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 4 | 4 by 01 Oct 2026 | 35% | Rp 81.1M |
| 4100024659Safety-critical STUDBOLT,3/4INX80MM,B7/2H | A | ReorderCritical | Slow-moving | 13 EA | – | 11 / 21 | 248 / 288 / 712 | 699 by 01 Oct 2026 | 35% | Rp 35.2M |
| 4100050234 SEAT RING,VALVE,SIZE MG172,SS304 | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 5 | 5 by 01 Oct 2026 | 34% | Rp 39.9M |
| 4100058961Long-lead TRANSMITTER,TEMP,MODEL BJ883,GRAPHITE | A | ReorderCritical | Stockout | 0 EA | 1 | 1 / 2 | 6 / 6 / 8 | 7 by 01 Oct 2026 | 34% | Rp 181.5M |
| 4100066098Safety-criticalLong-lead SPRING,SAFETY VALVE,SIZE QV915,NBR | A | ReorderCritical | Stockout | 0 EA | 4 | 0 / 0 | 8 / 10 / 14 | 10 by 01 Oct 2026 | 34% | Rp 114.0M |
| 4100045585Safety-criticalLong-lead PACKING SET,VALVE,SIZE QQ367,PTFE | A | ReorderCritical | Stockout | 0 SET | 1 | 3 / 8 | 4 / 4 / 7 | 6 by 01 Oct 2026 | 34% | Rp 26.2M |
| 4100014949Safety-critical GASKET,SW,6IN,300#,GR/304 | A | ReorderCritical | Below reorder point | 1 EA | – | 1 / 2 | 8 / 9 / 22 | 21 by 01 Oct 2026 | 34% | Rp 2.2M |
| 4100059089 TRANSMITTER,TEMP,MODEL OC176,MONEL | B | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 6 / 7 / 11 | 11 by 01 Oct 2026 | 42% | Rp 375.5M |
| 4300006977Long-lead COUPLING,DWG.917-2849,FOR KC-536A | A | ReorderCritical | Stockout | 0 SET | – | 0 / 0 | 3 / 3 / 5 | 5 by 01 Oct 2026 | 33% | Rp 12.4M |
| 4100008733Long-lead SLEEVE,SHAFT,TYPE NY787,A182F11 | A | ReorderCritical | Below reorder point | 1 EA | 3 | 1 / 2 | 7 / 10 / 13 | 9 by 01 Oct 2026 | 33% | Rp 228.3M |
| 4100000669 BEARING,BALL,ANGULAR,6213 | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 5 / 5 / 10 | 10 by 01 Oct 2026 | 33% | Rp 18.7M |
| 4100079068 ANCHOR,REFRACTORY,SIZE YM635,CS | A | ReorderCritical | Below reorder point | 1,000 EA | – | 0 / 0 | 3,836 / 5,000 / 6,500 | 5,500 by 01 Oct 2026 | 32% | Rp 230.9M |
| 4100069722Safety-criticalLong-lead NOZZLE,SAFETY VALVE,SIZE CH112,MONEL | C | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 5 / 5 / 7 | 7 by 01 Oct 2026 | 32% | Rp 51.0M |
| 4300070823Long-lead SEAT RING,VALVE,DWG.861-9531,FOR PCV-153 | B | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 5 | 5 by 01 Oct 2026 | 39% | Rp 31.9M |
| 4100066116Safety-critical SPRING,SAFETY VALVE,MODEL XY234,VITON | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 4 | 4 by 01 Oct 2026 | 31% | Rp 35.3M |
| 4300046576 SEAL,LABYRINTH,DWG.241-6258,FOR KC-308B | A | ReorderCritical | Stockout | 0 SET | – | 0 / 0 | 2 / 2 / 3 | 3 by 01 Oct 2026 | 30% | Rp 283.8M |
| 4300040172 SPRING,SAFETY VALVE,DWG.147-9150,FOR KT- | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 4 | 4 by 01 Oct 2026 | 30% | Rp 35.3M |
| 4100079085 ANCHOR,REFRACTORY,TYPE LF931,PTFE | A | ReorderCritical | TAM reserve | 14 EA | – | 14 / 25 | 924 / 1,050 / 1,544 | 1,530 by 01 Oct 2026 | 30% | Rp 64.2M |
| 4100093500 TUBE PLUG,EXCHANGER,SIZE LH988,VITON | A | ReorderCritical | Stockout | 0 EA | – | 0 / 0 | 3 / 3 / 5 | 5 by 01 Oct 2026 | 30% | Rp 2.5M |